Bio
Experience
-
-
Assistant Vice President - Projects
-
May 2006 - Present
-
-
-
BGR Energy Systems Ltd
-
Chennai Area, India
-
General Manager
-
May 2006 - Present
-
Chennai Area, India
specific assignment for establishing a full fledged Coal Handling department for executing complete coal handling plants in house. This includes finalization of layout with client, Engineering drawings, Procurement of all CHP sub components, Fabrication and erection of structurals at site, Equipment erection and Testing and commissioning of complete coal handling unit as system simultaneously along with BOP package of Thermal Power Plant.Taken additional responsibility of preparation of complete estimates of Coal handling Plants above 500 MW.Responsible for complete execution of large coal handling plants which includes design, engineering, selection of equipment, procurement, planning, supply, site construction, erection , commissioning including PG test and handing over to the client.Also responsible for project & contract handling of CHP independently supported by a team of 50 Managers , Engineers and Draftsman at head office and 30 Sr.Managers, Engineers at all site locations.ACHIEVEMENTHanded over CHP of 1 X 500 MW Vijayawada Thermal Power Station Stage-IV, for APGENCOHanded over CHP of 1 X 500 MW Kakatiya Thermal Power Project, Stage-I, for APGENCO. Handed over CHP of 1 X 500 MW Kothagudem TPS, for APGENCOCommissioned and under PG Test operation CHP of 1 X 500 MW Khaperkheda TPS, MAHAGENCOProjects under execution 1 X 600 MW Mettur TPS, Tamilnadu Electricity Board - Plant Synchorinised and CHP under load trial operation2 X 600 MW Kalisindh TPP, Rajasthan Rajya Vidyut Utpadan Nigam ltd - Coal Handling Plant under advance stage of commissioning.2 X 500 MW BOP Chandrapur STPS, MAHAGENCO under execution.2 X 500 MW BOP Marwa TTPP. Chhattisgarh State Genco - CHP under execution1 X 660 MW BOP Krishnapatnam for TPCIL of CHP under execution
-
-
-
-
Asst. General Manager
-
Sep 2004 - Apr 2006
In charge for 2 X 250 MW Coal handling Plant/Ash Handling, Paricha for UPRVUNLCompleted the total project which includes Wagon Tippler, Side Arm Charger, Apron Feeder and Stacker Reclaimer along with conveyors and its auxiliary equipmentsACHIEVEMENTResponsible for procurement supply , civil work structural fabrication and erection , Equipment erection, commission and PG test , synchronization with complete BOP and Power plant Supply Erection and commissioning of sampling system for NTPC Singrauli.Responsible for procurement supply of 1 x 500 MW Birshingpur TPS for MPEB
-
-
-
-
2 years
-
Mar 2004 - Apr 2006
-
-
-
-
Deputy General Manager
-
Apr 1994 - Aug 2004
In charge for execution of all material handling projects including air port baggage handling system. Major material handling projects executed under my supervision. Lignite handling system for 2 X 210 MW, NLC – Rs 39.7 Crore – Work includes construction 10000 Ton Capacity RCC Bunker.Iron Ore Handling System for Kudurmukh Iron & Steel Company at Mangalore – Rs. 26 Crore. The total work was executed within scheduled delivery period & the project was handed over. The complete retention amount along with additional claim was collected from client. An appreciation letter with cash award was rewarded by management.Iron ore handling system for Jindal, Vijaynagar – Rs. 26 CroreIron ore handling system ISPAT Industries – Rs 16 Crore. Similar type of project less than 10 Crore not indicated here
-
-
-
-
Chief Manager
-
Aug 1989 - Mar 1994
Execution of large material handling plants for Power Plants, steel plant, paper industries of approximately Rs. 100 Crore
-
-
-
-
Asst. Manager/Deputy Manager
-
Jul 1983 - Jul 1989
Execution of large bulk handling rope way system (Industrial & Passengers) and conveyors. Projects executed:650 Ton bi-cable rope way for transportation of lime stone from mines to cement plant for Manikgarh cements- an appreciation letter from CEO received.Industrial rope way for Rassi Cement, 18 KM Mono cable ropeway for Diamond cement DamoehPassenger rope way(Gondola cable car system) at Gulmarg for J & K Tourism with Pomaglaski, France.Passenger rope way for Government of Gujarat at Pavagarh.Coal handling system for Bankola
-
-
-
-
Junior Engineer/Asst. Engineer
-
Jan 1980 - Jun 1983
Sub division Incharge for fleet of earth moving machineries for land shaping purpose, operation, maintenance, billing and realization.
-
-
Education
-
Harcourt Butler Technological Institute, Kanpur University
Bachelor of Technology, Mechanical Engineering -
Samstipur College
Bachelor of Sciences, Chemistry -
CM College
Intermediate Science, Maths; Physics & Chemistry -
Bihar Secondary School Examination Board
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Oil and Gas”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community