Bio
Experience
-
Belectric Uk
-
United Kingdom
-
Renewable Energy Semiconductor Manufacturing
-
1 - 100 Employee
-
Manager
-
Jan 2023 - Present
-
Swindon, England, United Kingdom
I am implementing sustainability practices, including pollution remediation, sustainable engineering, and reduction in carbon emissions, in green energy projects. My goal is to contribute to the net-zero target by utilizing renewable energy sources and implementing sustainable engineering practices. -Managing multiple solar farm projects across various locations in the UK with a total capacity of 150 megawatts peak (MWP).
-
-
-
Re Sustainability Limited
-
India
-
Environmental Services
-
700 & Above Employee
-
Assistant Manager
-
Dec 2019 - Sep 2021
-
Hyderabad, Telangana
- Led a team of highly skilled engineers for multiple Municipal solid waste management projects in India, ensuring successful implementation of waste collection, transportation, processing, disposal, and leachate management. - Spearheaded project management for DBFOT projects in major cities of India, utilizing acquired skills to ensure efficient and timely project completion. - Accountable for the successful delivery of 8 major Municipal waste management projects, gaining extensive knowledge of solid waste treatment methodology from collection to disposal and energy recovery from reduced derived fuel. - Strengthened my knowledge of sustainability and SDGs, ensuring sustainable practices were implemented throughout the project lifecycle.
-
-
-
Al malki Holding - ArabianMEP
-
Doha, Qatar
-
Quantity Surveyor
-
Feb 2017 - May 2019
-
Doha, Qatar
- Contributed to the success of several prestigious projects at Al-Malki Holding, including the development of Qeitifan Island (infrastructure utilities for Lusail smart city), Lusail Marina COM20 Tower, and the multimillion-Qatari-riyal project for the development of ISF Camp (a mixed development of 23 buildings and 4 substations) and infrastructure utilities for the Internal Security Force in Doha, Qatar. - Accountable for end-to-end contract management, from the preparation of billing schedules to project closeout, ensuring that all deliverables were met as per FIDIC standards. - Successfully managed subcontractors from contract award to closure, including monthly interim payments and claims certifications, while also submitting variation claims as per design changes for infrastructure utilities and building MEP services. - Expertly prepared extension of time claims with all necessary write-ups, analysis, and cost in coordination with the planning team, ensuring that all projects were completed on time and within budget. - Led the final project handover and prepared the statement of accounts, while also overseeing budgeting, cost control, and fixing monthly lookahead for billing and progress monitoring.
-
-
-
Eta Engineering Private Limited
-
India
-
Industrial Machinery Manufacturing
-
700 & Above Employee
-
Quantity Surveyor
-
Jul 2016 - Jan 2017
-
Doha, Qatar
-Played an integral role in the prestigious Multi-million Qatari Riyal Msherib downtown project in Doha as a Quantity Surveyor, contributing to the successful completion of the project. -Gained valuable exposure to the construction industry by working alongside international consultants, providing a wealth of experience and knowledge. -As a Quantity Surveyor, developed a strong understanding of the importance of claims, as per FIDIC red book, ensuring compliance with industry standards. -Utilized strong attention to detail to quantify revisional changes in client drawings, successfully submitting variation claims as per contract changes, and ensuring project success.
-
-
-
-
India
-
Environmental Services
-
700 & Above Employee
-
Project Engineer
-
Apr 2014 - Apr 2015
-Accountable for the successful delivery of a project as a Project Engineer, overseeing the CMWSSB Sholiganallur pumping station cluster with water supply and sewage collection networks. -Coordinated a team of engineers for all aspects of the project, including Design, Civil Construction, Mechanical and Electrical procurement, MEP erection works, Inspection, Quality Assurance, and Stakeholder Management. -Successfully managed the subcontractors, overseeing the entire process from procurement to billing, and ultimately work order closeout. -Maintained an unwavering focus on delivering high-quality projects on time, within budget, and exceeding client expectations.
-
-
Graduate Engineeing Trainee- Projects
-
Dec 2013 - Mar 2014
-Provided exceptional support to the construction team, particularly in Mechanical, Electrical, and Instrumentation, to successfully commission water treatment plants. -Played a key role in the Performance Guarantee Test Run (PGTR) process of a water treatment plant project in Kolkata, India, ensuring that all customer requirements were met according to the contract. -Undertook critical tasks related to project closeouts, such as final invoicing, procurement of commission and operational spares, chemicals, and technical documentation. -Successfully transitioned from a Civil Engineer to a Project Management Professional, with a focus on delivering high-quality projects on time and within budget.
-
-
Graduate Engineering Trainee - Projects
-
Oct 2012 - Nov 2013
-As a Graduate Trainee in the Projects Department for the Kolkata Metropolitan Development Authority (KMDA), executed the KMDA Water Treatment Plant (WTP) at Bally and the Kolkata Municipal Corporation (KMC) Telipara Water Supply Pumping Station projects in Kolkata, India. -Worked under the guidance of experienced managers and took up challenging tasks in project execution while focusing on delivering results. -Managed Purchase Requisition, Supply Chain Management, Construction, MEP Construction, Testing and Commissioning, and handing over of projects. -Gained a deep understanding of project finances and evaluated cash flows to maintain the contribution margin. -Enhanced knowledge of water treatment and mechanical, electrical, and instrumentation requirements for treatment plants, directly from design and implementing the same at the site. -Understood the importance of MEP and Instrumentation in establishing a process-oriented infrastructure project. -Successfully managed contractors, manufacturers, and other stakeholders to ensure timely completion of projects while maintaining high-quality standards.
-
-
Graduate Engineering Trainee - Site Engineer
-
Jun 2012 - Sep 2012
-Successfully managed Madhavaram Pumping Station project packages 2 & 4 and developed an 18 km pipeline network as a Site Engineer for the Chennai Metro project. -Gained hands-on experience with sewage pumping stations and well construction through sinking well methodology, while also overseeing quantity estimation, supervision, and daily progress updates. -Developed valuable skills in project management, team coordination, and problem-solving, and ensured project completion within strict deadlines and budget constraints.
-
-
Education
-
2021 - 2022Newcastle University
Master's degree, Environmental/Environmental Health Engineering -
2015 - 2016National Institute of Construction Management & Research (NICMAR)
Post Graduation, Quantity Surveying and Contract Management -
2008 - 2012Aarupadai Veedu Institute Of Technology
Bachelor of Engineering - BE, Civil Engineering -
2003 - 2008St.Pius X School (ICSE) , Kuttikanam, Peermade,Idukki, Kerala
High School
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Renewable Energy Semiconductor Manufacturing”
Need a custom project? We'll create a solution designed specifically for your project.
References
Community