DPS Shipyard is a repair yard for vessel up to 900 tonnes.As Yard managing director:• Responsible for all ship repair and Miscellaneous activities.• Ensure compliance with all environmental and safety rules.• Travel to down-river work sites to direct, coordinate, inspect and estimate projects.• Check progress and efficiency of operations.• Coordinate labor and other resources to follow the critical path and ensure completion within the performance period.• Work as liaison to the costumer• Work closely with Project Managers/Estimators to estimate bids and change orders and to coordinate the efficient progress of all projects.• Submit Change Order Requests to the Project Manager.• Order materials, equipment and sub-contractors to efficiently progress each project.• Report to Bolloré group branch manager.• Propose strategy to develop yard activity and execute• Propose and execute of investment strategies in order to support and develop the activityDPS Shipyard is a repair yard for vessel up to 900 tonnes for an annual turnover at about 3.5 million euros.
-
-
-
CARENA SHIP REPAIR
-
Cote D’Ivoire (Ivory Coast)
-
Project Manager
-
Mar 2018 - Mar 2021
-
Cote D’Ivoire (Ivory Coast)
As project management in ship repair:For a single project typical operation : • Preparation of the project based on technical specification - Schedule setting up - Preparation of all means required to conduct the project - Sub-contractors hiring and contract negotiation• During management - Following execution of all works - Quotation of new works - Make sure to keep schedule and departure date • Project closing - Billing negotiation with all subcontractors - Final work reports handling to the client - Final invoice negotiation with the clientOn normal operation a project manager will Handle multiple project at the same timeIn parallele to project management : Providing quotation to clients based on Technical specification prior to ship arrival.
-
-
-
Damen shiprepair Dunkerque
-
Dunkerque (France)
-
Project manager
-
Dec 2014 - Mar 2018
-
Dunkerque (France)
Support engineer for major project- submission to a public tender for a dredger conversion: Propulsion conversion to a dual fuel propulsion LNG / Fuel estimated budget 17 million euros (team of 2 plus sub-contractors). Following awarding of the project to the yard, participation to the first phases of the project (design / contracting)- Find transversal / technical solutions to operational problems - Dry docking calculations / Lifting plan calculation (for loads above 20 tonnes)Project manager: project ranging from 250 k€ to 1,2 million €- Project preparation and execution - Handling financial and technical aspect of projects - Sub-contractors and means
-
-
-
-
Site Project Manager
-
Oct 2012 - Dec 2014
Sister ship vessels 90 m tuna seiner, diesel electric propulsion and super freezer capacity - Following shipbuilding (team of 3 persons) - Improvement of the ship regarding experienceNew vessels 80 m tuna seiner, diesel electric propulsion and super freezer capacity - Analyse of drawing, technical specification and contract - Following shipbuilding (team of 3 persons) - Create the maintenance plan for the new type of shipLocal representative office: - Creation of a local bureau - Hiring of a local staff (with an agent as a middle man) - Management of the officeOther projects and studies: Preliminary feasibility study for a barge to unload and sorting for the whole tuna fleetPreparation of the 5 year visit for a tuna seiner vessel: Work in cooperation with the operation management and crew (during on board period)
-
-
Assistant project manager
-
May 2011 - Sep 2012
Ship owner representative in a shipyard for 90 m tuna seiner fishing vessels, diesel electric propulsions and super freezer capacity (-40°C) - Analyse of drawing, technical specification and contract. - Following shipbuilding (team of 2 persons)Structure, accommodation, on board system, commissioning and trials / working in cooperation with class (Bureau Veritas) and flag authorities (French flag) - Improvement of the ship regarding experience - Other projects and studies: - Preliminary study for fishing in pacific ocean: Based on fishing report from WCF commission to give a general idea what would be the results of fishing operation. - Preliminary study for a tuna processing factory in Papua New Guinea.
-
-
Job tranning
-
Jun 2009 - Aug 2009
- Create a program to help with propeller choices - Design detailed structure drawing of a hull (CAD)- Conception of a fold-out mast (for an existing ship)- Design of an existing boat (transformation of a river barge)- Preliminary hydrostatic study
-
-
Education
-
2006 - 2012Arts et Métiers ParisTech - École Nationale Supérieure d'Arts et Métiers
Master, Gestion de projet -
2004 - 2006La Salle Passy Buzenval
BTS Assistant Technique d'Ingenieur, Preparation for Engineering schools entrance exam (in cooperation with EPMI engineering school)
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. Add an industry
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community