Bio
Experience
-
-
Philippines
-
Facilities Services
-
1 - 100 Employee
-
Project Manager - Widus Expansion Project
-
Mar 2019 - Dec 2021
Managed all aspects of HVAC and MEPF department, technicians,apprentice.Creation and delegation of weekly schedule/ tech assignments.Reviewed work tickets and equipment maintenance reports .Maintained customer satisfaction and long term relationships.Ensured consistency of service and problem resolution.Managed, estimated, and proposed service contracts.Resolve technical problems that technicians would encounter in the field.Trained technicians and apprentices on job site safety.Set and maintained safety performance standards and enforced company rules/ policies/ image.Worked closely with general contractors and customers to insure customer needs and schedules were kept.
-
-
Project Manager - ATG Project - Paseo de Roxas Makati City
-
Dec 2018 - Mar 2019
-
-
Project Manager - Marriott Clark Pampanga
-
Mar 2017 - Jan 2019
-
-
Project Manager - WANA Project - Widus Clark
-
Mar 2018 - Dec 2018
-
Delta Dore Philippines
-
Philippines
-
QA/QC Engineer - NPP3 Project New Port
-
Nov 2016 - Mar 2017
-
Philippines
-
JGC Malaysia Sdn Bhd
-
Bintulu Sarawak, Malaysia
-
Piping Supervisor
-
Aug 2014 - May 2016
-
Bintulu Sarawak, Malaysia
MLNG Train 9 project Malaysia PETRONASPREPARE/ REVIEW REPORTS and FORECAST, including summary of Project Progress and Manpower forecast.Monitor the Activities of the project to ensure compliance with the specification and procedure.Responsible for the implementation of corporate project policies, procedures and the instructions within the assigned operation.Ensure all safety code, requirements and standard are being complied within the assigned area of responsibility.Oversees the implementation of work packages, from approval to work through package close-out and post maintenance testing.Responsible to oversight field construction operation within the assigned area.Monitor schedule of work to be performed and review work accomplishments.Review schedule, Construction method and Procedure as assigned.
-
JGC
-
Surigao del Norte Philippines
-
Piping Supervisor
-
Nov 2012 - Nov 2013
-
Surigao del Norte Philippines
TJCP- TAGANITO HIGH PRESSURE ACID LEACHING(NICKEL MINING); PREPARE/ REVIEW REPORTS and FORECAST, including summary of Project Progress and Manpower forecast.Monitor the Activities of the project to ensure compliance with the specification and procedure.Responsible for the implementation of corporate project policies, procedures and the instructions within the assigned operation.Ensure all safety code, requirements and standard are being complied within the assigned area of responsibility.Oversees the implementation of work packages, from approval to work through package close-out and post maintenance testing.Responsible to oversight field construction operation within the assigned area.Monitor schedule of work to be performed and review work accomplishments.Review schedule, Construction method and Procedure as assigned.
-
JGC
-
ASSALUYEH SOUTHPARS, IRAN
-
PIPING TEST PACKAGE COORDINATOR
-
Jun 2007 - Mar 2008
-
ASSALUYEH SOUTHPARS, IRAN
South Pars Phase 678 Projects. Gas Development. Assaluyeh, IRAN. Joint Venture of: o Toyo Engineering Corporation (TEC)o Industrial Development &Renovation Organization (IDRO)o Japan Gas Corporation (JGC)o Daelim Industrial Company Limited (DIC) . DUTIES AND RESPONSIBILITIES:Responsible for reviewing the contractor’s documents (Test Package).Responsible for updating and monitoring of Database as internal and external control of Test( Punch list).Responsible for preparation of transmittal documents/tracking of approval status.Responsible for preparation of Dossiers for Pre-commissioning Hand-over.Responsible for final inventory of tools and materials.Preparation and maintaining of Dossiers for each piping systems before and during the testing including:Date, time and duration of test.Identification of piping system to be tested.Assigning of P&ID and Isometrics test limit prior for testing.Test fluids and its temperature during hydrostatic test.Test pressure.
-
-
Education
-
Technological University of the Philippines
Mechanical Engineering and Production Technology -
MFI Polytechnic Institute Inc.
Ortigas
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Facilities Services”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community