Bio
Credentials
-
MEMBER NIGERIA SOCIETY OF ENGINEER PORTHARCOURT BRANCH
-Jan, 2012- Apr, 2026 -
NIGERIA INSTITUTE OF SAFETY PROFESSIONAL
Institute of Safety Professional of NigeriaOct, 2008- Apr, 2026 -
BASIC OFFSHORE SAFETY INDUCTION & EMERGENCY TRAINING
BOSIETAug, 2015- Apr, 2026 -
HELICOPTER UNDERWATER ESCAPE TRAINING
HUETMay, 2015- Apr, 2026 -
INDUSTRIAL ROPE ACCESS TRADE ASSOCIATION
IRATAMar, 2015- Apr, 2026 -
CERTIFICATE SCHEME FOR WELDING INSPECTION PERSONNEL(CSWIP) 2006-2011 and 2011-2016
Trinity welding institute United KingdomDec, 2011- Apr, 2026 -
NEBOSH CERTIFIED (1 ,2 & 3)
international general certificateFeb, 2016- Apr, 2026
Experience
-
Sterling Oil Exploration & Energy Production Co. Limited
-
Port Harcourt, Rivers State, Nigeria
-
Consultant- Technical Audit
-
Jun 2021 - Present
-
Port Harcourt, Rivers State, Nigeria
-
-
-
MALYNA INTERNATIONAL
-
Lagos, Nigeria
-
Facility Pipe Line & Piping Engineer
-
Apr 2019 - Mar 2020
-
Lagos, Nigeria
-
-
-
ROMEK AND COMPANY
-
Nigeria
-
QAQC MANAGER
-
Aug 2018 - Mar 2019
-
Nigeria
QAQC Engineer
-
-
-
BENEPROJECTI NIG. LTD.
-
Portharcourt
-
Material Coordinator Portharcourt and Uyo
-
Oct 2017 - May 2018
-
Portharcourt
-
-
-
NEQUIPS INTERNATIONAL
-
PORTHARCOURT NIGERIA
-
Operations Manager
-
Jul 2017 - Oct 2017
-
PORTHARCOURT NIGERIA
-
-
-
Secure Energy Services Inc.
-
portharcourt Nigeria
-
Asset Integrity Engineer
-
Jan 2017 - Jun 2017
-
portharcourt Nigeria
Inspect Asset flow lines, Surface storage tanks and underground storage facilities Inspection On shore and offshore , Recommend Repairs, Inspect Plants, Monitor All Maintenance On Asset.
-
-
-
ATS GLOBAL LINKS PORTHARCOURT NIGERIA
-
Onne Sea Port , Portharcourt Nigeria
-
Project Engineer
-
Feb 2013 - Sep 2016
-
Onne Sea Port , Portharcourt Nigeria
Project Name: Fabrication of 24” Pig Project Name: Installation Of Rov On Seim, Africa Vision Vessels And Others For Chavron Nigeria . Project Name: FABRICATION OF PIG LAUNCHER AND RECIEVER 6" and 12 "6" skids and spools , Skid and Pig Receiver for OML58 ,Client: Total NigeriaProject Name: Fabrication Of 6” Pig Launcher And Receiver For Obgogu Flow station. Joined as fabrication QC coordinator Reporting to project managerProject name: Structural, spool, skid, permanent and temporal pig launcher fabrication. Client: Total NigeriaKey Responsibilities Defect areas should be marked out positively and clearlyEnsure welding is in compliance with welding procedure sheet and application and standard.Hot pass must be timed.Correct methods are applied in cutting and machining.Material composition, type and condition are checked.Dimensions, tolerances, preparation, fit-up and alignment are in accordance with approved drawings.MARINE PLAT FORMProject Name: Installation Of Rov On Seim, Africa Vision Vessels And Others For Chavron Nigeria . Project Name: FABRICATION OF PIG LAUNCHER AND RECIEVER 6" and 12 "6" skids and spools .Joined as project coordinator , welding inspectorReporting to construction manager and leading a team of 20Project name: Pipeline Replacement Project .Major work done on offshore (Key Responsibilities)Inspection of Welding, and work Processes such as root pass tack weldsInspection of Structural member like Floor Beam, Main Deck, HelipadKeeping record of material example heat number, test certificate, grade.Ensuring individual fabricated item must follow procedureDimensional accuracy must be checkedVisual inspection is carried out to ascertain acceptability of appearance of welds.NDT report is assessed.If repairs are required then procedures and welder codes should be authorized.
-
-
-
Marine Platforms ltd
-
AFRICAN VISION VESSEL
-
Maintenance Engineer
-
Feb 2012 - Dec 2014
-
AFRICAN VISION VESSEL
Minor Metal / Steel Fabrication, Project field Engineering .
-
-
-
BGT TECHNICAL PORTHARCOURT
-
Porthacourt Nigeria
-
Qaqc Welding Inspector
-
Feb 2010 - Jun 2012
-
Porthacourt Nigeria
FPSO : FABRICATION OF PIG LAUNCHER AND RECEIVER 6" and 12 "6" skids . Client name; Chevron Offshore (Magi Platform) Position: Safety Coordinator Reporting to: Safety Manager Leading a team of 28 personsResponsibilities ACTIVELY PARTICIPATE IN PRE-TOUR MEETING PRIOR TO ALL NONE ROUTINE DECK OPERATIONS.INSPECT ALL LIFTING EQUIPMENT PRIOR TO USE, I.E. SLINGS, STRAPS, SHACKLES, WIRE ROPES, ETC. ENSURE LIFTED LOADS ARE CLEAR OF OBSTRUCTIONS, BALANCED, AND PROPERLY SECURED WITH TAG LINES.PROVIDE HAND SIGNALS TO THE CRANE OPERATOR DURING DECK OPERATIONS. ASSIST IN THE LOADING AND OFFLOADING OF EQUIPMENT AND SUPPLIES FROM SUPPLY BOATS. PERFORM HELP DECK DUTIES AS DIRECTED BY CRANE OPERATOR OR BARGE SUPERVISOR WHEN APPLICABLE .ASSIST THE DECK PUSHER AND CRANE OPERATOR DURING RIG MOVES AND ANCHOR RUNNING.ASSIST IN PERFORMING SAFETY INSPECTION ON GAUGES, INDICATORS, LIMIT SWITCHES, CABLES, ELECTRICAL SYSTEMS, ETC.INCORPORATE THE RISK ASSESSMENT PROCESS INTO ALL TASKS, WHETHER WORKING ALONE OR AS PART OF A TEAM. March 2008 - August 2010JTS 356 NTA road port Harcourt Client:TOTAL NIGERIA Position : Safety supervisor Project Name: Installation of ROV on Seim Vessel, Africa Vision Vessel for TOTAL NIGERIA I lead a team of 24 persons; the job was done in one month mist times night and day. And it was delivered very well. Major (Key Responsibilities).JOB DESCRIPTIONCARRY OUT CARGO HANDLING DUTIES.CHECK LOADS FOR CLEARANCE, OBSTRUCTIONS, BALANCE ANDOTHER ATTACHMENTS.GIVE HAND SIGNALS TO CRANE OPERATOR TO CONTROL LIFT AND MOVEMENT OF LOADS.KEEP HAND TOOLS PROPERLY MAINTAINED AND STORED.PERFORM DUTIES AS DIRECTED BY THE HLO.GENERAL CLEANING AND MAINTENANCE OF THE RIG.CARRY OUT CORROSION CONTROL DUTIES.CARRY OUT ANY OTHER FUNCTION AS DIRECTED
-
-
-
A Hentex Engineering
-
BESIDE FIRST BANK OGINIGBA PORTHARCOURT NIGERIA
-
Project Manager
-
Feb 2006 - Jul 2008
-
BESIDE FIRST BANK OGINIGBA PORTHARCOURT NIGERIA
Responsibilities: Inspect equipment to ascertain their conditions and verify their calibration certificates Ensuring that the operation planned work scope is managed effectively Providing support services for unplanned structural and piping work Ensured that welding consumables, parameters, etc are in accordance with the WPS Check that the joints have been correctly prepared and tacked, or jigged Ensured that the weldable pieces were mounted in the right welding positions for the test Check the welders names and identification details are correct Explained the nature of the test and check that the welder understood the WPS Checked to see that the welders completed the root run, hot pass,filling and capping as per WPS Ensured that stop/start locations are clearly marked Supervised the entire test and submitted results Conducted Welders Qualification Test (WQT) Ensure that metal fit-up and welding parameters are in accordance with the WPS Equipment Inspections Observe each stage of the welding process Identify and report any non-conformance with Project requirements Recommend for radiography test Observe all pipe fittings, which include: flanges, valves, elbows, reducers, etc. Observe pressure testing and purging of the gas pipeline. Equipment inspection to ascertain condition and verify calibration certificates Ensuring that welding consumables, parameters, etc are in accordance with the WPS Check that the joint has been correctly prepared and tacked, or jigged Check the welder’s name and identification details are correct Explains the nature of the test and check that the welder understands the WPS Check that the welder completes the root run, hot pass, filling and capping as per the WPS Ensuring that stop/start locations are clearly marked Supervise the required test and submit results to the Q/C department
-
-
Education
-
2012 - 2012MEMBER NIGERIA SOCIETY OF ENGINEER
NSE, ENGINEERING -
2012 - 2013Olabisi Onabanjo University Of Ogun state Nigeria
Post Graduate Diploma, Mechanical Engineer -
2013 - 2013THE COUNCIL FOR THE REGULATION OF ENGINEERING IN NIGERIA ( COREN ) member
ENGINEER, Electrical and Electronics Engineering -
2008 - 2008NIGERIA INSTITUTE OF SAFETY PROFESSIONALS LEVEL 1 and 3
Safety supervisor, HSE supervision -
2006 - 2010Fidei polytechnic Benue state Nigeria
Higher National Diploma .HND, Electrical and Electronics Engineering -
Fidei polytechnic Benue state Nigeria
Higher National Diploma .HND, Electrical and Electronics Engineering
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Oil and Gas”
Need a custom project? We'll create a solution designed specifically for your project.
References
Community