Bio
Credentials
-
IWCF Supervisor level4
STCFeb, 2023- Apr, 2026 -
Wellsharp supervisor
GTSC UAE - Gulf technical & safety training centerJan, 2023- Apr, 2026 -
IADC Stuck pipe prevention
ALKHALEEJ TRAINING & EDUCATION
Experience
-
-
Drilling and workover Supervisor
-
Jan 2020 - Present
-
-
-
-
CO FOUNDER AND DRILLING Manager
-
Aug 2017 - Jan 2020
-
Egypt
-
-
-
Petrochem Performance Chemicals
-
Iraq-Kurdistan
-
Drilling and completion Fluids consultant
-
Dec 2009 - Aug 2017
-
Iraq-Kurdistan
Worked , drilling onshore primarily for Huntoil,Talisman,KHN, but also worked for Western zagros in the north of Iraq, using both WBM,HPWBM, and Completion Fluids.Trained many young fluid engineers right out of mud school in both WBM and SBM usage* Formulating drilling fluids to specific operator specifications* Maintaining drilling fluids during drilling operations* Coordinating logistics for fluid and chemical inventory* Coordinating logistics for fluids personnel* Monitor and service solids control equipment * Coordinate logistics for shaker screens and other solids control equipment* Mixing &Testing and reporting of fluid properties to operator* Advise operator on streamlining costs and enhancing performance of drilling fluids* Implemented Mud Management, Drilling Fluids Standards for HUNTOL ,KURDISTAN in all aspects,Mud Selection and Service Quality Management, Risk Management, Management of Change. Co-authored and implemented Drilling Fluid, Completion Fluids and Lost Circulation Best Practices. Resolved issues in drilling highly reactive clays, ultra-depleted zones and hole cleaning enhancement .
-
-
-
Halliburton
-
Sultanate of Oman
-
Senior Fluids Field Engineer
-
Jan 2006 - Dec 2009
-
Sultanate of Oman
Drilled Oil& Gas exploration wells (Hard Rock Drilling),for BP Oman. Developments wells for Occidental of Oman, on-shore rigs in SAFAH and WADI EL- HAYTHAM, KHAMILA fields. Used OBM, KCL / BXR-L / AK70 System, BARADRIL-N mud system . Drilling fluids management on rig-site. Mixing and treatments of fluids, delivering relevant information to the well bore construction project. Dewatering system and zero discharge waste cutting.
-
-
-
M-I SWACO
-
Saudi Arabia
-
Drilling fluids supervisor
-
Jan 2005 - Jan 2006
-
Saudi Arabia
Worked with MI-SAUDI team to establish and develope mud services in ARAMCO.Sinopec,Shell,drilling exploratorywells high Temperature ,High pressure wells,wild cat wells.
-
-
-
Baker Hughes
-
Bahrain-PAKISTAN- Saudi Arabia
-
Technical Sales Engineer
-
Jan 2004 - Mar 2005
-
Bahrain-PAKISTAN- Saudi Arabia
Senior Lead Engineer worked in BAHRAIN ,PAKISTAN, SAUDI ARABIA ( 2004- 2005 ).Started Baker Hughes drilling fluids business in the ME region with Mr. David Anderson,Ray Grant team. ,worked with BAPCO in BAHRAIN,ARAMCO.in SAUDI ARABIA.Also, worked with Pakistan team in MULTAN .Introduce Baker Hughes Drilling fluids technologies and NPR in Saudi and Bahrain Market such as PERFORMAX, MAX-BRIDGE, X-LINK, SOLUSQUEEZE, Specialty products such as PENETREX, TEQ-LUBE II, MICRO-WASH, MICRO-CURE
-
-
-
EMEC
-
Egypt-Syria-Saudi
-
Mud engineer
-
Jan 2000 - Mar 2003
-
Egypt-Syria-Saudi
Drilling Fluids Engineer
-
-
-
Bapetco
-
Western Desert Egypt
-
Well site drilling engineer
-
Mar 1996 - Apr 1999
-
Western Desert Egypt
I had been working with BAPETCO "SHELL- EGYPT J/V "• Supervised and implemented all operation techniques utilized on the rig.• Follow-up on the progress of the drilling operations.• Designed casing and cementing procedures.• Ran all different types of completion strings combined with TCP guns.• Coordinated Cement Squeeze jobs and Fishing jobs.• Troubleshooting unscheduled drilling events and coordinating appropriate action plans.• Supervise BOP test, diverter and accumulator test.• Solve unstable hole problem due to (caving, swelling, sloughing shale).• Cure lost circulation problem (losses).• Design the optimum bit hydraulics program (HHP or IF) for best ROP and hole cleaning.• Prepare and check all casing gear list, spool, hangers and make running list.• Make calculation for cement and spacer (first stage, second stage) cement, liner cementation and Balanced cement plugs.• Follow up and check the well control equipment Koomy (Accumulator) with control panel, Swaco Supper chock.• Check rig instrumentation (Torque, P. Pressure gauges, Weight indicator M/D).• Make bit selection according to litho logy and offset well.
-
-
Education
-
1989 - 1993Cairo University
Bachelor's degree, Petroleum engineering -
France Business School
Deploma of Business Administration (DBA), Business/Managerial Economics
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Oil and Gas”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community