Bio
Credentials
-
Verified International Academic Qualifications
World Education ServicesMay, 2023- Apr, 2026
Experience
-
BESSAC
-
Burnaby, Colombie-Britannique, Canada
-
MTBM Operator
-
Jun 2023 - Present
-
Burnaby, Colombie-Britannique, Canada
-
-
-
Bothar Inc.
-
Calgary, Alberta, Canada
-
MTBM Operator at Bothar Inc.
-
Oct 2022 - Apr 2024
-
Calgary, Alberta, Canada
-
-
-
Global Tunnelling Experts (GTE)
-
Danemark
-
TBM Operator
-
Feb 2021 - Oct 2022
-
Danemark
Operation of EPB TBM on Los Angeles Purple Line Metro projectCommissioning and Start up EPB TBM on Toronto, Eglinton Crosstown West Extension Project (CANADA) and Cleveland Shoreline Storage Tunnel Project (USA)
-
-
-
The Robbins Company
-
Solon, Ohio, États-Unis
-
TBM Operator
-
Aug 2013 - Oct 2021
-
Solon, Ohio, États-Unis
Commissioning, Operating and training new Operator on different types of TBM (Hard Rock, Main Beam, Slurry, EPB) on worldwide projects (MEXICO, CHILE, JAPAN, USA, NORWAY)
-
-
-
-
tbm operator
-
Nov 2007 - Jul 2013
- Sep 2012- aug 2013, SHAPIR PIZZAROTTI Railway, ISRAEL (double shield TBM HERRENKNECHT S612 / S614, 9m90)- -Jan 2012- aug 2012 , METRO B1, ROMA METROPOLITANA, ROMA, ITALY (EPB TBM HERRENKNECHT S514, - 9m75)- -feb 2011 – déc. 2011, PANDO y MONTE LIRIO hydroelectric project, CHIRIQUI, PANAMA (2 EPB TBM LOVAT - 4m et 4m20)- -feb 2010 - dec 2010 , METRO B1, ROMA METROPOLITANA, ROMA, ITALY (EPB TBM HERRENKNECHT S387 /S 388, - 6m76)- -mar 2009 - dec 2009, SANT JUST TUNNEL (Tunel y Conduccion Fontsanta - Trinitat) SANT JUST DESVERN, SPAIN (Double shield TBM 5m98)- -jan 2009 - feb 2009, MAVI TUNNEL, TURKEY, commissioning TBM, and excavation of the first 400m (double shield TBM SELI 4m88)- -oct 2008 - dec 2008, BRENNERO BASIS TUNNEL, ITALY (double shield TBM WIRTH 6m30)- -nov. 2007 - sept. 2008, EAST SIDE ACCES PROJECT, NEW-YORK, USA (double shield TBM SELI 6m70)
-
-
-
EIFFAGE
-
Le Perthus, France/Espagne
-
TBM Operator
-
Aug 2005 - Oct 2007
-
Le Perthus, France/Espagne
-
-
-
Losinger Marazzi
-
Lotchberg Basis Tunnel, Wallis, Switzerland
-
Technical Centralized Management Operator
-
Apr 2002 - Jul 2005
-
Lotchberg Basis Tunnel, Wallis, Switzerland
Operating belt conveyors and fans. Management of the material excavated from 5 fronts, management of the air flow inside the tunnel in order to relieve the smokes after blasting.
-
-
Education
-
1997 - 1999lycée Louis Bascan, Rambouillet, France
Brevet de Technicien Supperieur, Mécanique et Automatismes Industriel
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Construction”
Need a custom project? We'll create a solution designed specifically for your project.
References
Community