Bio
Experience
-
PT Sisindokom Lintasbuana
-
Jakarta, Indonesia
-
Pre Sales
-
Jan 2024 - Present
-
Jakarta, Indonesia
1. Support BoQ Technical and budgeting for IBM, Cisco, HPE, Huawei Server, Telin.2. Support Technical Review for Tender IBM.
-
-
-
Huawei
-
Jakarta, Indonesia
-
Wireless Engineer
-
Nov 2022 - Nov 2023
-
Jakarta, Indonesia
1. Crosscheck reoffer for ATP and troubleshoot Alarm for RFC(Request For Commercial) Target IOH Project.2. Troubleshoot Alarm MOCN non MOCN coordination with RF Team,RFC HN non-HN MSH for IOH Project.3. Prepare and Create Script for XL Project. License for TSEL, IOH, XLProject.4. Prepare pre and after, support for Rehoming Activity for TSELProject, troubleshoot alarm in case any alarm in process ofRehoming.5. Support for WSD (Wireless Site Design) for IOH Project.
-
-
-
-
Indonesia
-
Telecommunications
-
200 - 300 Employee
-
Assistant Manager for AP-Link Project
-
Jun 2021 - Dec 2021
Lead Materials for AP Link equipment at 50 points of the Sites for Microwave Equipment replacement, as well as leading the end to end AP Link Project starting with the price of additional equipment (BoQ for Material Budget Calculation), doing the deep coordination with IP RAN team to configuration, Crosscheck Installation Document (ATP) while in the same time determine the material route to be placed at Site, material delivery to the Site Point, coordination with installation team and infra team for permit, and weekly report to Project Manager for the progress updation.
-
-
RAN Specialist
-
Oct 2019 - Dec 2021
-Design and Maintenance Database Routepath, Planning New Site, Reroute, Dismantle document, Config on all Indonesia area Net1 Operator using Atoll, Pathloss 4.0 and Google Earth using Ceragon and SIAE Radio, Create BOQ for needed Material Site.-Upgrade Radio Capacity, Monitoring Material dismantle reuseable on site or Warehouse to reroute other site with detailing configuration and update data all material on Site or Warehouse.
-
-
Assistant Manager for Relocation Project
-
Oct 2020 - Apr 2021
Relocation Project :-Arrange Material, Planning New Transmission Microwave or Lease Line coordination with backbone planning team, deep coordination to Update RFS Site Weekly with Infra Team, deep coordination with PMO team.-BoQ for Material Budget Calculation, Crosscheck Installation Document (ATP), Crosscheck Material Dismantle to re-route to New Site.-Weekly Report to Project Manager for the progress updation.
-
PT. Alita Praya Mitra
-
Jakarta Selatan
-
Transmission Network Planning
-
Jul 2017 - Sep 2019
-
Jakarta Selatan
Design and Maintenance Database Routepath, ERM (Engineering Review Meeting), SSR (Site Survey Report) / ESR (Engineering Survey Report) on North and West Area for XL Operator using SAP Application, Pathloss 4.0, Atoll, NetConfig Tools (NCT), Google Earth. Create BOQ for needed an New Site materials and SWAP MDZ, Congestion, PDT Upgrade Site Capacity on North and West Area and for New site. Upgrade Radio Capacity, Upgrade LAN and Proposed for Fiber.
-
PT. Turangga Jala Prakasa
-
Cilacap, Central Java, Indonesia
-
Planning Schedulling Staff
-
Apr 2015 - Sep 2016
-
Cilacap, Central Java, Indonesia
Monitoring job plan and making report to Pertamina as support Planning & Scheduling Division using MySap Application to check an job.
-
PT Smartfren Telecom
-
Bumi Serpong Damai - Tangerang
-
Field Operations Engineer
-
Jun 2013 - Dec 2014
-
Bumi Serpong Damai - Tangerang
Managed activity Manage Service area Serang and Tangerang for Preventive and Corrective Maintenance CME. Responsible to Preventive and Corrective Maintenance all network equipment (BSS and Transmission ZTE, NEC, Ceragon) area Serang and Tangerang. Acceptance Test and Maintenance system alarm sites BTS and integration to BTS and HUT. Managed Tower Instalation team to installation Antenna for ATP.
-
-
Telecommunications
-
100 - 200 Employee
-
Managed Service
-
Jul 2012 - Jun 2013
Full Troubleshoot and full Maintenance Huawei tools for HCPT Operator, Troubleshoot RTWP, VSWR, 2G and 3G. Monitor with M2000, U2000 (Huawei). Operation and Maintenance BSC / RNC 6900 Huawei.
-
-
Technical Operation Centre Engineer
-
Feb 2012 - Jul 2012
Monitor with M2000, U2000 (Huawei), Analyze problem and help team Field Operation for Troubleshoot BTS 2G 3012 and 3900, 3G 3812 and 3900, RTN 620, 605, 910, 950 and 980.
-
Education
-
2015 - 2017SEKOLAH TINGGI TEKNOLOGI TELEMATIKA TELKOM PURWOKERTO
S1 Telekomunikasi, Telecommunications Engineering -
2008 - 2012AKADEMI TEKNIK TELEKOMUNIKASI SANDHY PUTRA PURWOKERTO
D3 Telekomunikasi, Telecommunications Engineering
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “IT Services and IT Consulting”
Looking to Create a Custom Project?Get StartedNeed a custom project? We'll create a solution designed specifically for your project.
References
Community
You need to have a working account to view this content. Click here to join now -