See How Many Clients You're Missing Each Month

Simply enter your business email & Topline AI Agent will show you.

Bio

Generated by
Topline AI

Credentials

  • ISO 9001 Lead Auditor - Quality Certification
    IRCA | International Register of Certificated Auditors
    Mar, 2014
    - Apr, 2026

Experience

  • Nestoil Limited
    • Portharcourt, Nigeria
    • Project Engineer
      • Jun 2021 - Present
      • Portharcourt, Nigeria

      The project undertaken :(OB3 Gas Pipeline Project Lot A):Construction of Custody Transfer Metering Station (CTMS) for Nigerian National Petroleum Corporation (NNPC) at Omoku, Rivers State, Nigeria. Scope includes foundation construction of Instrument Gas Scrubber, Slug Catcher, Pig Launcher, Gas dryer, Pre Filter, Instrument Gas Receiver, Gas Filter Separator, Drain Tank, Fuel Gas Pre Heater, Elevated water tank, Vent Scrubber, Valve Pit, etc.Responsibilities:>Prepare, schedule, coordinate and monitor the assigned engineering projects>Monitor compliance to applicable codes, practices, QA/QC policies, performance standards and specifications>Interacts daily with clients to interpret their needs and requirements>Perform quality control tasks on budgets, schedules, plans, and personnel performance and reporting on the project's status.>Assign responsibilities and mentor project team>Reviewing engineering tasks and initiating necessary corrective actions.>Communicates with the project manager and other project participants to create a more efficient project methods>Prepares material take off (mto) in line with clients specifications>Reviews all construction drawings for technical compliance and avoidance of scope creep>Monitoring and control of project constraints.

    • Project Engineer
      • Feb 2018 - May 2021

      The project undertaken:Construction of QIT MASTER PLAN PROJECTS for Dormitories and Utilities Projects(Three units of three (3) storey buildings with a total of 166 Rooms, Facility Management building, MV Switch, Load Centers (6nos), Water works building, Chiller buildings, Sewage Treatment and Reinforced Ring road pavement)Responsibilities:>Identifies project risks and mitigation strategies>Works closely with EPC contractors to deliver safe and quality project facilities.>Communicates timely project status to all stakeholders.>Participates in weekly project status meetings with all stakeholders.>Monitor compliance to applicable codes, practices, QA/QC policies, performance standards and specifications in accordance to MPN Global practice (GP)>Maintains standards of safety in compliance to company’s Health, Safety and Environment Management System>Review of contractors Method Statements and Inspection and Test Plan (ITP) for all activities>Review of contractors shop drawings.>Daily technical report for all activities>Reports directly to the project manager

    • Project Engineer/Manager
      • Jul 2015 - Dec 2017

      The project undertaken: Construction of ASABA MALL (Shoprite) for Resilient Africa, South Africa. Responsibilities:>Prepare, schedule, coordinate and monitor the assigned engineering projects>Monitor compliance to applicable codes, practices, QA/QC policies, performance standards and specifications>Interact daily with clients to interpret their needs and requirements>Perform quality control tasks on budgets, schedules, plans, and personnel performance and reporting on the project's status.>Assign responsibilities and mentor project team>Reviewing engineering tasks and initiating necessary corrective actions.>Develop specifications for equipments needed in the project>Establish field test methods and control methods for monitoring test quality>Communicate scope and design changes to project team>Develop and execute reporting and process design>Strong leadership qualities in effective planning, efficient task coordination, inspiring team members and key decision making.>Solid organizational skills in keeping to details and multitasking skills>Coordination of both internal and external resources needed for a successful project>Reports directly to the Managing director

    • QA/QC Engineer
      • Feb 2012 - Jul 2015

      The project involved in:Construction of Federal Ocean Terminal (FOT) Jetty 9, 10, 11 for Nigeria Ports Authority (NPA) with activities such as dredging/ sand filling, Piling works (Vibro/CFA) from Quay 1-11 each quay having an average of 815 pile points, Construction of Guide Walls, Diaphragm walls and general civil works in Jetty construction.Responsibilities:>Inspection of rebar and formwork before concrete pouring.>Daily technical report for all activities>Raising of RFI (Request For Inspection)>Prepare and review of ITP (Inspection And Test Plan)>Documentation of Quality control data>QA/QC weekly production audit>Inspection of materials to be used>Inspects and records pile refusal points >Monitors the production of concrete and the delivery of concrete materials..>Quality audit on subcontractors/ suppliers.>Raises field inspection report on any deviation or suspected non conformity.

    • Project Engineer/Planner
      • Jan 2011 - Jan 2012

      The project undertaken is:Construction of SABMiller Brewery, GCM, Onitsha in Anambra State for SABMiller, South Africa. Responsibilities:>Prepare, schedule, coordinate and monitor the assigned engineering projects>Monitor compliance to applicable codes, practices, QA/QC policies, performance standards and specification>Perform overall quality control of the work and report regularly on project status.>Activities for the project includes project scheduling using Primavera Software & Ms Projects for assigning durations and man-hours, recording project progress and % completion, Tracking project execution, managing constraints, Allocating resources etc.>Other assignments include transforming project activities into Logical step by step schedule, including material and resource allocation and project controls for activities and providing technical reviews and proposals for best methods for the project delivery.>Developed work program for laterite filling and compaction of an area of 30,240 meter square (336 m x 90 m)>Supervised the construction of 850m asphalted link road within the premises.>Supervised block work fencing of the entire location.>Setting out and excavation of 97 foundation bases, blinding, rebar placing and concreting.>Supervised the construction of residential quarters/club house, packaging and processing warehouse and generator house.>Liaises with clients on general issues and reports directly to the Managing director.

    • CIVIL ENGINNER
      • Nov 2006 - Jul 2010

      The projects undertaken are:• Construction of Etelebou Well 8 Drilling Location for SPDC in Bayelsa State..Nov 2006 to Aug 2007• Construction of Obiafu South West Deep 35 Drilling Location and 1.5km access road with double cell culverts for NAOC in Rivers State. Sep 2007 to Dec 2008• Dredging of sharp sand and haulage for the filling of NDPR Gas plant construction and building of security post at Obumeze, Ahoada, Rivers State.Jan 2009 to May 2009.• Construction of Drilling Location and 750 m Access road for NDPR at Obumeze, Ahoada east, Rivers State.May 2009 to December 2009.• Design and construction of 3.732 km Ogbelle community road with six ring culverts.(NDPR)..January 2010 to July 2010.Responsibilities: • General project planning and supervision.• Setting out of structures and construction of cellar slab, generator slab, chemical slab, waste pit, mud tank slab, septic tank, soak away, drainages and location surfacing • Material requirement computation for concrete, earthwork, stone base and asphalt.• Setting out of road structures, alignment, profile leveling, sand haulage of 0.6m average fill height and, compaction, 0-50 placing and compaction, culverts construction, priming and asphalting.• Liaises with the clients on general issues.

Education

  • 1999 - 2004
    Nnamdi Azikiwe University, Awka,Anambra State
    Bachelor of Engineering (B.Eng.), Civil Engineering

Suggested Services

This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection

Industry Focus. “Oil and Gas”

Looking to Create a Custom Project?

Need a custom project? We'll create a solution designed specifically for your project.

Get Started

References

Community

You need to have a working account to view this content. Click here to join now

Similar Profiles