Bio
Experience
-
BESSAC
-
Vancouver, British Columbia, Canada
-
Foreman
-
Jan 2024 - Present
-
Vancouver, British Columbia, Canada
-
-
-
Bothar Inc.
-
Kamloops, British Columbia, Canada
-
TBM Operator
-
Feb 2023 - Nov 2023
-
Kamloops, British Columbia, Canada
-
-
-
Hochtief/Murphy Joint Venture LPT2
-
London, England, United Kingdom
-
General Foreman
-
Nov 2021 - Feb 2023
-
London, England, United Kingdom
-
-
-
Global Tunnelling Experts
-
United Kingdom
-
TBM Operator
-
Jun 2020 - Nov 2021
-
United Kingdom
-
-
-
FLO (Ferrovial Agroman Laing O'Rourke JV)
-
Battersea Northern Line Extension, Thames Tideway Central
-
TBM Foreman
-
Aug 2016 - May 2020
-
Battersea Northern Line Extension, Thames Tideway Central
-
-
-
Stones Consult/NFM
-
Singapore
-
TBM Supervisor/Trainer
-
Jan 2016 - Aug 2016
-
Singapore
Supervision of TBM personnel and training for slurry mixed sheild tbm
-
-
-
McConnell Dowell
-
Auckland, New Zealand
-
TBM Operator/Supervisor
-
Aug 2014 - Dec 2015
-
Auckland, New Zealand
Operator 15m EPB TBM
-
-
-
Murphy/Hochtief JV.(C310 Thames Crossing CrossRail)
-
Plumstead, UK
-
Pit Boss
-
Mar 2013 - Aug 2014
-
Plumstead, UK
Oversee the running of 2 HK Slurry machines, Separation Plant and surface logistics. Also supervise the crosspassage excavation and SCL works.
-
-
-
TGTUNNELLING
-
C305 Crossrail Project. London
-
T.B.M Operator
-
Nov 2012 - Mar 2013
-
C305 Crossrail Project. London
Operator of a 7m HK EPB TBM machine
-
-
-
The Robbins Company
-
Cleveland/Solon, Ohio Area
-
TBM Operator/Trainer
-
Jun 2012 - Nov 2012
-
Cleveland/Solon, Ohio Area
Assist with the build and commishing of 6m EPB at the Robbins factory for delivery to Moscow for Metrolink.Assist with the build and launch of 9m EPB machines Ecatapec,Mexico City
-
-
-
Stones Consultancy
-
Mashaad and Ahwaz, Iran
-
TBM Operator/Trainer
-
Feb 2012 - May 2012
-
Mashaad and Ahwaz, Iran
9.5m and 6.5m E.P.B NFM Machine. Provide training and supervision for the production and operations of TBM
-
-
-
-
Operator
-
Aug 2011 - Dec 2011
Operator of a Liebheer 944C Tunnel excavatorOperator Mitsui 200 roadheader
-
-
-
-
TBM OPERATOR
-
Jun 2010 - Jul 2011
Operator 12.5m Herrenknecht Single Sheild EPB TBMAssemble, Launch and Disassemble of TBMCutter change crew.
-
-
-
McConnell Dowell
-
Adelaide, Australia
-
Supervisor Drill and Blast Operations/TBM Operator
-
Jun 2009 - May 2010
-
Adelaide, Australia
Operator of a 4.2m Herrenknect,triple sheild,Slurry Machine. Supervisor/operator Tamrock Jumbo's both twin and single boomed for roof, ground support, probe drilling, drill and blast shaft sinking, caverns and launch tunnels Operated Mitsui 200 for Pump Station Excavation. Operated Excavator for the sinking of 2 x 55m Shafts and 1 x 65m Shaft. SCL works with Meycon shotcrete rig T.B.M Cutter Head Maintenance. T.B.M Assembly, Launch and Disassembly.
-
-
-
Holland - Sydney Desalination Plant
-
Sydney, Australia
-
TBM Operator/Leading Hand
-
Oct 2007 - Jun 2009
-
Sydney, Australia
Operator of 4m Hard Rock Herrenknect Double Sheild T.B.M.Operated Mitsui 200 Road Header for the Excavation of two 140m Launch Chambers.SCL works Jaycon Shotcrete rig for TBM launch chambersOperated 5t through to 80t Excavator, Bobcat and 40t Dump Truck during the Excavation of the Box Cut.T.B.M Cutter Head Maintenance.T.B.M Assembly, Launch and Disassembly.
-
-
-
Thiess/John Holland - East link Melbourne
-
Melbourne, Australia
-
Operator/Leading Hand
-
Oct 2005 - Sep 2007
-
Melbourne, Australia
RESPOSIBILITIES: Responsible for the operating of Atlas Copco Bolting Machine. Provide roof and wall support for 2 x Road Tunnels. Operating ATM 105 Road Header on the Main Drives. Probe Drilling and Cross Passage roof support with an Atlas Copco twin Boom Jumbo. Operating ATM 105 Road Header on the Main Drives. SCL works with Meyco ShotcreteRig Backfill works including laying of storm water and service pipes. Leading Hand.
-
-
-
-
Operator/Leading Hand
-
Feb 2004 - Jul 2005
RESPONSILBILITIES: Operated Mitsui 300 Operated Boltec SCL Works with Jaycon shotcrete rig Leading Hand.
-
-
-
-
Operator/Leading Hand
-
Oct 1999 - Jan 2002
RESPONSILBILITIES: Operator of 5, 12 & 20t Excavator and Bobcat. General labour. Pipe laying, concreting formwork etc. Leading Hand
-
-
-
-
CHAINMAN
-
Jul 1998 - Oct 1999
ChainmanRESPONSILBILITIES: Work with surveyor learning the operations of theodolites, laser levels, GPS & plan reading Carried out work setouts, work as executed surveys and eccentric station fixes. General labour
-
-
-
-
Traineeship/Labourer
-
Oct 1993 - May 1998
Completed Traineeship in Civil Construction which included 2 years of TAFE, 1 week every month, to cover all areas of the Civil industry. Learnt the operation of the following plant: Excavator, Bobcat, Grader, Rollers, Backhoe, and Dump Trucks. Worked with various trades pipe laying, concreting, surveying, and formwork as part of my traineeship to gain better understanding of all areas.
-
-
Education
-
2005 - 2006Caterpillar Institute Victoria
Tunnelling
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Construction”
Need a custom project? We'll create a solution designed specifically for your project.
References
Community