Robi Irpanda
Gas Pipeline Staff at PT Medco Ratch Power Riau- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
Topline Score
Bio
Experience
-
PT Medco Ratch Power Riau
-
Indonesia
-
Oil and Gas
-
1 - 100 Employee
-
Gas Pipeline Staff
-
May 2021 - Present
- Patrol and Daily Inspection for Gas Pipeline Area and Supporting Area. - Perform preventive maintenance according to the schedule. - Ensure gas pipeline operating parameters are in normal condition - Make Daily reports, Monthly Report, historical record, checklist equipment - Patrol and Daily Inspection for Gas Pipeline Area and Supporting Area. - Perform preventive maintenance according to the schedule. - Ensure gas pipeline operating parameters are in normal condition - Make Daily reports, Monthly Report, historical record, checklist equipment
-
-
-
Esco
-
Singapore
-
Biotechnology Research
-
400 - 500 Employee
-
PLC & Commissioning Engineer
-
Nov 2020 - May 2021
- Design and programing PLC Control (Allen Bradley & Siemens). - Design HMI (Human Machine Interface). - Installation instrument devices, control valve, blower, pneumatic and hydrolic. - Function test and Commissioning unit. - Reporting for design ( PD and P&ID) and support document. - Design and programing PLC Control (Allen Bradley & Siemens). - Design HMI (Human Machine Interface). - Installation instrument devices, control valve, blower, pneumatic and hydrolic. - Function test and Commissioning unit. - Reporting for design ( PD and P&ID) and support document.
-
-
-
PT. Dharma Pratama Sejati (DPS Grup)
-
Indonesia
-
Oil and Gas
-
1 - 100 Employee
-
Maintenance Supervisor
-
Nov 2018 - Nov 2020
- Repair, troubleshoot, and maintenance Gas Engine, Gas compressor, Dryer, Water heater, gas detector and etc. - Making improvement reports, historical record equipment, vibration monitoring, checklist equipment and budgeting . - Evaluate equipment problems - Repair, troubleshoot, and maintenance Gas Engine, Gas compressor, Dryer, Water heater, gas detector and etc. - Making improvement reports, historical record equipment, vibration monitoring, checklist equipment and budgeting . - Evaluate equipment problems
-
-
-
Sambu Group
-
Indonesia
-
Food and Beverage Retail
-
300 - 400 Employee
-
Instrument Section Head
-
Feb 2016 - Nov 2018
- Design and programing PLC Control (OMRON) - Design HMI (Human Machine Interface). - Installation instrument devices, control valve, blower and VSD (Variable Speed Drive) - Reporting (Weekly report and Monthly report) - Design and programing PLC Control (OMRON) - Design HMI (Human Machine Interface). - Installation instrument devices, control valve, blower and VSD (Variable Speed Drive) - Reporting (Weekly report and Monthly report)
-
-
-
Transavia Otomasi Pratama
-
Indonesia
-
Automation Machinery Manufacturing
-
1 - 100 Employee
-
PLC & Instrument Technician
-
Feb 2013 - Feb 2016
- Installation instrumentation, PLC and system control. - Create and Operate HMI (Human Machine Interface). - Installation instrumentation, PLC and system control. - Create and Operate HMI (Human Machine Interface).
-
-
Education
-
Politeknik Caltex Riau
Diploma, Mechatronics, Robotics, and Automation Engineering