Ian Sedgman
Director Board of Directors at Eion- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
James McGeachie
During my time working with Ian, I found him to be 2nd to none with honesty, integrity and trustworthiness. Ian’s pride and attention to details are an encouragement to my own dedication and goals. Ian is an extremely analytical and strategic thinker.
Craig Unthank
Ian is an extremely motivated individual who combines a thorough understanding of project delivery and construction with a high level of technical aptitude.
James McGeachie
During my time working with Ian, I found him to be 2nd to none with honesty, integrity and trustworthiness. Ian’s pride and attention to details are an encouragement to my own dedication and goals. Ian is an extremely analytical and strategic thinker.
Craig Unthank
Ian is an extremely motivated individual who combines a thorough understanding of project delivery and construction with a high level of technical aptitude.
James McGeachie
During my time working with Ian, I found him to be 2nd to none with honesty, integrity and trustworthiness. Ian’s pride and attention to details are an encouragement to my own dedication and goals. Ian is an extremely analytical and strategic thinker.
Craig Unthank
Ian is an extremely motivated individual who combines a thorough understanding of project delivery and construction with a high level of technical aptitude.
James McGeachie
During my time working with Ian, I found him to be 2nd to none with honesty, integrity and trustworthiness. Ian’s pride and attention to details are an encouragement to my own dedication and goals. Ian is an extremely analytical and strategic thinker.
Craig Unthank
Ian is an extremely motivated individual who combines a thorough understanding of project delivery and construction with a high level of technical aptitude.
Experience
-
Eion
-
Environmental Services
-
1 - 100 Employee
-
Director Board of Directors
-
Jan 2023 - Present
-
-
-
Krynicki Recykling S.A.
-
Renewable Energy Semiconductor Manufacturing
-
1 - 100 Employee
-
Board Member
-
Sep 2022 - Present
-
-
-
Sibelco Group
-
Belgium
-
Mining
-
700 & Above Employee
-
Chief Strategy and Business Development Officer (CSBDO)
-
Jan 2022 - Present
Developing sustainable and innovative material solutions and products advancing modern life. Developing sustainable and innovative material solutions and products advancing modern life.
-
-
-
Glencore
-
Switzerland
-
Mining
-
700 & Above Employee
-
General Manager Operations Performance and Technology
-
Jan 2020 - Jan 2022
-
-
-
Aurecon
-
Australia
-
Design Services
-
700 & Above Employee
-
Director - Advisory
-
May 2019 - Aug 2019
-
-
-
Adani Solar
-
India
-
Renewable Energy Equipment Manufacturing
-
700 & Above Employee
-
Head of Project Delivery
-
Feb 2018 - Apr 2019
-
-
-
Adani Ports and SEZ
-
India
-
Transportation, Logistics, Supply Chain and Storage
-
700 & Above Employee
-
General Manager - Infrastructure
-
Oct 2015 - Feb 2018
Sustaining, Expansion and New Capital Projects, Asset Management, strategic planning, profit and loss. Sustaining, Expansion and New Capital Projects, Asset Management, strategic planning, profit and loss.
-
-
-
Adani Group
-
Utilities
-
700 & Above Employee
-
General Manager
-
Jan 2012 - Oct 2015
Adani Group projects in Queensland. Mining, Renewables, Rail, Civil, Power, Roads, Water Supplies, Rail Connection, Aviation, Accommodation. Adani Group projects in Queensland. Mining, Renewables, Rail, Civil, Power, Roads, Water Supplies, Rail Connection, Aviation, Accommodation.
-
-
-
BHP
-
Australia
-
Mining
-
700 & Above Employee
-
-
Jul 2011 - Jan 2012
Delivery management of all on-shore terminal infrastructue at Hay Point Expansion Stage 3.
-
-
-
Feb 2010 - Jan 2012
Feasibility, Approvals, Detailed engineering. Brisbane and New Delhi.
-
-
-
Yancoal Australia Ltd
-
Australia
-
Mining
-
500 - 600 Employee
-
Project Manager - Moolarben Coal Mine
-
Jan 2009 - Jan 2010
Concept, approvals, engineering, procurement, construction of Moolarben Coal CHPP and supporting infrastructure. Concept, approvals, engineering, procurement, construction of Moolarben Coal CHPP and supporting infrastructure.
-
-
-
Gladstone Ports Corporation Ltd
-
Australia
-
Wholesale Import and Export
-
200 - 300 Employee
-
-
Oct 2007 - Dec 2008
Client Manager of engineering, feasibility and detailed engineering.
-
-
-
May 2007 - Sep 2007
Completion and close-out of Marine Works.
-
-
-
Jan 2006 - May 2007
Install new outloading stream. 22 major shutdowns of terminal. 18 transfer system rebuilds and upgrade of electrical infrastructure.
-
-
-
AECOM
-
United States
-
Civil Engineering
-
700 & Above Employee
-
Senior Mechanical Engineer
-
2001 - 2005
Design Engineer Mining Infrastructure: Hard rock underground crushing. Decline and portal conveyors Mine Ventilation Mine dewatering and high head pumping Shaft Hoisting Systems, Friction winders and drum winders Flask and Flaskless loading systems Raise Bore Shaft, direct sink. Blind shaft boring. Emergency egress shafts Copper Holding Furnace Design Road Tunnel Ventilation Design Subway Ventilation Design Conveyor and Bin Design Finite element analysis Frature Mechanics and Fatigue speciality. Keynote Projects: - Telfer Underground - Grasstree Hoisting Shafts - RG Tanna Coal Terminal Upgrade - Southern Peru Copper - New Delhi Metro Show less
-
-
-
Heggies
-
Sydney
-
Consultant
-
1999 - 2001
Environmental Engineering - Acoustic, Dust and and Vibration Studies and Impact Assessments Environmental Engineering - Acoustic, Dust and and Vibration Studies and Impact Assessments
-
-
Education
-
The University of Queensland
Master of Business Administration (M.B.A.), Finance, General -
University of Sydney
Bachelor of Engineering - BE, Mechanical