Goh Chye Lim
System Consultant at NCS Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
NCS Group
-
Singapore
-
IT Services and IT Consulting
-
700 & Above Employee
-
System Consultant
-
Sep 2020 - Present
-
-
-
-
Senior Engineer
-
Aug 2019 - Aug 2020
Responsible for electrical and electronic of 1)E-Push (Power bed mover robot to assist nurse and porter) 2)Anabelle (Semi-autonomous robot for light load) 3)I-cube (Multi-functional Autonomous base module) 4)Matar 4 (Multi-purpose All-Terrain Indoor and Outdoor autonomous robot) Responsible for electrical and electronic of 1)E-Push (Power bed mover robot to assist nurse and porter) 2)Anabelle (Semi-autonomous robot for light load) 3)I-cube (Multi-functional Autonomous base module) 4)Matar 4 (Multi-purpose All-Terrain Indoor and Outdoor autonomous robot)
-
-
-
STATS ChipPAC Ltd.
-
China
-
Semiconductors
-
1 - 100 Employee
-
Senior Equipment Engineer
-
Sep 2016 - Apr 2019
Responsible for start up, maintenance, minimize down time, lead by technical knowhow on repair and trouble-shooting assembly process and wafer process related system such as mold, tapping, de-tapping and edge round, setup and conversion to support production Ensure 100% completion of challenging task or technical project by providing technical direction to AE and PAE. Responsible for start up, maintenance, minimize down time, lead by technical knowhow on repair and trouble-shooting assembly process and wafer process related system such as mold, tapping, de-tapping and edge round, setup and conversion to support production Ensure 100% completion of challenging task or technical project by providing technical direction to AE and PAE.
-
-
-
Seagate Technology
-
United States
-
Computer Hardware Manufacturing
-
700 & Above Employee
-
Staff Engineer
-
May 1996 - Jun 2016
Improve upkeep and maintenance of machine. Responding to breakdowns, diagnosing faults and repairing equipment. Lead a team of junior engineer in accomplishment disk drive process design and implement cutting edge technology project to extend machine life time ▪ Lead Junior engineer in equipment install, setup in record time for Woodlands 3 new plant and later maintenance the machine Responsible for process, buy-off, setting up and installation for Intevac Magnetic Disk Sputtering System MDP250B ▪ Was Six Sigma sputter machine champion in improving machine uph from 480 to 640unit per hour. ▪ Improve machine unit per hour from 450 to 480 unit per hour. Responsible to work with maintenance to reduce downtime ▪ Completed transfer on machine buyoff and install in Woodlands 1 Show less
-
-