Armin Asgharpour
Information Technology And Services Professional at Motopp- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Motopp
-
Netherlands
-
IT Services and IT Consulting
-
1 - 100 Employee
-
Information Technology And Services Professional
-
Nov 2023 - Present
Amsterdam Area
-
-
-
Farafan
-
Iran
-
Information Technology & Services
-
100 - 200 Employee
-
Senior LTE Optimization Engineer
-
Jul 2018 - Jul 2022
• Suggesting new setting as trial to customer for features like CA, IRAT redirection, CSFB, VOLTE, . . . and modifying Key Parameters of 4G network like Idle mode, Intra/Inter Mobility PARs, power portion per layers/Technologies, Coverage PARs,.. • Define, monitor and troubleshoot process of Initial tuning for new sites and updating Baseline. • prepare 4G Worst/Poor Performing cells/Sites report and follow up weekly with team • Tuning inter layer loads(L18/L26/L21) to have most… Show more • Suggesting new setting as trial to customer for features like CA, IRAT redirection, CSFB, VOLTE, . . . and modifying Key Parameters of 4G network like Idle mode, Intra/Inter Mobility PARs, power portion per layers/Technologies, Coverage PARs,.. • Define, monitor and troubleshoot process of Initial tuning for new sites and updating Baseline. • prepare 4G Worst/Poor Performing cells/Sites report and follow up weekly with team • Tuning inter layer loads(L18/L26/L21) to have most efficiency performance per Cluster. . • check Drive Test Reports by TEMS/Actix to detect MIMO support, CA functionality, MCS Show less
-
-
-
Ericsson
-
Sweden
-
Telecommunications
-
700 & Above Employee
-
Radio Acceptance Team leader
-
Nov 2017 - Jul 2018
Iran • Initiate new methods to achieve more Faster planned targets by automating Target sites selection and success in this part by meeting more than 500 PAC approval in about 7 months. • Arranging and chairing weekly team meetings, focusing on targets achievements by aligning team members based on their personal tasks and team targets. Initiating technical brainstorming sessions in the team to solve long pending cases. • prepares different reports as an archive for the company like best… Show more • Initiate new methods to achieve more Faster planned targets by automating Target sites selection and success in this part by meeting more than 500 PAC approval in about 7 months. • Arranging and chairing weekly team meetings, focusing on targets achievements by aligning team members based on their personal tasks and team targets. Initiating technical brainstorming sessions in the team to solve long pending cases. • prepares different reports as an archive for the company like best practice actions, and results of modifying some processes which caused achievements By PowerPoint/power BI. Also, customers requested report
-
-
Radio Network design & Optimization
-
Nov 2013 - Nov 2017
Iran • Project team member for Modernizing RBS 2000 to RBS 6000 to lunch 3G/LTE for more than 2000 sites. • 24/7 on-site team support for issues during swap/Modernization of roll-out project (monitoring, analyzing, finding, and rectifying HW or Parametric issues after the cut-over process). • Re-framing of 2G 900 band for bandwidth increment of U900 layer (GSM from 5MHz to 2MHz). • U900 launching in MTNI network for the first time. Initial tuning/new setting implementation to achieve… Show more • Project team member for Modernizing RBS 2000 to RBS 6000 to lunch 3G/LTE for more than 2000 sites. • 24/7 on-site team support for issues during swap/Modernization of roll-out project (monitoring, analyzing, finding, and rectifying HW or Parametric issues after the cut-over process). • Re-framing of 2G 900 band for bandwidth increment of U900 layer (GSM from 5MHz to 2MHz). • U900 launching in MTNI network for the first time. Initial tuning/new setting implementation to achieve customer demands from new Layer such as defining higher priority, and balancing load between layers by features like IFLH, and admission/congestion threshold tuning. • Initial tuning and optimization for Ericsson New Equipment such as Baseband, Zero sites, and CRAN sites based on Network strategy. • planning new site to achieve agreed QOS based on capacity/coverage study or Customer complaints and preparing LLD report(HW requirement, needed coverage, Antenna height, number of Sectors, Technologies, and number of layers per Technologies.) • responsible for checking/modifying all processes of new site installation and handover to customer like SAR, TSSR, DDR , PAT, FAT. • responsible for Atoll as a database, based on the actual network status.
-
-
-
Shaygan Telecom Solutions (STS)
-
Iran
-
Telecommunications
-
1 - 100 Employee
-
RND&O Engineer
-
Feb 2012 - Nov 2013
Gilan,Iran • BSC Optimizer for MCCI Network. ownership of +200 site optimization. • 2G Global Audit of Features like SCLD, Dynamic SD, OL/UL channel assignments tuning, . . . • mentoring fresh field test resources. • IBSWalk test planning and coordinating • post-analyzing field test data by TEMS investigation.
-
-
Education
-
Azad University (IAU)
Bachelor's degree, Electrical and Electronics Engineering