Zulqarnain Shaikh

Regional Operations Manager at CBRE Corporate Outsourcing
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Karāchi, Sindh, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Poland
    • Leasing Real Estate
    • 300 - 400 Employee
    • Regional Operations Manager
      • May 2019 - Present

      • Responsible for managing maintenance activities as well as C&M and AI Project activities (civil, electrical, and mechanical) at Shell Retail Fueling Station. • Managing vendors including development of new and existing vendors, training of vendors on Shell GIDS and Engineering Design Standards • Managing the Permit to Work (PTW) system, ensuring training is given when required and suppliers are suitably qualified • Assuring HSE and LSR Compliance on Shell Retail Sites • Delivery Key KPIs as per set targets by management which includes NMPIs, TNTs, Audits, CPCs, HSE Compliance, Cost Savings & Validations. • Implementation of Shell Standards and Local by-laws requirement of Explosives at Shell Retail sites. • Coordination with key stakeholders for maintenance activities on the fueling stations. • Visiting the client's fueling station facilities for the maintenance and C&M Project works deliverables, ensuring site compliance with HSE Standard. • Reporting NMPIs and following up for safe and timely completion. • Managing Preventive and Corrective maintenance of the Critical assets. • Auditing site critical asset, following up critical equipment inspections and remedials closure. • Ensuring the integrity of critical asset installed at retail sites including Dispensers, underground storage tanks, product lines, fill point lines, ATG System etc. • Coordination with EPCM for Handing over & Taking Over before and after Project Activities at retail sites. • Liaison with client's Territory Managers, District Managers and Road Transport team on regular basis for assurance and compliance. • Ensuring asset data update in FMP after project completion. • Participate in LCSC and Safety Day activities. • Auditing of vendors for cost, quality and compliance. • Maintaining fueling station branding elements and carrying out BEA, CEA & ISA Audits and compliance with respect to Shell's Standards. • Self-development through continuous learning, trainings, and skills improvement. Show less

    • Pakistan
    • Architecture and Planning
    • 300 - 400 Employee
    • Mechanical Engineer
      • Nov 2017 - Apr 2019

      Project: Green Line BRTS Project – Karachi Client: Karachi Infrastructure Development Company Ltd. (KIDCL) • • Managed contractors and subcontractors to implement and monitor site works (mechanical) as per approved designs, drawings, and standards. • Monitoring of execution of project plans related to mechanical works. • The scope of works at site includes execution, managing and quality inspection of Structural Steel works for fabrication of Station Area and Pedestrian Bridges, HVAC works including Split Units and Variable Refrigerant Flow Systems for Stations and Operation Command Centre. Piping installation for Diesel Tank to Generators. • Coordination with Civil and Electrical works for erection and installation plan of Structure works and Mechanical equipment. • Provided technical and engineering support to mechanical groups working at site. • Review and verification of Interim Payment Application and Invoices submitted by Contractor. • Review of designs and material submittals to adhere Global and International Design Codes and Standards. • Review daily progress and targets accomplishment by all mechanical groups • Prepare daily, weekly and monthly progress reports of site works (mechanical & civil). • Prepare statistical data of quality defects of steel structure. • Regular Reporting to higher management and client for the progress of works at site. • Coordination and attending meetings with client for quality of work, project time and scheduling. • Perform proper documentation and filings of site works and maintenance records. • HSE Compliance and assurance at site Show less

    • Pakistan
    • Construction
    • 1 - 100 Employee
    • Mechanical Engineer
      • Sep 2016 - Nov 2017

      PROJECT: Construction of Coal, Clinker and Cement Terminal at Port Qasim, Karachi CLIENT : Pakistan International Bulk Terminal Ltd. • Managed contractors and subcontractors to carry out site works (mechanical) as per approved designs and standards. • Monitored the execution of project plans related to mechanical, electrical and plumbing works. • The scope of mechanical works at site includes installation, quality inspection, testing, commissioning and maintenance of: o Erection of Steel Structure of terminal workshop. o Diesel Storage Tanks (Welded Type, 600m3 & 250m3 capacities as per API Standards) o Diesel Unloading System (from Oil Tanker to Storage Tanks through gear pumps) o Diesel Feeding System (from Storage Tanks to Day Tanks of Generators through gear pump) o Fuel Dispensing Units o Pumps and piping network for Water Supply System (including potable, production and firefighting system) o HVAC System (Split Units, FCUs, Exhaust Fans, and VRF system) o Sewage (or Waste) Treatment Plant equipment o Silo Equipment (including aeration system, bag filters, compressors, open fluid slides, double chambered fluid slides etc.) • Regular Reporting to higher management and client for the progress of works at site. • Reviewed designs and material submittals to adhere Global and International Design Codes and Standards. • Coordinated with client for quality of work, project time scheduling, maintenance works at site. • Performed proper documentation and filings of site works and maintenance records. • Followed up with the contractor for maintenance works after commissioning of the systems. • Managed and coordinated the successful completion and handover the project in line with all pre-requisites. • Ensured HSE requirements are being implemented and followed at site. • Followed up with the contractor for maintenance works after commissioning of the systems. Show less

    • Service Engineer
      • Aug 2015 - Mar 2016

      • Plan and execution of Preventive and Corrective maintenance works of Absorption Chillers and Cooling Towers. • Managed all breakdown complaints and / or ad-hoc requests from clients. • Managed and follow up with the technical team comprising of more than 20 technicians and technical managers to troubleshooting the chillers and cooling towers. • Carried out tender filing and feasibility report making. • Managed installation work of 500 ton LG Centrifugal Chiller. • Managed installation work of 800 ton SPACCO Cooling Towers. • Schedule making for periodic maintenance of the chillers and cooling towers. • Coordinated with clients to provide information and update on on-going maintenance and troubleshooting works to client on routine basis. • Managed and supervised annual overhauling of chillers and cooling towers. • Assisted in designing as well as supervised in installation of piping and ducting system for Chilled Water, Cooled Water, and Cooled Air distribution lines. • Assisted in preparation of Standard Operating Procedures for the services and maintenance works. • Performed proper documentation and filings of the maintenance and troubleshooting works. Show less

    • Pakistan
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • S3 Officer
      • Apr 2014 - Mar 2015

      • Carried out value analysis of automobile parts including activities like yield improvement, tooling amortization, process audits and other related techniques to cut down the cost of the concerned part (of automobile or motorbike) which could affect the net cost down of the automobile. • Managed vendors for active participation in VAVE activities. • Implemented various approved VA projects with said techniques. • Prepared daily progress report of VAVE activities. • Prepared bi-monthly and quarterly based Forex Rates and revised the cost breakups of all parts associated with imported material. • Implementation of revised cost of all parts through ERP System. • Prepared presentation and activity progress for Division Coordination Meeting held every month. • Given additional responsibility of IMS Coordinator of the department and implied IMS SOPs within the work area. • Conducted and implemented 5S within the work area. • Involved in different Kaizen activities to help and improve for better workplace environment. • Assisted in preparation of Standard Operating Procedures for the VAVE Activities. • Successfully completed process audit with net cost reduction of Rs. 5.2 million per annum (for all supplied plastic parts by the vendor) Show less

Education

  • NED University of Engineering and Technology
    Master of Engineering - MEng, Mechanical Engineering
    2017 - 2021
  • NED University of Engineering and Technology
    B.E, Mechanical Engineering
    2010 - 2013
  • Adamjee Government Science College, Karachi
    H.S.C, Pre-Engineering
    2007 - 2009
  • Chiniot Islamia Public School
    Science, Matriculation
    2005 - 2007

Community

You need to have a working account to view this content. Click here to join now