Zornjak (Talić) Ljiljana
at Croatian Hydrocarbon Agency- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Petrel Reservoir Engineerng
SchlumbergerNov, 2018- Nov, 2024 -
Applied Reservoir Engineering
-Oct, 2016- Nov, 2024 -
State Qualifying Exame
Ministry of EcononomyNov, 2015- Nov, 2024 -
AutoCad specialist (2D, 3D modeling)
-Jul, 2011- Nov, 2024
Experience
-
Croatian Hydrocarbon Agency
-
Croatia
-
Government Administration
-
1 - 100 Employee
-
-
Mar 2022 - Present
-
-
-
Mar 2019 - Mar 2022
-
-
-
INA Grupa
-
Croatia
-
Oil and Gas
-
700 & Above Employee
-
-
Dec 2016 - Mar 2019
-Team Leader;-Conduct field/well reviews, evaluations and proposing improvements/actions to maximize hydrocarbon production; -Optimization of hydrocarbon production i.e. optimal depletion of the reservoirs regarding the energy drives;-Designing and surveillance of performance of the workover projects, including post workover wells monitoring and preparing final reports;-Re/evaluation of OOIP and associated gas; calculating production profiles and preparing final reports; -Produced reserves estimations and production forecasts using Decline curve analysis;- Well test analysis and designing (using Kappa and Interpret software);- Engineering data processing and analysis;-Well modelling using PETEX software;-Analysis of well surveillance data (from static gradient, well analyzer);-Auditing – preparing TSC proposal (revision of field technical volumes);- Member of the commission for an expert rating of the ‘Artificial Lift Optimization Study’ and ‘Study of CO2 compression on fractionation facilities in Croatia‘ Show less
-
-
-
Sep 2011 - Dec 2016
- Deputy of Team leader;-Covered reservoir engineering which was part of three Geological studies, which included determination of hydrodynamic connections between wells/different parts of the field; systemization of the pressure and production data;-Field screening (reviewed and analyzed wells) detected wells suitable for project hydraulic fracturing phase I; - Designing well workover projects, included surveillance on their performance and prepared final reports;-Produced reserves estimations and production forecasts;-Performed well test analysis using Kappa Saphir;-Designed workover projects for relining of CO2 injector wells (CO2 EOR). Show less
-
-
Education
-
Faculty of Mining, Geology and Petroleum Engineering
Mag.Petr.Eng, Petroleum Engineering -
XI Gymnasium