Zoila Guevara
Director de fabricación at Erika de Reynosa- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Spanish Native or bilingual proficiency
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
Erika de Reynosa
-
Mexico
-
Medical Equipment Manufacturing
-
1 - 100 Employee
-
Director de fabricación
-
Jul 2023 - Present
-
-
-
CR Bard
-
United States
-
Medical Equipment Manufacturing
-
700 & Above Employee
-
Production Manager
-
Jul 2011 - Jul 2023
* Monitor production administration metrics.* Personnel administration and annual assessment.* Coordinate resources to maintain 15 production lines to meet more than 1 million units per month.* Develop and implement systems to improve processes and operations to increase productivity.* Provide training for supervisors to improve production administration.* Calculate labor requirements.*Manage daily manufacturing operations such as, production rates, standards, quality inspections, efficiency, yields, headcount, lot acceptance, attainment, past due, on time deliveries. Show less
-
-
Sr Industrial Engineer
-
Aug 2006 - Jul 2011
* Supervise and coordinate a group of industrial engineers.* Quote new products.* Generate an efficiency growth.* Provide lean manufacturing training to engineers.* Lead and coordinate lean manufacturing projects to eliminate muda.* Plant layout for new process introductions and product transfers.
-
-
Industrial Engineer
-
Aug 2003 - Aug 2006
Career highlights:*Lean project to eliminate 29 unnecessary subassemblies, WIP decreased 181k usd, Inventory decreased from 22k units to 9k units per month.*Cost reduction project to eliminate a washing operation with savings of 13.5k usd annually.*Lead and coordinate resources to implement fourteen relayouts to release 6200 square feet of productive space for transfers and new product introduction.*Cost reduction project to reduce sample size from 80 units to 27 units per lot.*Experience with 23 product transfers and production start up.*Develop a printing process giving as a result a headcount reduction from 3 operators to 1 operator and labor savings of 14.7k usd annually.*Lean manufacturing project to reduce the mixed-missing documents, Manually reports were changed to electronic reports, a new reporting system for production was created. Show less
-
-
Education
-
The University of Texas Rio Grande Valley
MS Engineering Managament -
Instituto Tecnologico de Reynosa
Bachelor's degree, Industrial Engineering