Zhi Huei Soh

Senior Engineer at KTP Consultants Pte Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Singapore, SG
Languages
  • English Full professional proficiency
  • Chinese Native or bilingual proficiency
  • Malay Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Construction
    • 100 - 200 Employee
    • Senior Engineer
      • Sep 2016 - Present

      Work Profile • Civil design. Scope of works included, a) Detailed design of road geometry including horizontal and vertical alignment b) Detailed design of traffic including road furniture, road marking and road signage c) Detailed design of drainage d) Planning of reinstatement and tree planting e) Preparation of authority submission Projects Involved • Contract T222 - Construction of Outram Park Station and Tunnels for Thomson Line (Estimated project value: > S$300M) • Contract T306 - Construction of Amber Station for Thomson-East Coast Line (Estimated project value: > S$145M) Show less

    • Singapore
    • Civil Engineering
    • 1 - 100 Employee
    • Executive Engineer
      • Jul 2013 - Aug 2016

      Work Profile• Civil design. Scope of works included,a) Detailed design of road geometry including horizontal and vertical alignmentb) Detailed design of traffic including road furniture, road marking and road signage c) Detailed design of drainaged) Planning of reinstatement and tree plantinge) Preparation of authority submission• Preparation of documents and drawings for tender bid.Projects Involved• Contract T223 - Construction of Maxwell Station for Thomson Line (Estimated project value: > S$220M)• Contract T307 - Construction of Marine Parade Station and Tunnels for Thomson-East Coast Line (Estimated project value: > S$550M)• Construction of infrastructure including a bridge, road and utilities at the Pulau Muara Besar (PMB) island (Brunei) (Estimated project value: > S$280M) Show less

    • Design Engineer
      • Sep 2011 - Jun 2013

      Work Profile• Civil design. Scope of works included,a) Detailed design of road geometry including horizontal and vertical alignmentb) Detailed design of traffic including road furniture, road marking and road signage c) Detailed design of drainaged) Planning of reinstatement and tree plantinge) Preparation of authority submissionProjects Involved• Contract 2103 - Lead Consultancy services for the Proposed Thomson Line Package B. The proposed Thomson Line is an underground 4-car train MRT System with an approximately route length of 30km. This project consists of about 14.5km. (Estimated project value: > S$1000M)Involved in Springleaf Station and Sin Ming Station. Show less

    • Malaysia
    • Civil Engineering
    • 1 - 100 Employee
    • Civil Engineer
      • Jun 2010 - Sep 2011

      Work Profile • Highway and road design. Scope of works included, a) Geometry design b) Alignment design c) Road horizontal and vertical profile d) Road furniture, road marking and road signage design e) Preparation of tender documents, such as specifications and cost estimate Projects Involved • The Light Waterfront, Penang (Estimated project value: S$60M) • Electrified Double Track from Gemas to Johor Bahru (Estimated project value: > S$1000M) • Proposed Tanjung Agas East Coast Link (Estimated project value: S$100M) • Left in-Left Out Connection to SILK Highway (Estimated project value: S$2M) • Proposed Sungai Besi-Ulu Kelang Expressway (Estimated project value: >S$1500M) Show less

Education

  • Universiti Putra Malaysia
    Bachelor of Engineering (BE), Civil Engineering
    2006 - 2010

Community

You need to have a working account to view this content. Click here to join now