Zhetkinshek Mukhambetovic
RA Coordinator at ESP- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Русский Full professional proficiency
-
Казахский Professional working proficiency
-
Английский Limited working proficiency
-
Турецкий Elementary proficiency
Topline Score
Bio
Experience
-
ESP
-
United Kingdom
-
Staffing and Recruiting
-
1 - 100 Employee
-
RA Coordinator
-
May 2022 - Present
Company: Engineering Services Provider Group Client: Tengizchevroil (FGP/ WPMP Project 3GP/ 3GI) Monitoring pre-commissioning and commissioning process in compliance with TCO and RoK standards requirements •Coordination with client Regulatory Authorities, and response to issues raised by client and RoK Authorities. •Maintaining tools for RA tracking and reporting process under project scope, including RA registers, matrices (RVD/QVD, metrology, technical passports, orders registers). •Conduct RA and Quality surveillance checks/Weekly Internal audits according to approval from SC manager at assigned sites regarding proper management of documentations •Notify and Coordinate with TCO RA SC Coordinator, Authorship & Technical supervision to complete SC documentation . •Advise project management on appropriate strategies for complying with RoK Regulatory requirements on Tengiz project •Participate / conducting of facilities acceptance process and manage the process of obtaining declaration on compliance from Sub Contractors, Conclusions on Quality and Design Compliance from Technical and Authorship Supervision Reps Show less
-
-
-
Caravan Resources Group
-
Kazakhstan
-
Mining
-
1 - 100 Employee
-
As-Built Documentation. Engineer
-
May 2021 - May 2022
Client: ''LLP KAZ Minerals'' Construction of the Aktogay Expansion Project Sulphide Plant • Preparing redline drawings to accommodate changes/modifications during various stages of commissioning team. • Complete field inspections to identify all changes in the drawing during execution. • Mark-up all changes according to the applicable scope of work in subsystems as per RFIs. • Maintain redline master register per subsystem for the project. • Preparing new RFI for approval with corrections on the drawings as per the actual site situation. • Submit drawings to ''KAZ Minerals'' for review and approval. • Communicate with site personnel and other affected teams to ensure Database changes are understood and implemented as agreed. Implement systemized drawings changes, including issuing work scope boundary mark ups when needed. • Making weekly / monthly reports on the progress of performed work. • Preparation of drawings for sending to the document control group and uploading to the EDMS system • Interaction with the customer, contractors / subcontractors and design organizations. • Providing the weekly toolbox meeting for working teams. • Inspection of employees' compliance with safety regulations. • Providing additional information on the GOST specification. Show less
-
-
-
Bonatti
-
Italy
-
Oil and Gas
-
700 & Above Employee
-
RA Specialist
-
Feb 2019 - Dec 2020
Client: "Tengizchevroil & KPJV" Future Growth Project / Wellhead Pressure Management Project (FGP/WPMP), Pipeline area 51 Tengiz, Kazakhstan. The issue of as-built technical documentation in accordance with construction norms and regulations RK (reports,statements,Protocols,Passport) of the test piping, equipment, alarms detection pig to matches procedures and drawings. Logging General works, magazines of manufacture of works. Joint work for the Unification of the Group Commissioning (ICAT). Check for licenses, permits, passports and certificates for materials, equipment and their compliance with the standards and technical requirements of the RK. (etnicheskii passport, certificate of conformity and Metrology, laboratory test results, etc.). The surrender of objects (part of systems) sanitary and epidemiological service of HVAC system for measurements of noise, vibrations, lighting, air exchange, ventilation, radiation. The delivery of production objects and Technical Working commissions. Show less
-
-
-
Tenaz Management
-
Kazakhstan
-
Oil and Gas
-
1 - 100 Employee
-
Turnover complection specialist
-
Jan 2019 - Feb 2019
Client: "Tengizchevroil & KPJV" Future Growth Project / Wellhead Pressure Management (FGP / WPMP) Tengiz Collection and complection of the dossier of acceptance in all disciplines to POL (QVDs, ACTs) Filling the NCR register, NFI register, SR register. Closely working with the Turnover group TCO and KPJV limited. Preparation to the report on the progress of registration and delivery of the turnover dossier. Client: "Tengizchevroil & KPJV" Future Growth Project / Wellhead Pressure Management (FGP / WPMP) Tengiz Collection and complection of the dossier of acceptance in all disciplines to POL (QVDs, ACTs) Filling the NCR register, NFI register, SR register. Closely working with the Turnover group TCO and KPJV limited. Preparation to the report on the progress of registration and delivery of the turnover dossier.
-
-
-
Fircroft
-
United Kingdom
-
Staffing and Recruiting
-
400 - 500 Employee
-
Technical Documentation Engineer
-
Nov 2018 - Jan 2019
Client: "Kazakhstan Petrochemical Industries Inc." Act of hidden work, Incoming material acts, Act of intermediate acceptance of responsible construction, SNIP GOST VSN Client: "Kazakhstan Petrochemical Industries Inc." Act of hidden work, Incoming material acts, Act of intermediate acceptance of responsible construction, SNIP GOST VSN
-
-
-
Dorce Prefabricated Building and Construction Industry Trade Inc.
-
Türkiye
-
Construction
-
200 - 300 Employee
-
QA/QC CIVIL & RA Specialist
-
Mar 2018 - Oct 2018
Client: "ESS Support Services/Compass Kazakhstan LLP"• Контроль качества строительно-монтажных работ в соответствии с утвержденными процедурами и нормативными документами РК и Заказчика.• Контроль качества гражданских работ. Договорные и субподрядные компании.• Контроль качества строительных работ: для арматуры, бетонирования, контроля качества бетонных конструкций, прокладки подземных трубок в траншее, строительства дорог, засыпки, монтажа металлоконструкций, модульных зданий и металлизации металлической рамы, цементного раствора под оборудование, проверяющее соответствие толщины слоя наполнения и методы уплотнения.• Проверьте файл сборки• Контроль соответствия качества почвы.• Проведение лабораторных испытаний строительных работ.• Координация между руководителями с точки зрения реализации мер по заливке бетона и обратной засыпки.• Соблюдение технических регламентов, строительных норм и правил, технических условий и технологии производственных операций.• Обеспечить качество работы проекта через систему постоянного мониторинга.• Принятие строительных работ.• Анализ информации, полученной на разных этапах строительных работ, показателей качества, характеризующих работу.• Применение мер по предотвращению производства работ, не соответствующих требованиям.• Участие в работе Комиссии по приему строительных объектов и сдаче в эксплуатацию.• Проведение встреч с подрядчиками и субподрядчиками при решении производственных вопросов.• Проверка любой проверенной деятельности на предмет наличия утвержденного чертежа проекта и графика проверок и испытаний (ITP)• Выполнение запланированных проверок на объектах, в соответствии с запросами на инспекцию (RFI), обозначенными в соответствующем плане проверки и испытаний (ITP).• Составление и утверждение плана проверки и тестирования (ITP).Проверка технической проектной документации на соответствие нормативному законодательству. Show less
-
-
RA Specialist
-
Mar 2017 - Mar 2018
1. Департаментом НПО (нормативно правовой отдел). 2. Подготовка и выпуск актов и журналов производства работ. 3. Помощь и координирование работ отдела контроля качества. Координирование по ГОСТам и СНиП РК для всех отделов. 4. Подготовка и выпуск чертежей на строительство с отделом ПТО.5. Осуществление взаимодействия со всеми контролирующими органами технического надзора, авторского надзора6. Координирование работы ИТР, ПТО и рабочих на объекте, 7. Ведение специальной обязательной документации на объекте строительства (в т.ч. журналов, материальной отчетности, актов), 8. Контроль за ведение строительной документации 9. Контроль за устранением замечаний (предписаний) инспектирующих организаций. 10. Координирование в разработке ППР. Show less
-
-
Education
-
Атырауский государственный университет имени Халела Досмухамедова
Бакалавр, Инженер гидротехник -
Школа им Абая
Выпускники (2008)