Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Egypt
    • Construction
    • 1 - 100 Employee
    • Senior Materials Manager
      • May 2022 - Present
    • Planning Engineer
      • Oct 2017 - May 2022
    • Senior Planning Specialist
      • Oct 2015 - Sep 2017

      •Establishing the requirements of each project with regard to scope of services, organizations, job specific procedures and planning & scheduling requirements. •Responsibility of delivery follows up & preparation of progress report and invoices as well. •Regularly reviewing the planning and scheduling of work on current projects to ensure that activities are effectively planned, resourced and completed. •Maintaining awareness of major client requirements for planning and scheduling services. •Elaboration and revision of Project scheduling procedures and documents. •Sites include all coverage, control locations including central and secondary dispatch locations, back haul locations, and generation plants and associated facilities. •Prepare and/or edit meeting minutes, presentations and tables. •File all project documents (hard and soft copies) •Ensure coordination of the interfaces of all disciplines within R&D. •The detailed schedule will include all project phases and dependencies including at least preliminary engineering, property review and acquisition, detailed design, material procurement, installation, test and turn-up, and site and system acceptance. •Responsible to track project changes and produces updated site based schedule as agreed with engineering and project management Show less

    • India
    • Oil and Gas
    • Senior Procurement Specialist
      • Oct 2014 - Oct 2015

      •Receiving purchase requisitions from technical office or from stores •Coordinate on daily basis with material control and production dep. To assist them through expedite their needs of materials according to Production plan priority. •Handle purchasing and logistic needs for around 100 purchase orders per month (Direct and Indirect material, Machines and Spare parts orders ) with closely follow up to achieve and assist production and sales plans. •Through handling shipments on daily basis have an excellent knowledge with overseas and Indoor logistics processes, Egyptian customs regulations also almost of Europe and Fareast countries export regulations. •Responsible for Sourcing and Vendor Management activities, which includes detailed analysis and synthesis of internal requirements for particularly complex goods and services. •Reviewing line points/ order points for inventory stock levels •Monitoring price increases and communicating changes as necessary •Planning and Arranging the Orders on time (As per the agreed demand) •Have an excellent knowledge with financial procedures (LC and LG). •Purchased all construction materials, production machines, equipment and services, that need to start up factory. •Developing and implementing cost savings and cost avoidance initiatives. •Issuance of purchase orders both (Foreign & Local) and implementing supplier’s development principle to increase their efficiency •issuance of purchase orders, Coordination with projects managers on daily basis and Coordinating with quality control department for any rejection or specification changes. •Provide head office with weekly reports to display Local vendor evaluation, purchase orders status, cash flow. •Other duties as assigned Show less

    • 1 - 100 Employee
    • Projects Coordinator
      • Aug 2013 - Sep 2014

      •Establishing the requirements of each project with regard to scope of services, organizations, job specific procedures and planning & scheduling requirements. •Responsibility of delivery follows up & preparation of progress report and invoices as well. •Regularly reviewing the planning and scheduling of work on current projects to ensure that activities are effectively planned, resourced and completed. •Maintaining awareness of major client requirements for planning and scheduling services. •Elaboration and revision of Project scheduling procedures and documents. •Sites include all coverage, control locations including central and secondary dispatch locations, back haul locations, and generation plants and associated facilities. •Prepare and/or edit meeting minutes, presentations and tables. •File all project documents (hard and soft copies) •Ensure coordination of the interfaces of all disciplines within R&D. •The detailed schedule will include all project phases and dependencies including at least preliminary engineering, property review and acquisition, detailed design, material procurement, installation, test and turn-up, and site and system acceptance. •Responsible to track project changes and produces updated site based schedule as agreed with engineering and project management Show less

    • Material Control Responsible (Engineering Dept.)
      • Jul 2008 - Jun 2013

      •Receiving the Material Requisitions witch prepared by engineering Dept. •Calculating material quantities and check the availability in the stock. •Preparing the purchase order for the balance of materials required and not available. •Preparing the material receiving report to be added to the stock after QC acceptance. •Preparing the material discharging reports and controlling the material between the stores and the manufacturing engineering •Receiving the Material Requisitions witch prepared by engineering Dept. •Calculating material quantities and check the availability in the stock. •Preparing the purchase order for the balance of materials required and not available. •Preparing the material receiving report to be added to the stock after QC acceptance. •Preparing the material discharging reports and controlling the material between the stores and the manufacturing engineering

    • Saudi Arabia
    • Building Materials
    • 1 - 100 Employee
    • Material Control Responsible (Projects Dept.)
      • Aug 2006 - Jul 2008

      Projects that have been efficiently conducted these assignments: 1. Cairo West Power Station (Currently: 2x350 MW Utility Boiler pressure parts) 2. Jordan cement Co – Rashadyia (RHI) (2000 ton) 3. Misr Bini Suef Cement Co. (TKF) (9000 ton) 4. SAVOLA (2 water tube boilers capacity 80ton / hr.) 5. ENPI (2 water tube boilers capacity 40 ton / hr.) 6. Air Liquid (2 CO2 Pressure Vessels capacity 368 m3) Projects that have been efficiently conducted these assignments: 1. Cairo West Power Station (Currently: 2x350 MW Utility Boiler pressure parts) 2. Jordan cement Co – Rashadyia (RHI) (2000 ton) 3. Misr Bini Suef Cement Co. (TKF) (9000 ton) 4. SAVOLA (2 water tube boilers capacity 80ton / hr.) 5. ENPI (2 water tube boilers capacity 40 ton / hr.) 6. Air Liquid (2 CO2 Pressure Vessels capacity 368 m3)

    • France
    • Wholesale
    • 1 - 100 Employee
    • Material Control
      • Oct 2002 - Jul 2006

      Projects that have been efficiently conducted these assignments 1.The national company for oil and vegetables ( CARGILL ) 2.ABU GENA cement co Nigeria ( FEROMETALCO ) ( 1500 ton ) 3.QUSEM cement co ( IHI ) ( 1500 ton ) 4.Qatar cement co ( FCB ) ( 3000 ton ) 5.Urea of Abu kier ( UHDE ) ( 2000 ton ) 6.Ryad Crushers (TKF) ( 1000 ton ) 7.Steel EZZ Dekhila ( ANSDK ) ( 4500 ton ) 8.FIVE STARS Mills at Swize (500 ton Plate work ) 9.Swize Cement Co El Ramlya ( FLS ) ( 9000 ton ) 10.SWMMED (Pipe Lines & ATM Tanks Fabrication) 11.BECHTEL the LNG projects ( piping & fittings ) 12.BUHLER Borg El Arab Mills (100 Ton Plate Work & 300 Steel Structure) 13.ABB (piping & fittings) Show less

Education

  • King Mariout Higher Institutes
    Bachelor’s Degree, Information Systems Management
    1998 - 2002
  • Lycée Liberty of Alexandria, English Department
    High School, High school
    1986 - 1997

Community

You need to have a working account to view this content. Click here to join now