Zeeshan Ashraf
Chief Executive Officer at Cosmix Engineering (pvt) Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Mohammed Mobinul Haque
Zeeshan is dedicated to work with complete vision of strategic requirement.
Mohammed Mobinul Haque
Zeeshan is dedicated to work with complete vision of strategic requirement.
Mohammed Mobinul Haque
Zeeshan is dedicated to work with complete vision of strategic requirement.
Mohammed Mobinul Haque
Zeeshan is dedicated to work with complete vision of strategic requirement.
Experience
-
Cosmix Engineering (pvt) Ltd.
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Chief Executive Officer
-
Jun 2014 - Present
-
-
-
LG Electronics
-
South Korea
-
Computers and Electronics Manufacturing
-
700 & Above Employee
-
Manager R&D
-
Apr 2010 - May 2014
Responsibility includes HVAC/cogenerations Project Feasibilities studies technical and financial wise, turnkey solutions, Project Specification, detailing, contract writing, building fenestration analysis, Estimations, service and backup planning, training, Coordination of Projects handling from Design to commissioning. Forecast and stock planning, import, budget planning, Potential job analysis. Potential job analysis and probability analysis. Strategic spokes on equipment performance and operation, Product technical briefings to Clients,/consultant. Heat Recovery and CHP System Design, installation and Commissioning. Projects Soorty Enterprises Phase 01, 1st Multi – V(Inverter Based VRV Units) Installation and Commissioning Soorty Enterprises Phase 02, Multi – V(Inverter Based VRV Units) Installation and Commissioning Soorty Spinning Phase 03, Multi – V(Inverter Based VRV Units) Design PIA Planetarium at Jinnah Terminal Karachi. (CAC-PAC) Turkish Mosque, Bin Qasim. (CAC-FSD) Show room at Regent Plaza, Karachi. (CAC-CST) Data Center for Faysal Banks at Honda Building Karachi. (CAC-FSD) Reckitt and Benckiser Pvt Limited, Head Office Building, Multi – V(Inverter Based VRV Units) HBL 23rd Floor II Chundigar Road Karachi, A/C for Main cafeteria. (CAC-CSD) Getz Pharma, MRV Units. Pearl Benquet Centrifugal Chiller supplies installation and Commissioning, 1200 RT Aysha Steel DGFA Chiller supplies installation and Commissioning. 180RT English Biscuits Manufacturers, Renovation of plant room. 380RT HEJ Cogeneration System, Installation and Commissioning. 200RTSpecial Achievement:FEB, 2011 : 1st VRV (inverter Driven) system supply, installed and Commissioned at Soorty Enterprises. FEB, 2013 : 1st inverter Driven Centrifugal system supply, installed and Commissioned at Soorty Enterprises. FEB, 2013 : Commissioning of Cogeneration System at HEJ.
-
-
-
Johnson Controls
-
Ireland
-
Industrial Machinery Manufacturing
-
700 & Above Employee
-
Assistant Manger Applications at Greaves Airconditioning (Pvt) Ltd.
-
May 2008 - May 2010
ResponsibilitiesServed as Head of Application department & Senior Services/Technical Support Engineer for YORK & Dunham-Bush HVAC Products in Pakistan. Duties include preparation of Product, project and investment based Presentations for consulting engineers, client and management. Competitors analysis technical and financial, Technical support managing & preparing of Equipment selection on specialized specification, Designing of HVAC system only on turnkey based projects, preparation of B.O.Qs / Tender documents also as part of sales department involved in commercial issues, import, finance, L/C and other potential job analysis and comparisons. Duties also include product & its related operation technical briefings to consultants, Site and branch offices engineers. Additional duties include designing of HVAC system for Group of companies (Ghulam Faruque Group) including Project/Services departments on HVAC systems.Some projects completed successfully Sales and Application of Lums University of Science and Mangment, Lahore. (8000TR) Sales and Application of Air Cooled Chiller for G&T Tower, Karachi (300 TR) Design Sales and Application of Air Cooled Chiller for Pakistan Beverages (PEPSI) (500TR) Application and Installation of CRAC Unit at Standard Chartered HO. Karachi(55 TR) Application and Installation of Sonafi Aventis Pharma, Karachi (1250 TR) Design and Installation of CRAC Unit for Faysal Bank HO, Karachi. (32 TR) Application and Sales of AHU & FCU for Sheikh Zaid, Hospital, (300 TR X 02) Application and Commissioning of A/c plant at Manzali Gas Oil Field, Kohat (1050 TR)
-
-
-
-
Design Engineer Mechanical, M/s. S. Mehboob & Co.
-
Jun 2006 - May 2008
Responsibilities Projects handled independently from Concept to Commissioning, Direct reporting to Architects and MEP consultant. Preparation of tender docs. with specialized Specs writing, BOQ, Cost Estimations, coordinated drawing, Financial & Technical Bids Evaluation, Client Handling, Design Coordination, Technical and financial feasibility of centralized MEP Systems and Supervision of works at Site.HVACCooling Load calculations, Equipments, Piping, Air Devices, and ducts sizing. Calculation, Selections and sizing of Electrical and Water Utility rated system, Making alternate energy efficient option/solution as per site conditions and requirement. PlumbingDesigning of Fire fighting, Domestic, Drinking, Storm, Condensate, Grey, black, other Drainage, Swimming Pool and Water Body System. Including RO Plant and STP Plant design.Projects Trakker Tower, Karachi. World Trade Center, Doha Qatar. Sofitel Hotel (Accor), Karachi. Ghouse Akber Residency, Karachi. Ali Jameel Residency, Karachi. National Academy of Performing Arts, Karachi. Dubai Lagoon, Dubai. Trust Algeria, Algeria. Warid Tower, Lahore. Asian Hotel, Lahore. Bnm Fazco, Sharja. Bald Air Base Hospital, Iraq. Grand Haytt, Islamabd. Pearl continental Hotel, Gawadar. UBL Head Office Building, Karachi. Wateen Telecom, Lahore. Al Hamria Port Building, Dubai. Al Hawai Tower, Dubai. Staff Accommodations, Dubai. Paragon Office Building (green building), Karachi. Infrastructure for Ghorag Hills, Dadu. Belyoha's Office buildings, Dubai
-
-
-
-
Assistant Project Engineer, M/s. SY Associates,
-
May 2005 - Jun 2006
Responsibilities Installations supervision, Biding, QS, Billing, Material and labor at site, Plant room's shop drawings ,etcProjects Ventilation System for M/s. Techno Glass Shifting of Chilled Water Piping System and Ancillary Works for M/s. Parke Davis & Co., Ltd, Replacement of Main Chiller in Central Plant Room at M/s Roche Pakistan Ltd. Ventilation system for Change Room and Lockers Area at M/s Ali Gohar Pharma. Installation of 150TR of Chilled water plant for M/s Eli Lilly Gohar Parma Installation of Split Unit for Capsule storage area at M/s Glaxo Smith Kline Xanax Manufacturing for M/s. Parke Davis & Co., Ltd,
-
-
-
-
Mechanical Supervisor, M/s. Gatron Industries Ltd,
-
Feb 2002 - Apr 2005
ResponsibilitiesInvolved and supervised all types of mechanical maintenance and erections related activity. MaintenanceDaily, weekly and Monthly checks of all rotary inside plant, Maintained computerized log sheet to check the operating parameter of machines like amperage, Vibration and others operational fault notes, Performed and supervised Hourly based different maintenances like lubrications, major and minor overhaul. Issuing of work permit (for maintenance), making job description, performing others safety checks of Machines.ErectionSupervision of Installations activity, manual drafting, coordination of services from marking to placement with civil, electrical, instrumentation and other administrational departments.
-
-
Education
-
NED University of Engineering and Technology
Bachelor's degree, Mechanical Engineering -
Govt. College
-
High Star Public Sec. School