Zeeshan Asghar

Plant Manager at Sabirs' Group of Companies
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Lahore District, Punjab, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Food and Beverage Services
    • 100 - 200 Employee
    • Plant Manager
      • Jul 2022 - Present

    • Pakistan
    • Farming
    • 300 - 400 Employee
    • Engineering And Maintenance Manager
      • Jun 2016 - Aug 2022

      As a Manager Engineering & Maintenance (Head Engineering Department) I am responsible for Pakistan’s largest feed manufacturing plant (120 Mtons/Hour) and look after the whole process of the plant. (Work with chine’s Engineer of Muyang Holdings International). •Responsible for Pakistan’s largest feed manufacturing plant and getting maximum efficiency of 88.5 % by applying some methodologies. • Applied Lean six sigma technology to minimize wastage and improved processes to reduce energy cost per bag. • Conducted the energy audit of the plant and save the energy losses and energy costs up to 30% at different points. • Achieved Production & maintenance objectives through the recruitment, selection, training, scheduling, coaching, and discipline of employees. • Save 1.1Million PKR/Year in the maintenance process by doing research and development and improvement in machinery parts. • Monitoring day-to-day production & maintenance goals, plant performance, and preparing schedules for goal achievement. • Calculate Heating Load for Installation of HVAC System in the minimum budget for Broiler Hatchery and Feed Mill. • Installation and Maintenance of passenger and cargo lift for the easy movement of workers from floor to floor. • Negotiated and signed a contract with Allied Engineering for (15 Mtons/hour) Rice plant for shahkot and Khanewal sites. • Design Layout for Rice Plant and complete it before the time limit with 95 % production efficiency. • Coordinate with GSI USA engineers for the installation and commissioning of 60 Mtons/Hour Maize dryer. • Do alterations in the existing maize dryer for the drying of paddy with the same setup and do successfully achieve set goals. • Set Goals for the maximum production output of Pellet Mill roll shell Bearings and get production higher than the set goals of 2.5 M Bags by doing vibration analysis. • Prepare documentation for the LPG storage system for licensing and implemented physically on the site as per OGRA requirements. Show less

    • Mechanical Engineer
      • Aug 2014 - Jul 2016

      I started my career as a mechanical engineer at FOAR Innovative technologies Pvt. Ltd. Where my key responsibility was to lead the mechanical workshop and fabricate machines as per the given drawings, but after looking at my performance they give me a chance to lead the whole project which I have completed successfully. • Designing and Manufacturing of Asphalt Plant. • Designing and Manufacturing of Pugmill Plant. • Designing and Manufacturing of Road marking machine. • Maintenance and look after utilities i.e., Boiler and Genset. • Installation and maintenance of Air Compressors for the supply of compressed air to pneumatic instruments. • Installation Of Electrical Panels and Automation systems with Research and Development to increase efficiency. Show less

Education

  • University of Engineering and Technology, Taxila
    Master of Engineering - MEng, Industrial Engineering
    2015 - 2017
  • University of Engineering and Technology, Lahore
    Bachelor of Engineering (BE), Mechanical Engineering
    2010 - 2014
  • University of Engineering and Technology, Lahore
    B.Sc Mechanical Engineering, Mechanical Engineering
    2010 - 2014

Community

You need to have a working account to view this content. Click here to join now