Zamzuri Abd Rahim

Assistant Resident Engineer at Mutiara Perlis Sdn Bhd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Kubang Semang, Penang, Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Malaysia
    • Transportation, Logistics, Supply Chain and Storage
    • 1 - 100 Employee
    • Assistant Resident Engineer
      • Mar 2023 - Present
    • Malaysia
    • Staffing and Recruiting
    • 100 - 200 Employee
    • CW Project Manager
      • Dec 2021 - Mar 2023
    • Construction
    • 200 - 300 Employee
    • Project Manager
      • Aug 2020 - Mar 2022
    • Manager, Property
      • Oct 2015 - Mar 2022

      Involve in Penang Sentral Development at Butterworth, Pulau Pinang with consist of: 1. Transportation Terminal 2. Retail Mall 3. Hotel Tower 4. Office Tower - Involve in preliminaries study of design development. - Liaise with consultant on design brief - Liaise with Quantity surveyor on TCC of development - Liaise with relevant authorities on the Development Order (DO) preparation and approval - Liaise with relevant authorities on the Building Plan submission and approval - Managing consultant on the Tunai Syarat compliance - Contract Management - Preparing management paper to management - Preparing and update Master Development schedule including financial S-Curve. - Involve in the tender process until awarding the contractor - Managing and arranging sabordinate for site activity - Review drawings to relevant parties. - Prepare Project Quality Plan (PQP), maintaining quality record and implement the ISO 9001: 2008, Quality Management System at site. - Prepare Project Environmental Management Plan PEMP), maintaining the record and implement the ISO 14000, Environmental Management System at site. - Prepare Master Work Program include with Physical S-Curve and Financial S-Curve for monitoring the work progress. - Establish the work plan, schedules including subcontracting plans and mobilization plan and review them periodically to ensure the project performing. - Establish and control the overall project budget. - Conduct technical and contractual reviews to ensure that the work is being executed in accordance with the Contract Document. - Check and verified the subcontractor monthly claim. Show less

    • Construction
    • 1 - 100 Employee
    • Sr. QAQC Engineer
      • Oct 2012 - Sep 2015

      Involved in Sea Reclamation Project Involved in Master Infrastructure Works (Phase 2) Project Involved in Jelutong Expressway (Phase 3) Project - Establish and update the QA Manual and Procedures to be applied for various stages of the Project. - Monitor and verify that all activities being performed are in accordance with QA manual. - Review and approve QA manuals being used by vendors and subcontractors, prior to purchase order placement. - Ensure that vendors and subcontractors comply with the QA procedures. - Direct and supervise the inspection work at field. - Review and transmit drawings to relevant parties. - Prepare Project Quality Plan (PQP), maintaining quality record and implement the ISO 9001: 2008, Quality Management System at site. - Prepare Project Environmental Management Plan PEMP), maintaining the record and implement the ISO 14000, Environmental Management System at site. - Prepare Master Work Program include with Physical S-Curve and Financial S-Curve for monitoring the work progress. - Establish the work plan, schedules including subcontracting plans and mobilization plan and review them periodically to ensure the project performing. - Establish and control the overall project budget. - Conduct technical and contractual reviews to ensure that the work is being executed in accordance with the Contract Document. - Prepare monthly project report for Client and Head Quarters. - Check and verified the subcontractor monthly claim. Show less

    • Education Administration Programs
    • 700 & Above Employee
    • Resident Engineer
      • Feb 2011 - Sep 2012

      1. Being client representative S.O for (KPM) at site to monitor all activity and reporting to HQ 2. Check deference between tender drawing and construction drawing. 3. Check CPM that been prepared by Contractor 4. Chairing site meeting and technical meeting. 5. Verified contractor monthly claim. 6. Review the quality report/ test report. 7. Check the work quality such as concreting, formwork acc. 1. Being client representative S.O for (KPM) at site to monitor all activity and reporting to HQ 2. Check deference between tender drawing and construction drawing. 3. Check CPM that been prepared by Contractor 4. Chairing site meeting and technical meeting. 5. Verified contractor monthly claim. 6. Review the quality report/ test report. 7. Check the work quality such as concreting, formwork acc.

    • Project Manager
      • Feb 2010 - Feb 2011

      - Prepare Master Work Program include with Physical S-Curve and Financial S-Curve for monitoring the work progress. - Establish the work plan, schedules including subcontracting plans and mobilization plan and review them periodically to ensure the project performing. - Establish and control the overall project budget. - Conduct technical and contractual reviews to ensure that the work is being executed in accordance with the Contract Document. - Prepare monthly project report for Client and Head Quarters. - Check and verified the subcontractor monthly claim. Show less

    • Resident Engineer
      • Sep 2008 - Jan 2010

      1.Involved in project Cadangan Membina dan Menyiapkan Rumah Keluarga (121 Unit)Pelbagai Kelas dan Kerja-Kerja Berkaitan Untuk Pegawai dan Anggota Tentera Darat di Kem Sg. Ara, Pulau Pinang. - Review and approved Method Statement that submitted by Contractor. - Review the quality report/ test report. - Check the work quality such as concreting, formwork acc. - Provide detail of drawing that require by Contractor. - Attend meetings, site inspections to monitor progress & conformance to plans & safety standards - Prepare the monthly report for client (ARMY). - Coordinate with other party such as Architect and M&E Consultant Show less

    • Assistance Project Manager
      • Dec 2006 - Aug 2008

      1.Involved in Proposed of renovation and extension of Senai Airport International Terminal, Senai, Johor.(Project Cost :RM 100 million). 2.Involved in Proposed Low Cost Flat on Lot PTB 21509 at Kg. Muafakat, Johor Bahru, Johor. (Project Cost :RM 24 million) - Prepare Project Quality Plan (PQP), maintaining quality record and implement the ISO 9001: 2008, Quality Management System at site. - Prepare Project Environmental Management Plan (PEMP), maintaining the record and implement the ISO 14000, Environmental Management System at site. - Prepare Master Work Program include with Physical S-Curve and Financial S-Curve for monitoring the work progress. - Establish the work plan, schedules including subcontracting plans and mobilization plan and review them periodically to ensure the project performing. - Establish and control the overall project budget. - Conduct technical and contractual reviews to ensure that the work is being executed in accordance with the Contract Document. - Prepare monthly project report for Client and Head Quarters. - Check and verified the subcontractor monthly claim. Show less

Education

  • Universiti Tun Hussein Onn Malaysia
    civil engineering, Civil Engineering Technologies/Technicians
    1999 - 2004
  • Sekolah Menengah Teknik Kangar
    SPM

Community

You need to have a working account to view this content. Click here to join now