Certified Welder (CW)
Bureau Veritas Primary IntegrationJul, 2017- Oct, 2024 -
CSWIP 3.1 Welding Inspector
TWI Malaysia – Training and Engineering ServicesMay, 2021- Oct, 2024 -
Visual Welding Inspector 3.0
CSWIP - Certification Scheme for PersonnelFeb, 2018- Oct, 2024
Experience
-
TENAGA TIUB SDN BHD
-
Malaysia
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
QA/QC Inspector
-
Jan 2023 - Present
1) Client : TOYO ENGINEERING CONSTRUCTION SDN BHD - Fabrication of 5 unit heat exchanger (U) - Fabrication of 1 unit Tower Column (U) - U-1, U-4, U-5 & U-1A - Monitor fabrication stage of heat exchanger 2) Client: MRCSB RESET - Super heater bundle installation at site - monitor fabrication stage at site (i.e fit-up, correct consumables using, arrange ndt) 3) Client : PCGOD (Glycols) - Fabrication of 1 unit fixed tube sheet heat exchanger (U) - Cladding material (i.e SA182 + C7060 clad & SA 516 Gr.70 + SA 304L & fitting overlay weld) - U-1, U-4 & U-5 4) Client : MRCSB - Fabrication of 2 unit channel head (Heat exchangers) - cladding material (i.e SA387 + SA321 & fitting overlay weld) 5) Client : MRCSB RESET - Fabrication of 3 unit of Tube bundle - H2s system heat exchanger - Fabrication stage monitoring - Show less
-
-
-
Syarikat Steelcon Sdn Bhd
-
Malaysia
-
Oil and Gas
-
1 - 100 Employee
-
QC Inspector
-
May 2022 - Dec 2022
• QatarGas piping and Skid structure project • Monitoring WQT • Inspecting, visual and dimensional piping / structure skid working with itp and codes standard • Piping fabrication inspection activity • Documentation • ASME IX, ASME V, ASME Viii, ASME B31.3 • QatarGas piping and Skid structure project • Monitoring WQT • Inspecting, visual and dimensional piping / structure skid working with itp and codes standard • Piping fabrication inspection activity • Documentation • ASME IX, ASME V, ASME Viii, ASME B31.3
-
-
-
Rwna Engineering Sdn Bhd
-
Oil and Gas
-
100 - 200 Employee
-
QC Inspector
-
Jan 2022 - May 2022
• PCMTBE EPCC Boiler B-1002 project • Refurbish, fabricate and Retubing boiler for MTBE PETRONAS plant • Working with ITP, SOW and Procedure standard • Monitoring fabrication part, expanding tube, bending tube, and swaging tube • Working with technical drawing PNID and ISO Drawing • Monitoring WQT and assist for preparing WPS • (ASME I, ASME II A/B, ASME V, ASME IX, ASME B31.1) • PCMTBE EPCC Boiler B-1002 project • Refurbish, fabricate and Retubing boiler for MTBE PETRONAS plant • Working with ITP, SOW and Procedure standard • Monitoring fabrication part, expanding tube, bending tube, and swaging tube • Working with technical drawing PNID and ISO Drawing • Monitoring WQT and assist for preparing WPS • (ASME I, ASME II A/B, ASME V, ASME IX, ASME B31.1)
-
-
-
CS Wind Malaysia
-
Malaysia
-
Renewables & Environment
-
1 - 100 Employee
-
Quality Control Inspector
-
Dec 2019 - Jan 2022
• Visually inspecting parts for defects or damage. • Determining the minimal requirements and procedures needed for a process to pass a QA inspection. • Ensuring that adequate corrective measures are implemented in cases of noncompliance. • Working from technical drawings. • Oversee the proper identification for all parts and components used in the production process. • Conducting visual mechanical inspection of components. • Maintaining traceable records that can be used in audits. • Measure, visual and monitor fitup process Show less
-
-
-
Dynaciate Engineering sdn bhd
-
Construction
-
100 - 200 Employee
-
Quality Control Inspector
-
Feb 2018 - Sep 2019
• Petronas RAPID EPCC package 5 project, process piping ASME B31.3 • Monitoring WQT • Mechanical, equipment and welding inspection • Working with ITP, SOW and Procedure standard • Maintained design standards for facilities and equipment • Provided technical support during construction, system commissioning and perfomance monitoring • Maintained and organized all records, documentation, and other files associated with quality engineering and inspection tasks. • Petronas RAPID EPCC package 5 project, process piping ASME B31.3 • Monitoring WQT • Mechanical, equipment and welding inspection • Working with ITP, SOW and Procedure standard • Maintained design standards for facilities and equipment • Provided technical support during construction, system commissioning and perfomance monitoring • Maintained and organized all records, documentation, and other files associated with quality engineering and inspection tasks.
-
-
Education
-
Giat MARA
Professional certification, welding fabrication and technology -
ABM wilayah timur
Professional certification, Welding Technology/Welder -
Giat MARA
Professional certification, Welding Technology/Welder