zairie azril

QA/QC Inspector at TENAGA TIUB SDN BHD
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certified Welder (CW)
    Bureau Veritas Primary Integration
    Jul, 2017
    - Oct, 2024
  • CSWIP 3.1 Welding Inspector
    TWI Malaysia – Training and Engineering Services
    May, 2021
    - Oct, 2024
  • Visual Welding Inspector 3.0
    CSWIP - Certification Scheme for Personnel
    Feb, 2018
    - Oct, 2024

Experience

    • Malaysia
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • QA/QC Inspector
      • Jan 2023 - Present

      1) Client : TOYO ENGINEERING CONSTRUCTION SDN BHD - Fabrication of 5 unit heat exchanger (U) - Fabrication of 1 unit Tower Column (U) - U-1, U-4, U-5 & U-1A - Monitor fabrication stage of heat exchanger 2) Client: MRCSB RESET - Super heater bundle installation at site - monitor fabrication stage at site (i.e fit-up, correct consumables using, arrange ndt) 3) Client : PCGOD (Glycols) - Fabrication of 1 unit fixed tube sheet heat exchanger (U) - Cladding material (i.e SA182 + C7060 clad & SA 516 Gr.70 + SA 304L & fitting overlay weld) - U-1, U-4 & U-5 4) Client : MRCSB - Fabrication of 2 unit channel head (Heat exchangers) - cladding material (i.e SA387 + SA321 & fitting overlay weld) 5) Client : MRCSB RESET - Fabrication of 3 unit of Tube bundle - H2s system heat exchanger - Fabrication stage monitoring - Show less

    • Malaysia
    • Oil and Gas
    • 1 - 100 Employee
    • QC Inspector
      • May 2022 - Dec 2022

      • QatarGas piping and Skid structure project • Monitoring WQT • Inspecting, visual and dimensional piping / structure skid working with itp and codes standard • Piping fabrication inspection activity • Documentation • ASME IX, ASME V, ASME Viii, ASME B31.3 • QatarGas piping and Skid structure project • Monitoring WQT • Inspecting, visual and dimensional piping / structure skid working with itp and codes standard • Piping fabrication inspection activity • Documentation • ASME IX, ASME V, ASME Viii, ASME B31.3

    • Oil and Gas
    • 100 - 200 Employee
    • QC Inspector
      • Jan 2022 - May 2022

      • PCMTBE EPCC Boiler B-1002 project • Refurbish, fabricate and Retubing boiler for MTBE PETRONAS plant • Working with ITP, SOW and Procedure standard • Monitoring fabrication part, expanding tube, bending tube, and swaging tube • Working with technical drawing PNID and ISO Drawing • Monitoring WQT and assist for preparing WPS • (ASME I, ASME II A/B, ASME V, ASME IX, ASME B31.1) • PCMTBE EPCC Boiler B-1002 project • Refurbish, fabricate and Retubing boiler for MTBE PETRONAS plant • Working with ITP, SOW and Procedure standard • Monitoring fabrication part, expanding tube, bending tube, and swaging tube • Working with technical drawing PNID and ISO Drawing • Monitoring WQT and assist for preparing WPS • (ASME I, ASME II A/B, ASME V, ASME IX, ASME B31.1)

    • Malaysia
    • Renewables & Environment
    • 1 - 100 Employee
    • Quality Control Inspector
      • Dec 2019 - Jan 2022

      • Visually inspecting parts for defects or damage. • Determining the minimal requirements and procedures needed for a process to pass a QA inspection. • Ensuring that adequate corrective measures are implemented in cases of noncompliance. • Working from technical drawings. • Oversee the proper identification for all parts and components used in the production process. • Conducting visual mechanical inspection of components. • Maintaining traceable records that can be used in audits. • Measure, visual and monitor fitup process Show less

    • Construction
    • 100 - 200 Employee
    • Quality Control Inspector
      • Feb 2018 - Sep 2019

      • Petronas RAPID EPCC package 5 project, process piping ASME B31.3 • Monitoring WQT • Mechanical, equipment and welding inspection • Working with ITP, SOW and Procedure standard • Maintained design standards for facilities and equipment • Provided technical support during construction, system commissioning and perfomance monitoring • Maintained and organized all records, documentation, and other files associated with quality engineering and inspection tasks. • Petronas RAPID EPCC package 5 project, process piping ASME B31.3 • Monitoring WQT • Mechanical, equipment and welding inspection • Working with ITP, SOW and Procedure standard • Maintained design standards for facilities and equipment • Provided technical support during construction, system commissioning and perfomance monitoring • Maintained and organized all records, documentation, and other files associated with quality engineering and inspection tasks.

Education

  • Giat MARA
    Professional certification, welding fabrication and technology
    2017 - 2017
  • ABM wilayah timur
    Professional certification, Welding Technology/Welder
    2016 - 2016
  • Giat MARA
    Professional certification, Welding Technology/Welder
    2015 - 2015

Community

You need to have a working account to view this content. Click here to join now