Zain-Ul Abidin

Aftersales Engineer at MO.TRI.DAL SPA
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Piacenza, Emilia-Romagna, Italy, IT
Languages
  • English Professional working proficiency
  • Italian Elementary proficiency
  • Urdu Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Italy
    • Machinery Manufacturing
    • 1 - 100 Employee
    • Aftersales Engineer
      • Mar 2018 - Present

      Spare parts management Spare parts lists of the installed Plants for the clients Spare parts drawings Spare parts supply Organize shipments according to INCOTERMS 2010 Loading plans of the shipments Spare parts management Spare parts lists of the installed Plants for the clients Spare parts drawings Spare parts supply Organize shipments according to INCOTERMS 2010 Loading plans of the shipments

    • Pakistan
    • Wholesale Building Materials
    • 500 - 600 Employee
    • Deputy Manager WHRPP
      • Jul 2014 - Oct 2014

      Worked as Area Incharge (Deputy Manager Mechanical) for Operation/Maintenance at Waste Heat Recovery Power Plant 8.6 MW.Activities:• Maintenance of Turbine (General Electric 10MW horizontally split back pressure, Refurbished by RMS) Performed disassembly and assembly of turbine to refurbish rotor shaft at damaged area along with experts from Rotating Machinery Service & Macek Power USA. Replaced the bearings of turbine.• Maintenance of Pumps (Flowserve Pumps WXB and WUC ) Replaced the bearings of these pumps. Replaced the Mechanical Seals of Pumps.• Preventive Maintenance of Compressors (Ingersol Rand DN 251N-A 255 Nm3/hr and Atlas Copco GA200W 470 l/s)• Maintenance of GrundFos Multistage Centrifugal Pumps.• Maintenance of Goulds Pumps (Centrifugal Pump LF 3700 SA) Show less

    • Assistant Manager (Mechanical)
      • Jul 2013 - Jun 2014

      Worked as an Area In-charge for Operation and Maintenance at Waste Heat Recovery Power Plant.Activities:• Maintenance of Turbine (General Electric 10MW horizontally split back pressure, Refurbished by RMS) Performed disassembly and assembly of turbine to refurbish rotor shaft at damaged area along with experts from Rotating Machinery Service & Macek Power USA. Replaced the bearings of turbine.• Maintenance of Pumps (Flowserve Pumps WXB and WUC ) Replaced the bearings of these pumps. Replaced the Mechanical Seals of Pumps.• Preventive Maintenance of Compressors (Ingersol Rand DN 251N-A 255 Nm3/hr and Atlas Copco GA200W 470 l/s)• Maintenance of GrundFos Multistage Centrifugal Pumps.• Maintenance of Goulds Pumps (Centrifugal Pump LF 3700 SA) Show less

    • Assistant Manager
      • Jul 2011 - Jun 2013

      Worked as a Project Engineer for the Fabrication, Erection and Commissioning of Waste Heat Recovery Power Plant 8.6 MW.Successfully Erected and Commissioned project of Waste heat Recovery Power Plant (kalina cycle) for generation of 8.6 MW for 6700t/d cement plant.  Steel Structure HRVGS (Heat Recovery Vapor Generator) Piping Turbine (General Electric 10 MW Horizontal Split axial impulse type, Multi Valve back pressure Refurbished by RMS) Lufkin Gear (N2402C, Ratio 2.804:1) Generator (ABB Synchr Gen AMS 800LE 12000KVA X 0.8, 3~50Hz) Pumps (Flowserve, Grundfos and Goulds Pumps) Compressors (Ingersol Rand 255 Nm3/hr) Cooling Tower (Liangchi) Show less

    • Trainee Engineer
      • Jul 2010 - Jun 2011

      Worked as an Area Engineer at Kiln, Raw Mill & Coal Mill Area.Activities:• Review & monitor corrective action and modification / update drawings to ensure improvement in the performance of machine and equipment and follow up / study of failure to avoid re-occurrence of failure & improve reliability. • Preventive & predictive maintenance plans to minimize the breakdown of machine & maximize the availability of equipment at efficient level by using Enterprise Asset Management “eAM” program (Oracle ERP) & X-PLAIN–II a soft ware of computerized management system of systematic maintenance (FLS).• Preparation, planning & execution of shut down activities & to keep machine history in ERP system for analysis of machine condition.• Maintaining & requisitioning stocks of consumable spare parts using ERP system in store.• To keep close liaison with Audit of ISO 9001 & 14001 by managing document & record to achieve the requirement of clauses of Quality & Environmental management program & to ensure compliance to all relevant safety, quality & environmental management policies, procedures & controls across the Mechanical section.Worked for the fabrication, Erection and Commissioning of RDF (Refused Drived Fuel)In 2010 year successfully erected and commissioned the RDF plant (20t/h) for 6700t/d cement plant, in which complete screening, shredding, storage, weighing and dosing system involved. Steel structure Conveying System Shredders Show less

Education

  • Politecnico di Torino
    Master's Degree, Petroleum Engineering
    2014 - 2017
  • University of Engineering and Technology, Taxila
    B.Sc, Mechanical Engineering
    2005 - 2009
  • Fazaia Inter College Lahore Pakistan
    HSSC, Pre-Engineering
    2003 - 2005
  • Defence Public School Lahore Pakistan
    SSC, Science
    1993 - 2003

Community

You need to have a working account to view this content. Click here to join now