    • Lead Planning Engineer
      • Aug 2021 - Present

    • Lead Planning Engineer
      • Aug 2021 - Jan 2023

      Worked as Lead engineer including all works in construction of Sewage treatment plant, Reverse Osmosis plant RO, Integrated Waste management facilities, District cooling plant, PV solar farm, BESS, ICE and pipeline installation works. Dealing with client in meetings, ensuring work is complying to employee demands. Planning and monitoring all works schedule. Keeping track of all trackers and progress in check.

    • Saudi Arabia
    • Oil and Gas
    • 1 - 100 Employee
    • Planning Engineer
      • Jul 2019 - Dec 2021

      Firstly worked in construction site then was given a chance in project management team as planning engineer for a GCP construction work including buildings infrastructure, landscaping, piping, mechanical equipments erection, plumbing, electrical and I&C works. Did work on monitoring and control of project progress. Monitoring all KPI's, updating and preparing reports. Firstly worked in construction site then was given a chance in project management team as planning engineer for a GCP construction work including buildings infrastructure, landscaping, piping, mechanical equipments erection, plumbing, electrical and I&C works. Did work on monitoring and control of project progress. Monitoring all KPI's, updating and preparing reports.

    • Saudi Arabia
    • Chemical Manufacturing
    • 700 & Above Employee
    • Planning Engineer
      • Feb 2021 - Aug 2021

      Working in Project management execution team. Working over different MOC's including bypass lines, tie ins, hot tapping, pressure vessel fabrication and replacement, reactors baffle modification, compressor rotor shaft and impeller replacement, wax oil separator silo steam tracing, heat exchangers tubing repairs. Planning of all these MOC schedules and materials BOQ. Working in Project management execution team. Working over different MOC's including bypass lines, tie ins, hot tapping, pressure vessel fabrication and replacement, reactors baffle modification, compressor rotor shaft and impeller replacement, wax oil separator silo steam tracing, heat exchangers tubing repairs. Planning of all these MOC schedules and materials BOQ.

    • China
    • Oil and Gas
    • 200 - 300 Employee
    • Lead Planning Engineer
      • Apr 2017 - Jul 2019

      Prepared baseline for fuel base power and desalination plants comprising of 28000 activities, assigning units/costs and preparing all S Curves for reporting purposes. Major work phases include construction of utilities building's, BOP buildings, infrastructure, landscaping, turbines installation, Boilers installation, substation, all other construction and commissioning works. Prepared baseline for fuel base power and desalination plants comprising of 28000 activities, assigning units/costs and preparing all S Curves for reporting purposes. Major work phases include construction of utilities building's, BOP buildings, infrastructure, landscaping, turbines installation, Boilers installation, substation, all other construction and commissioning works.

    • South Korea
    • Construction
    • 700 & Above Employee
    • Planning Engineer
      • Nov 2014 - Mar 2017

      Worked in construction and planning department for construction of LDPE, HDPE, MTO, TPO plants. Main work was included monitoring and control of all planned activities. Was incharge of PCS-1 system including piping and tanks erection, pressure vessels erection, reactors and silos installation. Planning, reporting, monitoring of all packages. Worked in construction and planning department for construction of LDPE, HDPE, MTO, TPO plants. Main work was included monitoring and control of all planned activities. Was incharge of PCS-1 system including piping and tanks erection, pressure vessels erection, reactors and silos installation. Planning, reporting, monitoring of all packages.

    • United Kingdom
    • Pharmaceutical Manufacturing
    • 700 & Above Employee
    • Mechanical Engineer
      • Jan 2014 - Nov 2014

      Hvac and Piping works construction, commissioning and operation of Air handling unit. Pre construction design modification, planning work breakdown structure, execution of construction activities and safe operation. Hvac and Piping works construction, commissioning and operation of Air handling unit. Pre construction design modification, planning work breakdown structure, execution of construction activities and safe operation.

    • Pakistan
    • Construction
    • 1 - 100 Employee
    • Planning Engineer
      • Jun 2012 - Dec 2013

      Worked as planning engineer for construction of pipeline including piping fabrication, tank fabrication. Main responsibilities were to monitor and control project progress. Preparing new schedules for section. Worked as planning engineer for construction of pipeline including piping fabrication, tank fabrication. Main responsibilities were to monitor and control project progress. Preparing new schedules for section.

Education

  • University of Engineering and Technology, Lahore
    Bachelor of Engineering - BE, Mechanical Engineering
    2008 - 2012
  • University of Engineering and Technology, Lahore
    Bachelor of Engineering - BE, Mechanical Engineering
    2008 - 2012

Community

You need to have a working account to view this content. Click here to join now