Zahid Ahmed Jokhyo
Assistant Manager (Project Managment Unit) at Hyderabad Electric Supply Company- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Hyderabad Electric Supply Company
-
Government Administration
-
1 - 100 Employee
-
Assistant Manager (Project Managment Unit)
-
Sep 2017 - Present
-
-
-
Saudi Electricity Company
-
Saudi Arabia
-
Utilities
-
700 & Above Employee
-
Senior Engineer (Electrical)
-
Mar 2013 - Sep 2017
Quality & Performance Division. Monitoring through the Power Quality meters, the Transmission Lines & Sub Stations all over the Kingdom of Saudi Arabia. Monitoring the Key Performance Indicators (KPIs) related to Sub Stations & T/L (33KV upto 380KV). Quality & Performance Division. Monitoring through the Power Quality meters, the Transmission Lines & Sub Stations all over the Kingdom of Saudi Arabia. Monitoring the Key Performance Indicators (KPIs) related to Sub Stations & T/L (33KV upto 380KV).
-
-
-
-
Assistant Manager (Project Managment Unit)
-
Sep 2012 - Mar 2013
Started Air Bundled Cable Project ( ABC) in Hyderabad. Started Air Bundled Cable Project ( ABC) in Hyderabad.
-
-
-
Hyderabad Electric Supply Company HESCO
-
Hyderabad Pakistan
-
Asssitant Director (Power Despacth Center)
-
Sep 2011 - Aug 2012
Duties and Responsibilities Prepare / Calculating the Peak Demand, Computed Demand, Average Demand of the System. Preparing and managing the Load Management Plan for the Over Loaded Circuits and Grid Stations of HESCO System at peak hours. Prepare and manage the normal Load Management Plan according to the needs of power situation in the country. Prepare and manage the Forced Load Management plan for maintaining Frequency (50Hz) of the System. Monitor and calculate the Cutoff Point / Delivery Point Load of System. Show less
-
-
-
-
Jr. Engineer (T&G) Planning
-
Apr 2009 - Aug 2011
Transmission and Grid Station (132 KV / 11 KV ) making Feasibilities, Load Flow Studies on PSSe software. Transmission and Grid Station (132 KV / 11 KV ) making Feasibilities, Load Flow Studies on PSSe software.
-
-
-
-
-
May 2005 - Mar 2009
Duties and ResponsibilitiesConducting Power / Load Flow Analysis of 132 KV, 66 KV & 11 KV Transmission Lines and 132 / 11 KV, 66 / 11 KV Grid Stations using (Power System Simulator & Engineering) PSS/E Software.Adding Small Power Producers (SPP) Generation capacities in the existing system and conducting Power Flow Analysis for new generation with impact on existing system. Preparing the Feasibility Reports of 132 / 11 KV & 66 / 11 KV Grid Stations and 132 KV & 66 KV Transmission Lines.Electrification of Multi story buildings and Housing SchemesElectrical Load Calculations / Requirements for the site or locationVoltage Drop Calculations in the system after installation of Electrical network.Preparing WOS (Work Order System).Preparing BOQ (Bill of Quantity)Creating proposals of Rehabilitation, Bifurcation and Area Planning of electrical networks H.T / L.T (11KV and 0.4KV)Preparation of Single Line Diagram Computer Analysis for ELR ( Energy Loss Reduction)Capacitors Installation (Fixed / Switched) Calculations (Peak and Off Peak Loads)VDC (Voltage Drop Calculations) WOS (Work Order System)BOQ (Bill of Quantity). Show less
-
-
-
Sep 2002 - Apr 2005
Duties and ResponsibilitiesMonitor the execution of all construction field activities in compliance with the NEC and IEC standards at the job site. Monitor the material receiving, handling storage and perseverance, installation and testing and pre-commissioning of Transformers, Generators, Power Cables and LT/HT Structures.Review the project scope of works, approved drawings, complete technical specifications of materials and equipments.Support the operation department is implementing modification to the exiting electrical system including review of design and exercising quality control in installation of new equipment. Assist the operation and maintenance departments in conducting SAT for electrical equipment of Electrical distribution system.To ensure that the maintenance policy is managed in accordance with WAPDA safety policy.Conducting weekly system review meeting with engineers, contractors and other parties involved in the project.Ensure that records are properly maintained by the supervisors of respective for the activities carried out at site.Ensure that calibration certificates of the tools and equipments deployed for the project are valid and register for that purpose is maintained and intact.Assigning work to the field Inspectors on daily basis and monitor the progress and their findings.To ensure that the electrical system and associated equipments are managed safely and efficiently.Ensure that the Certificates of skilled technicians like welders, Cable splicers etc are valid and intact. Responsible to establish and maintain inspection records for project activities accomplished. Show less
-
-
-
Sep 2000 - Aug 2002
Duties and ResponsibilitiesMaintenance of 11 KV / 400 V various capacity transformers; Responsible for Maintenance of High Voltage 11 KV 3-phase 3-Wire and Low Voltage 400 V 3-phase 4 wire Distribution Lines.Installation of 11 KV / 400 V different capacity Transformers and 11KV / 400V Distribution lines.Preparation of L.T proposals for managing the load of the areaPreparation of H.T proposals for bifurcation of load, from overloaded feeders.TRAINING ATTENDED
-
-
-
-
Training as Junior Engineer
-
Apr 2008 - May 2008
-
-
-
-
Got Training as Trainee Engineer
-
Jun 2000 - Sep 2000
-
-
Education
-
University of Sindh
Executive MBA, Human Resources Management/Personnel Administration, General -
Mehran University of Engineering and Technology Jamshoro
Post Graduate Diploma in Electrical Power -
Mehran University of Engineering and Technology
B.E, Electrical -
Model School, Sindh University Hyderabad
H.S.C, Science -
FAITH College of Information Technology
Diploma, Computer Studies