zabrizan Muhd Amir

Project Executive at Intercontinental Specialty Fats Sdn Bhd
  • Claim this Profile
Contact Information
Location
Telok Panglima Garang, Selangor, Malaysia, MY

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Lifting Supervisor Competency
    Emrest (M) Sdn Bhd
    Jul, 2021
    - Sep, 2024

Experience

    • Malaysia
    • Food and Beverage Services
    • 1 - 100 Employee
    • Project Executive
      • May 2023 - Present
    • Malaysia
    • Chemical Manufacturing
    • 1 - 100 Employee
    • Project Supervisor
      • Nov 2021 - May 2023
    • United States
    • Chemical Manufacturing
    • 200 - 300 Employee
    • Project Supervisor
      • Feb 2011 - Nov 2021

      Responsible for the planning, design and supervision of equipment and piping work on site. •Determine spec and design verification. •Monitoring and supervising the piping fabrication activities carried out by the module fabricator •Monitor the quality and progress of the work scope and adherence to company and contractor procedures. •Ensuring that the piping fabrication and assembly activities are carried out to the schedule and highest HSE standards. •Ensuring necessary HSE reviews are undertaken and identified actions completed. •Providing weekly progress reports. •Participating in fabrication and safety reviews for piping fabrication and assembly works. •Providing technical support to the project on piping fabrication, installation, commissioning and Hook up. •Ensuring the issuance of appropriate documentation for installation works e.g. Hiradc, work permits, blind list, etc •Provide input to Project Documents for Piping fabrication / assembly, commissioning and start-up requirements •Work closely with QA/QC testing and company O&M group. •Provide input re: operability issue associated with piping layouts, in particular low points, venting, testing, etc. . Pre-Com and Commissioning Show less

    • Asst. Engineering Superintendent
      • Feb 2009 - 2010

      Responsible for the planning, design and supervision of equipment and piping work on site.•Prepare project costing.•BQ Compilation.•Responsible on day to day modification form.•Set up and update filling system for all technical information for reference.•Involved in plant shutdown & maintenance work.•Control Project material/equipment delivered on site.•Purchasing.•Contractor selection.

    • Senior Draughtsman Cum Material Controller
      • 2007 - 2009

      Involvement in Upgrading Utility Plant : New MP BoilerNew Boiler-35 T/h @ 20 barg & 240 C and DI Plant – 110 m3/h :Determine spec. & design verificationDraw & Design Isometric Drawing.Tender preparation, evaluation Delivery, piping installations & erection Commissioning & performance test.•Beading Plant ProjectDetermine spec. & design verification Draw & Design Isometric Drawing.

    • Senior Draughstman
      • 2002 - 2006

      Job Scope and responsibility •Responsible for all mechanical and piping drawing. •Draw & Design Isometric Drawing. •Draw & Design Vessel, Tank and Equipment •Updating P&I diagram after modification work completed. Job Scope and responsibility •Responsible for all mechanical and piping drawing. •Draw & Design Isometric Drawing. •Draw & Design Vessel, Tank and Equipment •Updating P&I diagram after modification work completed.

    • Japan
    • Appliances, Electrical, and Electronics Manufacturing
    • 700 & Above Employee
    • Mechanical Technician
      • Aug 1997 - Apr 2001

Education

  • Universiti Teknologi Malaysia
    Mechanical Engineering
  • Institut Kemahiran Mara Jasin
    Mechanical Certificate, Mechanical Engineering/Mechanical Technology/Technician
  • Sekolah Menengah Meru Klang

Community

You need to have a working account to view this content. Click here to join now