Involve in some projects and studies (including researches) for energy and renewable energy: 1. Geothermal Project Phase 1 and 2 under JICA Technical Assistance Program, client: MOF and ESDM 2. Study on Overall Geothermal Procurement Process and Promotion System, client: private 3. Study on LNG Distribution and Power Plant Project Phase 1-3 under METI Japan TA; client: CMMAI 4. FBC Gap Analysis for an OBC of Waste-to-Energy PPP Project under an ADB's PDF Facility, client: Local Govt Involve in some projects and studies (including researches) for energy and renewable energy: 1. Geothermal Project Phase 1 and 2 under JICA Technical Assistance Program, client: MOF and ESDM 2. Study on Overall Geothermal Procurement Process and Promotion System, client: private 3. Study on LNG Distribution and Power Plant Project Phase 1-3 under METI Japan TA; client: CMMAI 4. FBC Gap Analysis for an OBC of Waste-to-Energy PPP Project under an ADB's PDF Facility, client: Local Govt
-
-
-
Japan International Cooperation Agency (JICA)
-
Japan
-
Civic and Social Organizations
-
700 & Above Employee
-
Geothermal Analyst for JICA Technical Assistant
-
Feb 2017 - Dec 2019
• Involved in Geothermal project preparation as a pilot project using PISP (Infrastructure Financing of Geothermal sector) Fund for SOE Drilling Scheme in Candradimuka, Dieng (with PT Geo Dipa Energy, Ministry of Finance, PT SMI, and PLN) • Involved in developing the structure, work scope, and SOP for Joint Committee (among stakeholders) under Gov’t Drilling Scheme (PISP Fund) • Developed analysis for pricing policy for geothermal and projected subsidy amount required with BKF, MOF • Analyzed other geothermal policies & regulations in Indonesia (e.g. Pre-Transaction Agreement (PTA) in Tender, Price Determination Methodology, the introduction of PPP in geothermal, etc.) • Familiar with project financing, financial modelling, process management Show less
-
-
-
-
Geophysicist
-
Nov 2013 - Jul 2015
Main responsiblity: QC Geophysicist Project: March 2014 SUBMARINE CABLE DETECTION SURVEYS (Nearshore) Client: Indocement September-October 2014 ANALOGUE GEOPHYSICAL SURVEY FOR PROPOSED PIPELINE ROUTE & FSRU LOCATION (Offshore) Client: PT. Pertamina (Persero) Main responsiblity: QC Geophysicist Project: March 2014 SUBMARINE CABLE DETECTION SURVEYS (Nearshore) Client: Indocement September-October 2014 ANALOGUE GEOPHYSICAL SURVEY FOR PROPOSED PIPELINE ROUTE & FSRU LOCATION (Offshore) Client: PT. Pertamina (Persero)
-
-
Education
-
University of Auckland
Master’s Degree, Master of Energy -
University of Auckland
Master’s Degree, Geothermal Energy Technology Postgraduate Programme -
Institut Teknologi Bandung (ITB)
Bachelor of Applied Science (BASc), Geophysical Engineering