Yordan K. Lozano Zavala

Electronic Technician at M.V. Automation Peru S.A.C.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Peru, PE
Languages
  • Español -
  • Ingles -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Peru
    • Automation Machinery Manufacturing
    • 1 - 100 Employee
    • Electronic Technician
      • Mar 2019 - Present

      In this company I develop as an electronic technician, having the opportunity to provide start-up service for machines dedicated to the production of finished syrup, for companies in the national and international beverage industry with our Italian representative TMCI Padovan. Next, I will mention my work experiences to the companies that M.V. Automation Peru provided its service. In this company I develop as an electronic technician, having the opportunity to provide start-up service for machines dedicated to the production of finished syrup, for companies in the national and international beverage industry with our Italian representative TMCI Padovan. Next, I will mention my work experiences to the companies that M.V. Automation Peru provided its service.

    • Türkiye
    • Food and Beverage Services
    • 700 & Above Employee
    • Electronic Technician
      • Feb 2023 - Apr 2023

    • Italy
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Electronic Technician
      • Nov 2022 - Feb 2023

  • Porex SA
    • Paarl, El Cabo Occidental, Sudáfrica
    • Electronic Technician
      • Oct 2022 - Oct 2022

      Commissioning and start-up of a Syrup Filters and clarification system. - I/O test of the various equipment and instruments. - Calibration of instruments. - Execution of modifications in the programming of the PLC and HMI. - Process cycle testing with product. - Training to operators. Commissioning and start-up of a Syrup Filters and clarification system. - I/O test of the various equipment and instruments. - Calibration of instruments. - Execution of modifications in the programming of the PLC and HMI. - Process cycle testing with product. - Training to operators.

    • Czechia
    • Food and Beverage Services
    • 200 - 300 Employee
    • Electronic Technician
      • Sep 2022 - Sep 2022

      Update of a syrup room and update CIP machine, for the production of soft drink. - Update the softwares PLC and Scada System. - I/O tests of the various equipment and instruments in the machines. - Process cycle testing. Update of a syrup room and update CIP machine, for the production of soft drink. - Update the softwares PLC and Scada System. - I/O tests of the various equipment and instruments in the machines. - Process cycle testing.

  • La Costeña México
    • Ecatepec de Morelos, México, México
    • Electronic Technician
      • Aug 2022 - Aug 2022

      Commissioning and start-up of a CIP washing system. - I/O test of the various equipment and instruments in the machines. - Calibration of instruments. - Validation of communication (exchange of signals). - Execution of modifications in the programming of the PLC and HMI. - Process cycle testing. - Training to operators. Commissioning and start-up of a CIP washing system. - I/O test of the various equipment and instruments in the machines. - Calibration of instruments. - Validation of communication (exchange of signals). - Execution of modifications in the programming of the PLC and HMI. - Process cycle testing. - Training to operators.

    • Italy
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Electronic Technician
      • Jul 2022 - Jul 2022

      Pre-commissioning of a syrup room, sugar dissolverand CIP washing system. - Simulation and modifications in PLC software and Scada System. - I/O test of instruments - Calibration of instruments Pre-commissioning of a syrup room, sugar dissolverand CIP washing system. - Simulation and modifications in PLC software and Scada System. - I/O test of instruments - Calibration of instruments

    • Türkiye
    • Food and Beverage Services
    • 700 & Above Employee
    • Electronic Technician
      • Feb 2022 - Apr 2022

      Commissioning and start-up of a syrup room, sugar dissolver, filters, syrup clarification system, in-line blender for production of coke and CIP washing system, for the production of soft drinks - I/O test of the various equipment and instruments in the machines. - Calibration of instruments. - Validation of communication (exchange of signals) with KHS. - Execution of modifications in the programming of the PLC and HMI. - Validation of machine passivations. - Process cycle testing with water and product. Show less

    • Italy
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Electronic Technician
      • Jan 2022 - Jan 2022

      Training of machines for syrup production, syrup room, sugar dissolvers, pasteurizers, filters, syrup clarification system and CIP washing system. - Simulation and modifications in PLC software and Scada System. Training of machines for syrup production, syrup room, sugar dissolvers, pasteurizers, filters, syrup clarification system and CIP washing system. - Simulation and modifications in PLC software and Scada System.

    • Panama
    • Food and Beverage Manufacturing
    • 700 & Above Employee
    • Electronic Technician
      • Sep 2021 - Oct 2021

      Commissioning and start-up of a new syrup room and update CIP machine, for the production of energy drink. - Update the softwares PLC and Scada System. - I/O tests of the various equipment and instruments in the machines. - Calibration of instruments. - Validation of communication (exchange of signals) with Krones. - Execution of modifications in the programming of the PLC and HMI. - Process cycle testing with product. - Training to operators Commissioning and start-up of a new syrup room and update CIP machine, for the production of energy drink. - Update the softwares PLC and Scada System. - I/O tests of the various equipment and instruments in the machines. - Calibration of instruments. - Validation of communication (exchange of signals) with Krones. - Execution of modifications in the programming of the PLC and HMI. - Process cycle testing with product. - Training to operators

    • Romania
    • Manufacturing
    • 1 - 100 Employee
    • Electronic Technician
      • Jul 2021 - Sep 2021

      Commissioning and start-up of a plate pasteurizer, tubular pasteurizer (pieces pulp's), syrup room and one system washing CIP, all machines for the production of pieces pulp's drinks. - I/O tests of the various equipment and instruments in the machines. - Calibration of instruments. - Validation of communication (exchange of signals) with Sidel. - Execution of modifications in the programming of the PLC and HMI. - Process cycle testing with water Commissioning and start-up of a plate pasteurizer, tubular pasteurizer (pieces pulp's), syrup room and one system washing CIP, all machines for the production of pieces pulp's drinks. - I/O tests of the various equipment and instruments in the machines. - Calibration of instruments. - Validation of communication (exchange of signals) with Sidel. - Execution of modifications in the programming of the PLC and HMI. - Process cycle testing with water

    • Israel
    • Food and Beverage Manufacturing
    • 1 - 100 Employee
    • Electronic Technician
      • Mar 2021 - Jun 2021

      Commissioning and start-up of a pasteurizer, a blender and a system washing CIP, all machines for the production of aseptic drinks. - I / O verification of the various equipment and instruments in the machines. - Calibration of instruments. - Validation of communication (exchange of signals) with Sidel. - Execution of modifications in the programming of the PLC and HMI. - Execution of CIP washing tests in tanks and pipes - Execution of passivation of tanks and pipes. - Execution of production tests with water. - Preparation and validation of finished syrup (first production). Show less

    • Mexico
    • Manufacturing
    • 700 & Above Employee
    • Electronic Technician
      • Jan 2021 - Feb 2021

      Commissioning and start-up of a syrup room for the production of energy drinks (Suero). - Calibration of instruments. - Execution of modifications in the programming of the PLC and HMI. - Execution of the first producction. Commissioning and start-up of a syrup room for the production of energy drinks (Suero). - Calibration of instruments. - Execution of modifications in the programming of the PLC and HMI. - Execution of the first producction.

    • Mexico
    • Manufacturing
    • 700 & Above Employee
    • Electronic Technician
      • Sep 2020 - Nov 2020

      Commissioning and start-up of a syrup room for the production of energy drinks (Suero). - I/O tests of the various equipment and instruments in the syrup room. - Calibration of instruments. - Execution of modifications in the programming of the PLC and HMI. - Execution of CIP washing tests in tanks and pipes - Execution of passivation of tanks and pipes. Commissioning and start-up of a syrup room for the production of energy drinks (Suero). - I/O tests of the various equipment and instruments in the syrup room. - Calibration of instruments. - Execution of modifications in the programming of the PLC and HMI. - Execution of CIP washing tests in tanks and pipes - Execution of passivation of tanks and pipes.

    • Panama
    • Food and Beverage Manufacturing
    • 700 & Above Employee
    • Electronic Technician
      • Jul 2020 - Sep 2020

      Commissioning and start-up of a syrup room for the production of energy drinks (Amper, Vive100, etc.). - I/O tests of the various equipment and instruments in the syrup room. - Calibration of instruments. - Validation of communication (exchange of signals) with Krones. - Execution of modifications in the programming of the PLC and HMI. - Execution of CIP washing tests in tanks and pipes - Execution of passivation of tanks and pipes. - Execution of production tests with water. - Preparation and validation of finished syrup (first production). Show less

    • Albania
    • Food & Beverages
    • 1 - 100 Employee
    • Electronic Technician
      • Mar 2020 - Jul 2020

      Start-up of a syrup room, dissolver for the production of Coca Cola, Fanta, etc. and a CIP cleaning system. - I/O tests of the different equipment and instruments in the syrup room and CIP system. - Calibration of instruments. - Execution of modifications in the programming of the PLC and HMI. - Execution of CIP washing tests in the storage tanks and dissolver. - Execution of the passivation of the storage tanks and dissolver. - Execution of production tests with water. - Preparation and validation of finished syrup (first production). - Training to operators. Show less

    • Food & Beverages
    • 1 - 100 Employee
    • Electronic Technician Support
      • Oct 2019 - Feb 2020

      Start-up of a syrup room, pasteurizer, dissolver and sugar discharge and storage system in SILOS. Assembly and configuration of a new operator panel for the memory and control of sugar consumption. - I/O test of the different equipment and instruments in silos, dissolvers, pasteurizer and storage tanks. - Calibration of instruments. - Execution of modifications in the programming of the PLC and HMI. - Inverter configuration. - Validation of communication (exchange of signals) with Krones. - Mechanical intervention in the sugar discharge system (hoppers and silos) - Execution of CIP cleaning tests in each of the machines (dissolver, pasteurizer and storage tanks). - Preparation and validation of finished syrup (production). - Remote assistance. Show less

    • Panama
    • Food and Beverage Manufacturing
    • 700 & Above Employee
    • Electronic Technician Support
      • Apr 2019 - Jun 2019

      Start-up of a syrup room, tubular pasteurizer, plate pasteurizer and a CIP cleaning system. - I/O tests of the various equipment and instruments in the syrup room and CIP system. - Calibration of instruments. - Validation of communication (exchange of signals) with Sidel. - Execution of modifications in the programming of the PLC and HMI. - Execution of CIP washing tests in storage tanks and pasteurizers. - Execution of passivation of storage tanks and pasteurizers. - Execution of production tests with water. - Preparation and validation of finished syrup (first production). - Supervision and training of operators during production. Show less

    • Wholesale Building Materials
    • 1 - 100 Employee
    • Pasante en el Área de Mantenimiento
      • Dec 2017 - Mar 2018

      Levantamiento de los datos técnicos de todos los PLC’s y Variadores de velocidad de las principales líneas de producción (Tuberas LAC, LAF y Pintura). Elaboración de doce LOOP´s para el área de mantenimiento. Levantamiento de los datos técnicos de todos los PLC’s y Variadores de velocidad de las principales líneas de producción (Tuberas LAC, LAF y Pintura). Elaboración de doce LOOP´s para el área de mantenimiento.

Education

  • TECSUP
    Profesional, Electrónica y Automatización Industrial
    2016 - 2018
  • Asociacion Cultural Peruano Britanica (Britanico)
    Ingles Básico Completado

Community

You need to have a working account to view this content. Click here to join now