yilmaz uludag

Piping Supervisor at HICC - Heavy Industry Construction Co.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Adana, Turkey, TR
Languages
  • Türkçe Native or bilingual proficiency
  • İngilizce Professional working proficiency
  • rusia Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • VT - LEVEL 2
    PRVA ZVARACSKA AS
    Jul, 2022
    - Nov, 2024
  • VT-LEVEL-2
    PRVÁ ZVÁRAČSKÁ, a. s.
    Jul, 2022
    - Nov, 2024
  • VT-LEVEL-2
    prvá zváračská
    Jul, 2022
    - Nov, 2024

Experience

    • Construction
    • 1 - 100 Employee
    • Piping Supervisor
      • Sep 2022 - Present

      HICC Piping Supervisor HICC Piping Supervisor

    • Russian Federation
    • Construction
    • 100 - 200 Employee
    • Piping Süpervisor
      • Jun 2021 - Jul 2022

      Project: Irkutsk Oil Company Polymer Plant Project - Ust-Kut, Irkutsk/Russia Supervising 150.000 WDI piping prefabrication works. Project: Irkutsk Oil Company Polymer Plant Project - Ust-Kut, Irkutsk/Russia Supervising 150.000 WDI piping prefabrication works.

    • Türkiye
    • Construction
    • 700 & Above Employee
    • Piping Supervisor
      • Mar 2020 - May 2021

      Project: TEKFEN Prefabrication Shop - ADANA/TURKEY Eneva Parnaiba – Bottoming Cycle Module and pipe erection Works. Iraq Lanaz Bitumen Oil Refinary LANAZ NAPHTA COMPLEX PROJECT MODULE and pipe erection works. Project: TEKFEN Prefabrication Shop - ADANA/TURKEY Eneva Parnaiba – Bottoming Cycle Module and pipe erection Works. Iraq Lanaz Bitumen Oil Refinary LANAZ NAPHTA COMPLEX PROJECT MODULE and pipe erection works.

    • Türkiye
    • Construction
    • 700 & Above Employee
    • Piping Supervisor
      • Jan 2019 - Feb 2020

      RÖNESANS AMURSKY GAS PROCESSİNG PLANT Underground and aboveground pipipng works. RÖNESANS AMURSKY GAS PROCESSİNG PLANT Underground and aboveground pipipng works.

    • Construction
    • 100 - 200 Employee
    • Piping Supervisor
      • Dec 2016 - Oct 2018

      Piping Supervisor – Prokon LLC (Nobel Oil Affiliated Company) Project: Socar Ammonia and Urea Complex – Baku/Azerbaijan • Supervising Ammonia area 33.000 WDI and Urea area 40.000 WDI piping site erection works. • Supervising pipe supports erection Works. Piping Supervisor – Prokon LLC (Nobel Oil Affiliated Company) Project: Socar Ammonia and Urea Complex – Baku/Azerbaijan • Supervising Ammonia area 33.000 WDI and Urea area 40.000 WDI piping site erection works. • Supervising pipe supports erection Works.

    • Oil and Gas
    • 1 - 100 Employee
    • Piping Supervisor
      • Jul 2015 - Oct 2016

      • Supervising 1000 tons under ground piping prefabrication and piping site erection works. • Supervising 1300 tons above ground piping prefabrication and piping site erection works. • Supervising 1000 tons under ground piping prefabrication and piping site erection works. • Supervising 1300 tons above ground piping prefabrication and piping site erection works.

    • Piping Supervisor
      • Jul 2014 - Apr 2015

      ARTN VE HORN GLASS FACTORY MODERNISATION PROJECT Natural gas lines installation works. ARTN VE HORN GLASS FACTORY MODERNISATION PROJECT Natural gas lines installation works.

  • Ahmet Nihat Ozsan Insaat
    • Kocaeli, Türkiye
    • Piping Supervisor
      • Jun 2013 - Jan 2014

      Supervising 150 tons piping prefabrication and piping site erection works. Supervising 150 tons piping prefabrication and piping site erection works.

    • Piping Supervisor
      • Aug 2011 - Dec 2012

      Flare Area and Piperack 3 Area 10101 .10102 .10103 .10104. 10105.10106.10107.10108.10109 53101 .11307 (Dia:48 inc max) piping fabrication and erection works. Flare Area and Piperack 3 Area 10101 .10102 .10103 .10104. 10105.10106.10107.10108.10109 53101 .11307 (Dia:48 inc max) piping fabrication and erection works.

    • Türkiye
    • Industrial Machinery Manufacturing
    • 500 - 600 Employee
    • Piping Foreman/Supervisor
      • Jan 2007 - Apr 2010

      Piping supervisor, Underground and Aboveground piping Works for the Project prosess line 6 and 7. Slug Catcher, Inlet, Waste Water Treatement, Waste System, Utilities, Cooling Water/Sea Water System, Cooling water pumps, Sulphur storage Tanks and chemical tank area.Fire Water, Acid Line, LNG Line, LNG Liquid Line, Caustic Soda Line, Air Line, Process Water, Cold Condensate line, Steam Condensate Line, Chemical Contamined line fabrication and installation works. (Hastalloy, Carbon Steel… Show more Piping supervisor, Underground and Aboveground piping Works for the Project prosess line 6 and 7. Slug Catcher, Inlet, Waste Water Treatement, Waste System, Utilities, Cooling Water/Sea Water System, Cooling water pumps, Sulphur storage Tanks and chemical tank area.Fire Water, Acid Line, LNG Line, LNG Liquid Line, Caustic Soda Line, Air Line, Process Water, Cold Condensate line, Steam Condensate Line, Chemical Contamined line fabrication and installation works. (Hastalloy, Carbon Steel, Incoloy825, galvanised, stainless steel, jacketed pipes)

    • Piping Supervisor
      • Dec 2005 - Jan 2007

      3X38 MW Power Plant Mechanical Erection and piping Works, total 6 Boiler, Electrostatic Precipitator and Ash handling system, Line 3 Clinker installation capacity 400 ton. ANA ÜSTLENİCİ FİRMA ALSTOM POWER INC –ABD 6X380 MW SHOAIBA KUVVET SANTRALİ PROJESİ STAGE II FAZ 1¬¬-2 3-3 X380 MW kazan mekanik montaj ve borulama işleri toplam 6 adet kazan elektrostatik filtre ve kül boşaltma sistemlerinin montajı ekipman boru montaj ve boru imalat ve montaj AYRIYETEN QNCC ÇİMENTO… Show more 3X38 MW Power Plant Mechanical Erection and piping Works, total 6 Boiler, Electrostatic Precipitator and Ash handling system, Line 3 Clinker installation capacity 400 ton. ANA ÜSTLENİCİ FİRMA ALSTOM POWER INC –ABD 6X380 MW SHOAIBA KUVVET SANTRALİ PROJESİ STAGE II FAZ 1¬¬-2 3-3 X380 MW kazan mekanik montaj ve borulama işleri toplam 6 adet kazan elektrostatik filtre ve kül boşaltma sistemlerinin montajı ekipman boru montaj ve boru imalat ve montaj AYRIYETEN QNCC ÇİMENTO FABRİKASI 3. NOLU HAT .400 TON KAPASİTELİ KLİNKER KAPASİTESİ…..

    • Türkiye
    • Industrial Machinery Manufacturing
    • 500 - 600 Employee
    • piping foreman
      • Jun 2004 - Oct 2005

      ANA ÜSTLENİCİ : JGC JAPONYA ……GATE İNŞAAT TAAHHÜT SAN.VE TİC.AŞ 01.6.2004 01.10.2005 YENİ ÜNİTELERİN BENZİN .MOTORİN ..SÜLFÜR ..HİDROJEN ..YAPIMI VE ATYRAU RAFİNERİSİNİN MODRENİZE EDİLMESİ SÜLFÜR BÖLGESİNİN BORU MONTAJI YAPIMIN DA AYRİYETEN BORULAMA SONRA HİDROTEST YAPIMI KAZAKİSTAN ATROWA ANEPEZE ANA ÜSTLENİCİ : JGC JAPONYA ……GATE İNŞAAT TAAHHÜT SAN.VE TİC.AŞ 01.6.2004 01.10.2005 YENİ ÜNİTELERİN BENZİN .MOTORİN ..SÜLFÜR ..HİDROJEN ..YAPIMI VE ATYRAU RAFİNERİSİNİN MODRENİZE EDİLMESİ SÜLFÜR BÖLGESİNİN BORU MONTAJI YAPIMIN DA AYRİYETEN BORULAMA SONRA HİDROTEST YAPIMI KAZAKİSTAN ATROWA ANEPEZE

    • Construction
    • 1 - 100 Employee
    • Piping Supervisor
      • Jan 2003 - Mar 2004

      Stage A :POSOF-ERZURUM-PASINLER KARS Section Piping Fabrication and installation works. Stage A :POSOF-ERZURUM-PASINLER KARS Section Piping Fabrication and installation works.

    • Türkiye
    • Industrial Machinery Manufacturing
    • 500 - 600 Employee
    • piping and mechanical foreman
      • Oct 1998 - Dec 2002

      GAMA TÜRKMENİSTAN TÜRKMENBAŞI YAĞLAMA YAĞI ÜNİTE PROJESİ 26 Ay (Temmuz 1999 - Ağustos 2001 12 AY ÇALIŞMA İŞ BİTİMİ Türkmenbaşı rafinerisinin modernizasyonu kapsamında, 76.200 ton/yıl kapasiteli yeni bir yağlama yağı ünitesinin, GAMA ve Philipp Holzmann (Almanya) firmaları tarafından, ana yüklenici Technip (Almanya) firmasının taşeronu olarak anahtar teslimi yapımı. DEPOLAMA TANKI YANGIN SPRİNG HATLARI VE TANK BORULAMASI Türkmenbaşı rafinerisinin modernizasyonu kapsamında, 76.200 ton/yıl… Show more GAMA TÜRKMENİSTAN TÜRKMENBAŞI YAĞLAMA YAĞI ÜNİTE PROJESİ 26 Ay (Temmuz 1999 - Ağustos 2001 12 AY ÇALIŞMA İŞ BİTİMİ Türkmenbaşı rafinerisinin modernizasyonu kapsamında, 76.200 ton/yıl kapasiteli yeni bir yağlama yağı ünitesinin, GAMA ve Philipp Holzmann (Almanya) firmaları tarafından, ana yüklenici Technip (Almanya) firmasının taşeronu olarak anahtar teslimi yapımı. DEPOLAMA TANKI YANGIN SPRİNG HATLARI VE TANK BORULAMASI Türkmenbaşı rafinerisinin modernizasyonu kapsamında, 76.200 ton/yıl kapasiteli yeni bir yağlama yağı ünitesinin, GAMA ve Philipp Holzmann (Almanya) firmaları tarafından, ana yüklenici Technip (Almanya) firmasının taşeronu olarak anahtar teslimi yapımı. 2..] AYRIYETEN İKİNCİ PROJE DİZEL ÜNİTESİ TURKMENBAŞI RAFİNERİSİ MSCC TESİSİ TÜRKMENİSTAN PETROL VE DOĞAL GAZ SANAYİSİ İLE DOĞAL KAYNAKLAR BAKANLIĞI Show less GAMA TÜRKMENİSTAN TÜRKMENBAŞI YAĞLAMA YAĞI ÜNİTE PROJESİ 26 Ay (Temmuz 1999 - Ağustos 2001 12 AY ÇALIŞMA İŞ BİTİMİ Türkmenbaşı rafinerisinin modernizasyonu kapsamında, 76.200 ton/yıl kapasiteli yeni bir yağlama yağı ünitesinin, GAMA ve Philipp Holzmann (Almanya) firmaları tarafından, ana yüklenici Technip (Almanya) firmasının taşeronu olarak anahtar teslimi yapımı. DEPOLAMA TANKI YANGIN SPRİNG HATLARI VE TANK BORULAMASI Türkmenbaşı rafinerisinin modernizasyonu kapsamında, 76.200 ton/yıl… Show more GAMA TÜRKMENİSTAN TÜRKMENBAŞI YAĞLAMA YAĞI ÜNİTE PROJESİ 26 Ay (Temmuz 1999 - Ağustos 2001 12 AY ÇALIŞMA İŞ BİTİMİ Türkmenbaşı rafinerisinin modernizasyonu kapsamında, 76.200 ton/yıl kapasiteli yeni bir yağlama yağı ünitesinin, GAMA ve Philipp Holzmann (Almanya) firmaları tarafından, ana yüklenici Technip (Almanya) firmasının taşeronu olarak anahtar teslimi yapımı. DEPOLAMA TANKI YANGIN SPRİNG HATLARI VE TANK BORULAMASI Türkmenbaşı rafinerisinin modernizasyonu kapsamında, 76.200 ton/yıl kapasiteli yeni bir yağlama yağı ünitesinin, GAMA ve Philipp Holzmann (Almanya) firmaları tarafından, ana yüklenici Technip (Almanya) firmasının taşeronu olarak anahtar teslimi yapımı. 2..] AYRIYETEN İKİNCİ PROJE DİZEL ÜNİTESİ TURKMENBAŞI RAFİNERİSİ MSCC TESİSİ TÜRKMENİSTAN PETROL VE DOĞAL GAZ SANAYİSİ İLE DOĞAL KAYNAKLAR BAKANLIĞI Show less

Education

  • TUA TECHNİCAL UNİVERSİTY OF AMERİCA
    işletme
    2019 -
  • yeşilevler endustüri meslek lisesi
    Bilgisayar Sayısal Kontrollü (CNC) Torna Teknolojisi/CNC Tornacı
    1990 - 1994
  • TECHNİCAL UNİVERSİTY OF AMERİCA

Community

You need to have a working account to view this content. Click here to join now