Yerbol Oshmanov
Chief Executive Officer at Energy Services Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Energy Services Group
-
Kazakhstan
-
Oil and Gas
-
1 - 100 Employee
-
Chief Executive Officer
-
May 2020 - Present
• Develop dynamic business plans to reinvigorate operations • Identify areas of potential improvement, submitting a report of inefficiencies and strategies for betterment • Develop dynamic business plans to reinvigorate operations • Identify areas of potential improvement, submitting a report of inefficiencies and strategies for betterment
-
-
-
-
Founder
-
Oct 2016 - May 2019
• Negotiating with key customers (Tengizchevroil, Bonatti, CCEP, Sicim, Velesstroy); development of a product promotion strategy • Strategic development planning • Negotiate and approve contracts with manufacturers (UVEX, DeWalt, Geho, Yanmar, Wacker Neuson) Achievements • The company's annual turnover from zero to $ 2.3 million • Opened new showroom in Tengiz field • Hired a professional team of 25 people • Implemented of CRM and optimization of sales processes and customer service • Got an exclusive distributor certificate for above brands Show less
-
-
-
Well Flow International
-
United States
-
Oil and Gas
-
1 - 100 Employee
-
Technical Sales Engineer; Senior Operations Engineer
-
Jan 2015 - Sep 2016
- Professional Business Development through direct contact with the Customer Engineering department - Technical support on product development, design, testing and deployment - Provide technical expertise and solutions to the customers - Negotiating tender and contract terms and conditions to meet both client and company needs - Analyzing company costs and sales - Working knowledge of Customer Relationship Management (CRM) system - Sales in Well Bore Clean Out Tools and Chemicals - Sales in Production and Completion Fluids Filtration - Development of training programs for employees for existing and new tools and services that company brings to the market - Provide Packer run in hole and Operation Procedure to Drilling Engineers to prepare programs - Preparing and Operating Inflow Test Packers, Retrievable Test Packers, training personnel how to operate tools during operations at well site. Show less
-
-
-
Schlumberger
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Cementing Field Specialist I, II
-
May 2013 - Jan 2015
- Full Control of Cementing Operations (Surface, Intermediate, Production Casing, Liner jobs, Plug Abandon, Cement Squeeze) - Sacrificial tubing plug job - Work with HAL LAS (Liquid Additive System) - Work with Deep Sea Express Cement Head - Prepare Cementing job electronic data acquisition on well site with special software (Cemwin, Halwin and Opticem real time). - Full Control of Cementing Operations (Surface, Intermediate, Production Casing, Liner jobs, Plug Abandon, Cement Squeeze) - Sacrificial tubing plug job - Work with HAL LAS (Liquid Additive System) - Work with Deep Sea Express Cement Head - Prepare Cementing job electronic data acquisition on well site with special software (Cemwin, Halwin and Opticem real time).
-
-
-
Halliburton
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Cementing Service Operator, Assistant Operator
-
May 2007 - May 2013
- Full Control of Cementing Operations (Surface, Intermediate, Production Casing, Liner jobs, Cement Squeeze) - Calculating required cement additive chemicals - Set RTTS packer with Storm Valve on EPC-2 project - Supervise and lead crew when perform cutting and blending cement on location - Maintenance Units, (Pump packing HT-400,centrifugal 4 X 4 and 6 X 5, redress cementing head/plug container, all iron and lo-torch valve, 660 bulk tank and V-Tank), on location and Halliburton yard - Formation Integrity Test, Leak off test - Daily Activity Reports to Service Coordinator. All reports show up actual amount of cement, chemicals, equipment and casing accessories on location - Pumping jobs, BOP high pressure test, maximum 15 000 PSI - Participating in well testing and completion. Working with Coil Tubing Tower, Well Perforating, Slick line and in Acid jobs - Preparing post-job reports - Keep all equipment and chemicals in stock up to date - Preparing and Service Cement Unit for Cement job - Preparing HP (high pressure) iron for locations in Test Cell. Working with high pressure test, maximum 15 000 PSI. Show less
-
-
Education
-
East Kazakhstan Government Technical University, Ust-Kamenogorsk, KZ Speciality
Bachelor’s Degree, Petroleum Geologist -
Semey Geological Prospecting College, Semey, KZ
College Diploma, Technology and Technique of prospecting mineral Deposits