Ye Bill
Program Manager at Neuron Mobility- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Limited working proficiency
Topline Score
Bio
Experience
-
Neuron Mobility
-
Singapore
-
IT Services and IT Consulting
-
100 - 200 Employee
-
Program Manager
-
Mar 2022 - Present
-
-
-
-
Thecnico Supervisor
-
Jul 2020 - Present
Lithium Battery diaphragm raw film produce, diaphragm ceramic layer coating, final productions slit and package. Working as a technic supervisor to improve process flow and manufacture technology. Improve gain rate and yield. Lithium Battery diaphragm raw film produce, diaphragm ceramic layer coating, final productions slit and package. Working as a technic supervisor to improve process flow and manufacture technology. Improve gain rate and yield.
-
-
-
-
Project Manager
-
Jun 2018 - Jul 2020
Projects commercial negotiate, projects plan, projects raw materials collection and shoot, final video cut and edit. Projects commercial negotiate, projects plan, projects raw materials collection and shoot, final video cut and edit.
-
-
-
蓝思科技有限公司
-
1 - 100 Employee
-
Senior Project Manager
-
Oct 2017 - Jun 2018
Watch and Touch bar top module project management Watch and Touch bar top module project management
-
-
-
O-Film Technology
-
China
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Manager
-
Sep 2016 - Oct 2017
> A production(Phone、Pad、Watch) touch panel module New Production Introduce. New equipment research and develop. Touch panel module process flow design and optimize. Touch panel module fixture/material estimate and verify. Trial run(EVT DVT PVT) issue analysis and address major defect that are impacting process yield at most, and MP yield improve.> Quality system documents establish and write; > A production(Phone、Pad、Watch) touch panel module New Production Introduce. New equipment research and develop. Touch panel module process flow design and optimize. Touch panel module fixture/material estimate and verify. Trial run(EVT DVT PVT) issue analysis and address major defect that are impacting process yield at most, and MP yield improve.> Quality system documents establish and write;
-
-
-
-
NPI Manager
-
Jun 2008 - Sep 2016
> PE engineer, NPI engineer/ Supervisor/deputy manager.> A production(Phone, Pad) touch panel module New Production Introduce.> Co-work with customer engineer and hold the new project schedule: New production manufacture process design and improve; Process parameter DOE; Material and component specification define and verify introduction; Process jig and fixture design and verify; Quality system documents establish and write; Trial run and daily failure analysis and address major defect that are impacting process yield at most.
-
-
-
-
Engineer
-
Feb 2006 - Feb 2008
Filed Management,Process Management:TN, STN, FSTN, C-STN LCD manufacture process management, defect analysis, process and yield improvement;Work on cell cut, liquid crystal fill, cell clean and polarize attachment;Daily failure analysis and address major defect that are impacting process yield at most;Process design and process cost down. Filed Management,Process Management:TN, STN, FSTN, C-STN LCD manufacture process management, defect analysis, process and yield improvement;Work on cell cut, liquid crystal fill, cell clean and polarize attachment;Daily failure analysis and address major defect that are impacting process yield at most;Process design and process cost down.
-
-
Education
-
EF Executive Language Institute
NA, English -
Center South Forest University
Bachelor of Engineering (B.Eng.), Chemical Engineering