Yasin Feyzullayev
Lead Survey Engineer at PROKON LLC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
PROKON LLC
-
Construction
-
100 - 200 Employee
-
Lead Survey Engineer
-
Nov 2018 - Present
-
-
Surveyor/Dimension Control
-
Jul 2016 - Oct 2018
Supervision of the excavation works Supervision for pouring concreteSupervision over the installation of columns and anchor boltsSupervision the installation of metal structuresSupervision over the installation of the equipmentInstalling underground and aboveground pipelineAll activities have been done as per project requirementsProject requirements international codes and standards
-
-
-
ASTEXNOSERVIS LLC
-
Azerbaijan
-
Construction
-
1 - 100 Employee
-
Surveyor
-
Jun 2015 - Jul 2016
Supervision of the excavation works Supervision for pouring concrete Supervision over the installation of columns and anchor bolts Supervision the installation of metal structures Supervision over the installation of the equipment Installing underground and aboveground pipeline All activities have been done as per project requirements Project requirements international codes and standards Supervision of the excavation works Supervision for pouring concrete Supervision over the installation of columns and anchor bolts Supervision the installation of metal structures Supervision over the installation of the equipment Installing underground and aboveground pipeline All activities have been done as per project requirements Project requirements international codes and standards
-
-
-
-
Surveyor
-
May 2013 - Dec 2015
Supervision of the excavation works Supervision of the backfilling works Supervision of the subbase, base and asphalt Installing underground pipeline and drainage system All activities have been done as per project requirements Project requirements international codes and standards Supervision of the excavation works Supervision of the backfilling works Supervision of the subbase, base and asphalt Installing underground pipeline and drainage system All activities have been done as per project requirements Project requirements international codes and standards
-
-
-
-
Surveyor
-
Sep 2012 - Mar 2013
To measure city streets, to draw up location scheme Implementation of given project Supervision of excavation work Implementation of land work in the construction of wastewater systems and pump houses To measure city streets, to draw up location scheme Implementation of given project Supervision of excavation work Implementation of land work in the construction of wastewater systems and pump houses
-
-
-
Azvirt, Project of Gabala Airport
-
Gabala, Azerbaijan
-
Surveyor/Instrument Operator
-
Jun 2012 - Sep 2012
Supervision of the excavation works Supervision of the backfilling works Supervision of the subbase, base and asphalt Installing underground pipeline and drainage system All activities have been done as per project requirements Project requirements international codes and standards Supervision of the excavation works Supervision of the backfilling works Supervision of the subbase, base and asphalt Installing underground pipeline and drainage system All activities have been done as per project requirements Project requirements international codes and standards
-
-
Education
-
Azerbaijan State Oil Academy
Bachelor's degree, Technology of Information and Calculation