Xavier Le Hénaff
Project Control Director at Renouveau La Fontaine- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
French Native or bilingual proficiency
-
English Native or bilingual proficiency
-
Spanish Limited working proficiency
Topline Score
Bio
Experience
-
Renouveau La Fontaine
-
Canada
-
Construction
-
1 - 100 Employee
-
Project Control Director
-
Jul 2020 - Present
-
-
-
Dodin Québec
-
Canada
-
Civil Engineering
-
1 - 100 Employee
-
Senior Project Manager
-
Feb 2019 - Present
-
-
-
QDVC (Q.S.C)
-
Qatar
-
Construction
-
700 & Above Employee
-
Design Manager
-
Apr 2018 - Nov 2018
Military Air Base Development Project-Project organization and preparation-Stakeholder and client (Qatar Armed Forces) coordination and interfacing-Client requirements identification and management within contractual constraints-Manage and coordinate development of concept and preliminary designs-Supervise master planning of the development
-
-
External Interface Manager
-
Nov 2016 - Apr 2018
Lusail Light Rail Transit (LRT) Project:Turn-key light rail network integrated into Lusail City as major transportation system consisting of 30 stations with underground and at grade sectionsBudget (Current phase): 2.2Billion Euros-Identify and supervise external interfaces resolution-Ensure compliance of interfaces with project needs and contract-Communicate with Client on various issues to ensure timely resolution-Coordinate design with authorities-Manage interfacing needs of consortium partners/Sub-projects Show less
-
-
Technical Manager
-
Jul 2015 - Nov 2016
Lusail CP01C123 Project:3 distinct road sections totaling 2.4km with utilities and landscaping in urban setting of Lusail City Budget: 400Million QAR-Managing and supervising production of technical deliverables (Methods, Shop Drawings, Design Drawings, Material Selections, Testing&Commissioning procedures, As-built Documentation)-Organization of Technical Department procedures and work methods-Preparation of project procedures-Managing team of 10+ Engineers & 17+ Draftmans (Interviews, selection, demobilization, work-Coordination and interface management with external parties-Attendance to client progress and contract meetings-Definition of scope, tendering, selection and managing of design consultant-Supervise implementation of BIM-Preparation of Contractual claim letters-Preparation of Variation Orders-Participation in subcontractor selection Show less
-
-
Technical Office Manager
-
Jan 2014 - Jul 2015
Lusail Underground Car Parks Project:4 underground parking totaling 2200 parking spots (60m x 250m on 3 U/G levels)Budget: 1.5Billion QAR-Managing and supervising production of technical deliverables (Methods, Shop Drawings, Design Drawings, Material Selections, As-Built Documentation) - Landscaping, roadworks, utilities-Managing team of 3+ Engineers & 7+ Draftmans-Coordination and interface management with external parties-Attendance to client progress meetings-Preparation of Contractual claim letters & Variation Orders-Subcontractor selection & management-Supervising procurement of particular project materials (Tendering, selection, follow-up) Show less
-
-
Technical Engineer
-
Jul 2013 - Dec 2013
Lusail Underground Car Parks Project:4 underground parking totaling 2200 parking spots (60m x 250m on 3 U/G levels)Budget: 1.5Billion QAR-Preparation of Technical Deliverables (Methods, Shop Drawings, Design Drawings, Material Selections, As-Built Documentation)-Structural Steel Subcontractor management-Waterproofing Subcontractor management-Participation in subcontractor selection-Procurement of various materials (Tender, comparison, selection, follow-up)-Site coordination support-Coordination with Client and other parties-Structural designer and checking engineer coordination Show less
-
-
-
QDVC (Q.S.C)
-
Qatar
-
Construction
-
700 & Above Employee
-
Technical Engineer Trainee
-
May 2012 - Sep 2012
Lusail Underground Car Parks Project: 4 underground parking totaling 2200 parking spots (60m x 250m on 3 U/G levels) Budget: 1.5Billion QAR Assignments: -Coordinate Civil works design between site and designer -Coordinate between Designer and Checking Engineer -Preparation of Material Selection documents and Construction Method Statements -Participation in tendering for landscaping works -Structural Steel Subcontractor management Lusail Underground Car Parks Project: 4 underground parking totaling 2200 parking spots (60m x 250m on 3 U/G levels) Budget: 1.5Billion QAR Assignments: -Coordinate Civil works design between site and designer -Coordinate between Designer and Checking Engineer -Preparation of Material Selection documents and Construction Method Statements -Participation in tendering for landscaping works -Structural Steel Subcontractor management
-
-
-
QDVC (Q.S.C)
-
Qatar
-
Construction
-
700 & Above Employee
-
Site Engineer Trainee
-
May 2010 - Sep 2010
Lusail Underground Car Parks Project: 4 underground parking totaling 2200 parking spots (60m x 250m on 3 U/G levels) Budget: 1.5Billion QAR Assignments: -Management of floor coating subcontractor (120000 m2 surface) -Progress Reporting -Site coordination with other trades Lusail Underground Car Parks Project: 4 underground parking totaling 2200 parking spots (60m x 250m on 3 U/G levels) Budget: 1.5Billion QAR Assignments: -Management of floor coating subcontractor (120000 m2 surface) -Progress Reporting -Site coordination with other trades
-
-
Education
-
McGill University
Master of Engineering - MEng, Civil Engineering -
McGill University
Bachelor of Engineering - BE, Civil Engineering