WASIM RAYYES
Construction Manager at 中国铁建国际集团- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
Arabic -
Topline Score
Bio
Usama Bilal Ahmad
Mr wasim Is the one of best manager. He has very good skills to manage the work and very good knowledge about modern engineering works. He always has good control on site. He always have good mind to control site troubles and technical issues.
Hasan Aljurf
Mr wassim one of the best bridges and structures engineer work with me . organized ,excellent follower ,hard working member all the best wishes for him and success
Usama Bilal Ahmad
Mr wasim Is the one of best manager. He has very good skills to manage the work and very good knowledge about modern engineering works. He always has good control on site. He always have good mind to control site troubles and technical issues.
Hasan Aljurf
Mr wassim one of the best bridges and structures engineer work with me . organized ,excellent follower ,hard working member all the best wishes for him and success
Usama Bilal Ahmad
Mr wasim Is the one of best manager. He has very good skills to manage the work and very good knowledge about modern engineering works. He always has good control on site. He always have good mind to control site troubles and technical issues.
Hasan Aljurf
Mr wassim one of the best bridges and structures engineer work with me . organized ,excellent follower ,hard working member all the best wishes for him and success
Usama Bilal Ahmad
Mr wasim Is the one of best manager. He has very good skills to manage the work and very good knowledge about modern engineering works. He always has good control on site. He always have good mind to control site troubles and technical issues.
Hasan Aljurf
Mr wassim one of the best bridges and structures engineer work with me . organized ,excellent follower ,hard working member all the best wishes for him and success
0
/5.0 / Based on 0 ratingsFilter reviews by:
Credentials
-
Advanced Primavera P6
LinkedInJun, 2020- Sep, 2024 -
Introduction to LEED Credentialing
LinkedInApr, 2020- Sep, 2024 -
PMP® Certification Training Course
Project Management InstituteJan, 2019- Sep, 2024 -
International General Certificate in Occupational Health and Safety
NEBOSHApr, 2018- Sep, 2024 -
Hazard Recognition
NEBOSHJul, 2017- Sep, 2024 -
Incident Investigation
NEBOSHJul, 2017- Sep, 2024 -
OSHA 1926 Construction Industry
OSHA Safety Training InstituteJul, 2017- Sep, 2024 -
Safety Management & leader ship
NEBOSHJul, 2017- Sep, 2024 -
Quality Management
Project Management InstituteSep, 2014- Sep, 2024 -
Value Engineering
Project Management InstituteMar, 2014- Sep, 2024 -
Supervisor Specific Safety
OSHA Safety Training InstituteFeb, 2013- Sep, 2024 -
Motivation
Consolidated Contractors International CompanyDec, 2007- Sep, 2024 -
Business Performance Improvement Workshop
USAIDJan, 2006- Sep, 2024 -
AutoCAD
IUGJul, 2004- Sep, 2024 -
STAAD Pro
IUGJan, 2004- Sep, 2024 -
Project Management Professional (PMP)®
Project Management InstituteAug, 2020- Sep, 2024 -
LEED Green Associate
U.S. Green Building CouncilOct, 2020- Sep, 2024
Experience
-
中国铁建国际集团
-
China
-
Construction
-
200 - 300 Employee
-
Construction Manager
-
Dec 2020 - Present
-
-
-
-
Construction Manager
-
Apr 2019 - Present
-
-
Zone Manager
-
Apr 2017 - Dec 2020
MALL OF OMAN – MAJID AL FUTTAIM PROPERTIES• Working as a Zone Manager for the construction of the Main Building No. 02 & 04• a zone manager for North car park and loading bays• Steel structure for leisure Box• Finishing works (Blocks, Tiles, Drywalls, epoxy coating, ceiling, Paint …)• Some External works ( Retaining wall- stormwater channels, sewage pump station, ....)
-
-
Senior Project Engineer
-
Aug 2016 - Apr 2017
Dualization of Adam – Thumrait Road, Part-2 (ATD Project)• Construction of 120 km main road as new two-lane.• Construction of 7 no. Grade separated interchanges, one Bridge & six Dumb-bell Interchanges• Construction of 50 no. reinforced concrete Box culverts and 144 no. pipe culverts.• Construction of 16 no. lay bay area, 22 no. ROP parking & 4 no. connections to the future rest areas.
-
-
Section Engineer
-
Sep 2013 - Oct 2016
UPGRADING OF FALAJ QABAEL ROUND ABOUT – SOHAR- OMAN• Construction of 480m Flyover Bridge above the existing Roundabout. • Construction of 1386 km of Retaining Wall and 11,410 m2 Mechanically Stabilized Earth Wall MSE• Construction of infrastructures (Pipe Culvert – Box culvert – Drainage, Ducts, etc...)• Electrical network (Substations, 33 and 11 kva lines, street lighting, etc….).• Telecommunication network (Laying of New Oman tell FOC and GTO cables).• Protection and relocation of all existing utilities in compliance with the requirements of the authorities/ owners.• Installation of roadside furniture (traffic signs, pavement marking, etc.) and protection work on embankment slopes. Show less
-
-
Section Engineer
-
Sep 2009 - Sep 2013
DEVELOPMENT OF MUSCAT INTERNATIONAL AIRPORT - MUSCATProject Scope: The works comprise the construction of the new runway and taxiway system, apron, power centers, utilities, landside and airside roads, landscaping &upgrade of the existing facilities.Responsible for: (Aug 2012 – Sep 2013)• Construction of the stormwater system and fuel separators for the airport, with 25,000m3 of riprap protection.• Construction of 29 no. of bridge houses fully equipped with services such as (water - electricity - fuel - sewage, etc…) and to connect the aircraft to the terminal building.• Construction of 1200m of retaining walls. (Jan 2011 – Aug 2012)• Production and transport of 5,000,000 m3 of crushed stone material to project plants (asphalt/concrete/stabilizer), and 8,000,000 m3 of rock fill material to the site. (Sep 2009 – Jan 2011)• Construction of 200 m flyover box Girder Bridge with all furniture at Sultan Qaboos Street. Show less
-
-
Site Engineer
-
Jun 2005 - Sep 2009
DUELAIZATION OF SOHAR BURAIMI ROAD - SOHARProject Cost: 140 Million US dollars.Project Scope: Expansion and construction of 81.4 Km asphalted road, construction of 18 bridges, two underpasses along with necessary drainage structure, road protection, relocation of existing services, installing street lighting and road furniture.Responsible for:• Construction of 6 No. of precast girder bridges with all furniture.• Construction of the stormwater system along 40km of road with its riprap protection.• Construction of the road infrastructures along 40km of road.• Finishing work (Guard Rail, road stud, road marking, Barriers, signboard, reflectors… etc). Show less
-
-
Trainee
-
Feb 2005 - Mar 2006
DESIGN AND BUILD OF BASKET BALL STADIUM-Palestine
-
-
-
UNRWA
-
Jordan
-
Non-profit Organizations
-
700 & Above Employee
-
Trainee
-
Jan 2003 - Sep 2004
-
-
Education
-
The International Business Academy of Switzerland
Master of Business Administration - MBA, Business Administration and Management, General -
IUG - Palestine
Bachelor of Engineering (B.E.), Civil Engineering -
Alkarmel
General Studies, 94.1%