Wan Iskandar

Assistant Manager, Trackworks & Civil Infrastructure at DMIA GROUP
  • Claim this Profile
Contact Information
Location
Petaling Jaya, Selangor, Malaysia, MY
Languages
  • English -
  • Malay -

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Malaysia
    • Construction
    • 1 - 100 Employee
    • Assistant Manager, Trackworks & Civil Infrastructure
      • Jun 2023 - Present

    • Senior Engineer, Trackworks & Civil Infrastructure
      • May 2020 - Jun 2023

      Main Contractor for KTM Railway Upgrading Project Phase 2 - KVDT2 (RM 4.47 billion)Responsible for design & construction aspects of the KTM Klang Valley Double Track Phase 2 (KVDT2) rehabilitation project for Sector 1: Salak Selatan to Seremban (70km) & Sector 2: SPK to Port Klang (40km) and ensure delivery of design, drawings, and documents on time.

    • Engineer, Trackworks & Civil Infrastructure
      • Jan 2016 - May 2020

      Main Contractor for KTM Railway Upgrading Project Phase 1 - KVDT1 (MYR 1.41 billion)Responsible for design aspects of the KTM Klang Valley Double Track Phase 1 (KVDT1) rehabilitation project from Rawang to Salak Selatan and ensure delivery of design, drawings and documents on time.Attend to track alignment and geometry design issues to ensure compliance with Permanent Way Manual and satisfy all departments (Track, Electrification, Signalling & Operation).Attend to geotechnical and drainage issues for mainline track, stations, slope, and culvert. Tracking of design change requests and their associated costs during the project phase.Prepare submission for block section including site possession, application for line block & isolation, Request for Inspection (RFI) and Method Statement / Inspection Test Plan for all track and infrastructure field works.Support track (sleepers/rail/fastener) QA/QC procedure to ensure all the materials quality meet the requirements.Experienced in developing Bills of Quantities and material take-off.Experienced in full tender process.Excel in contracts, commercial & procurement works: Preparation of PO, WO, RO, LOI/LOA, IPC and relevant claim matters.Liaison experience with KTMB, DBKL, JPS and other state council and authorities.Experienced in interfacing between various departments (Track, Infra, Electrification, Signalling, Stations, Safety, Operation) and client-contractor-consultant liaison to solve technical issues. Show less

    • Geotechnical Engineer
      • Jun 2014 - Jan 2016

      Responsibilities: Executes nearshore and offshore soil investigation campaign and monitors project progress as per Project Execution Plan. Clients include PETRONAS, SHELL, ExxonMobil and Talisman. Acts as the company representative on-board and liaise with clients on-board regarding arising matter at offshore. Controls the quality of the result by monitoring the handling of raw geotechnical sample and overseeing the execution of laboratory tests and engineering analysis. Able to perform shear strength tests such as Torvane, Miniature Vane, Pocket Penetrometer, Unconsolidated Undrained (UU) Triaxial Test and In Situ Vane Shear Test. Perform design of jack-up leg penetration analyses (LPA) and compute axial pile capacity, lateral resistance (P-Y) and load deformation (Q-Z and T-Z) data, and pile drivability studies to estimate soil resistance during driving (SRD) with set up due to delays in driving (1.0 and 1.5) using GRLWEAP simulation Accomplishments: Successfully completed more than 5 offshore soil investigation campaign projects in Asia Pacific region without any incidents. Skills: Able to analyze and process raw data and figures and form critical engineering judgment in real-time situation (such as determine the exact soil type based on CPT field graph and Robertson Chart) under pressure and time constraint. As a result, able to work and think twice as fast. Show less

    • Trainee (Industrial Training)
      • Oct 2012 - Apr 2013

      I was attached primarily to the Asset Risk Management Section and Inspection & Verification Section for 7 months. My involvement includes exposure to Risk-Based Inspection (RBI) Assessment and Corrosion Management Plan (CMP) for Pipelines and working closely with the engineers, assisting them in engagement with clients and contributing to project progress using DNV standard codes and software. I was attached primarily to the Asset Risk Management Section and Inspection & Verification Section for 7 months. My involvement includes exposure to Risk-Based Inspection (RBI) Assessment and Corrosion Management Plan (CMP) for Pipelines and working closely with the engineers, assisting them in engagement with clients and contributing to project progress using DNV standard codes and software.

Education

  • Universiti Teknologi Petronas
    Bachelor of Engineering (Hons.), Civil Engineering
    2009 - 2013
  • Malacca High School
    SPM, Science Stream
    2004 - 2008

Community

You need to have a working account to view this content. Click here to join now