Win Htun Lin

Senior Network Planning Manager at Campana Group
  • Claim this Profile
Contact Information
Location
Myanmar, MM
Languages
  • English -
  • Myanmar Native or bilingual proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Singapore
    • Telecommunications
    • 1 - 100 Employee
    • Senior Network Planning Manager
      • Jan 2021 - Present

      - Metro and FTTH network design, planning and budget preparation for 31 townships of Yangon region and Bago city- Fiber and FTTH network design, planning and budget preparation for Stat City, City Loft, Star Villa, Sky Villa, Kandawgyi housing, Myanmar Plaza, Winsar Condo, MyayNu Condo, Nura Building, Innwa Housing, Y Complex, etc.- Fiber and Wi-Fi network design, planning and budget preparation for CMHL nationwide project, MAB bank nationwide project, Denko nationwide project and CB bank nationwide project.- Design, planning and budget preparation for Amara eNode backhaul replacement by FTTH networkCurrent Occupation- Direct reporting to CTO.- Last mile, FTTH & Wi-Fi Network Design and BoQ checking which are submitted from Team Members- Leading, Guiding and training to Team member to understand requirement of Management and Sale and to develop technical knowledge - Design and planning of Wi-Fi network, metro and FTTH network- BoQ and Budget calculation for Wi-Fi and fiber network project- Fiber related material and OLT, ONU testing and new product testing- Back end technical support for Field Team and Service Delivery Team- Fiber core detailing related with customer, existing network and expansion network with Auto CAD- KMZ and Technical document control and updating- Sale support- Preparing Scope of work and negotiation and checking of quotation from subcontractor based on project

    • Network Planning Manager
      • Apr 2019 - Jan 2020

      - Yangon University, Dagon University, Yangon Night Market and Victoria Hospital Wi-Fi projects- Installation and configuration of ZTE ZXA10 C320 for 16 Pop sites- Design and planning of fiber network to extend FTTH network by using Wi-Fi metro fiber network for Dagon Township, Sanchaung Township, Kamaryut Township and Hlaing Township- HTI and Campana fiber network integration project - Yangon University, Dagon University, Yangon Night Market and Victoria Hospital Wi-Fi projects- Installation and configuration of ZTE ZXA10 C320 for 16 Pop sites- Design and planning of fiber network to extend FTTH network by using Wi-Fi metro fiber network for Dagon Township, Sanchaung Township, Kamaryut Township and Hlaing Township- HTI and Campana fiber network integration project

    • Chief Engineer
      • Jan 2017 - Apr 2019

      -Carrier Grade Outdoor Wi-Fi network design and network installation at Dagon Township, Sanchaung Townsip, Kamaryut Township, Hlaing Township, Mingalar Taung Nyunt Township, Min Ma Naing Housing-Carrier Grade indoor Wi-Fi design and planning for The One Entertainment Park, Dagon center I&II, Kabar Aye Gamone Pwint shopping mall, SanYeikNyein Gamone Pwint shopping mall, Parami SeinGayHar shopping mall, HlaingTaryar SeinGayHar shopping mall, Thuwanna Stadium wifi project for One Championship, Thuwanna Stadium wifi project for World Lethwei Championship, Grand SayarSan Condo

    • Engineering Manager
      • Feb 2015 - Jan 2017

      Design and Planning of Carrier Grade Wi-Fi project.Planning Wi-Fi project to cover Yangon area and create and design the access fiber network design. Planning for Carrier grade Wi-Fi database with ARC GIS software,Planning for Operation and maintenances CDMA (800MHz) Radio Stations preparation and deploying phases.Identifying, managing project’s risky situationsManaging, Coaching and Developing project team meamberCo-operate Engineers to catch up successful completion of projects and create good working environment.Trained Engineers to understand and operate the courses of operation and maintenance.- Optical Fiber installation course and Fiber splicing course- Measuring and tracing fiber losses with OTDR

    • Myanmar
    • Telecommunications
    • 1 - 100 Employee
    • Deupty Engineering Manager
      • Mar 2014 - Feb 2015

      My responsibility is to lead and train the team to understand CDMA(800MHz), GSM and WCDMA of Base Transceiver Station(BTS). And Also Microwave and Optical Fiber transmission system and Rectifier system. Planning and operating the operating and maintenance of BTS and GEN set. My responsibility is to lead and train the team to understand CDMA(800MHz), GSM and WCDMA of Base Transceiver Station(BTS). And Also Microwave and Optical Fiber transmission system and Rectifier system. Planning and operating the operating and maintenance of BTS and GEN set.

    • Telecommunications Engineer
      • Jun 2008 - Feb 2014

      Responsibility : Maintained UTMS, GSM and CDMA Radio Stations and Public Switch Telephone network (PSTM) : Installation of CDMA Base Transceiver System (BTS) in Nant Mon, Inndawgyi, Kachin State : Installation of CDMA Repeater in Hopin, Kachin State : Installation of GSM BTS in Hopin, Kachin State : Installation of GSM BTS in Takwin, Kachin State : sold GSM and CDMA SIM cards : Operation and maintenance of BTS : Backbone network of Microwave and Fiber, SDH/ PDH/ ATM/ IP

    • 1 - 100 Employee
    • Fabrication and Design Engineer
      • Mar 2006 - Apr 2008

      Responsibility : Have been Drafting, detailing and producing shop drawing of steel structure using with TEKLA Steel Strucutre software : Have been Drafting Building designs with AUTO CAD (2D/3D) Projects Titles were East Monastery, Damatiyi Monastery,Yadanamanaung Monastery and other buildings. : Designation and Making of carbon steel and stainless steel such as Handrail, Baulster. Fence and Main Entrance doors, steel roof trusses and so on which were most of my Drafting and designating Buildings. : Designed the projects which were producing of the energy form the Rice Hull and Hydro.These projects were to distribute electrical energy the whole villages. I also member of the team which was to be lighted the villages.

Education

  • Myitkyina Technology University
    Bachelor's degree, Mechatronics, Robotics, and Automation Engineering
    2001 - 2006

Community

You need to have a working account to view this content. Click here to join now