William Hughey

Shift Supervisor/Lead Person at Progress Container & Display
  • Claim this Profile
Contact Information
Location
Atlanta Metropolitan Area

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United States
    • Packaging and Containers Manufacturing
    • 1 - 100 Employee
    • Shift Supervisor/Lead Person
      • Jan 2003 - Mar 2016

      635 Patric Mill Rd. Winder, Ga. • Managed 2nd shift production department for 13 years without any accidents. • Operated the forklift for production department and handled shipping department along with my supervisor and quality check duties. • Recognized team members strengths and weaknesses to build teams. • Coached team members to continuously focus on safety, quality, productivity, cost, training and morale to achieve positive results in all areas. • Repaired most of machine breakdowns instead of calling… Show more • Managed 2nd shift production department for 13 years without any accidents. • Operated the forklift for production department and handled shipping department along with my supervisor and quality check duties. • Recognized team members strengths and weaknesses to build teams. • Coached team members to continuously focus on safety, quality, productivity, cost, training and morale to achieve positive results in all areas. • Repaired most of machine breakdowns instead of calling one of the maintenance men back in, reducing down-time. • Ensured effective employee relations and provided coaching and development. • Mixed ink in the ink kitchen whenever needed. Show less

    • Accu-Fold Operator/Lead Person
      • Dec 2001 - Jan 2003

      Industrial Blvd. Conyers, Ga. Plant Manager left and went to Progress Container then called me and asked if I would come run second shift for him.

    • United States
    • 1 - 100 Employee
    • Flexo Operator/Quality Inspector
      • Apr 1990 - Dec 2001

      Chupp Rd. Lithonia, Ga. A leader in production, safety and quality while there. Worked with Maintenance Manager to design a folder/gluer section for the Jumbo Flexo.

    • Drywall Jouneyman
      • Jul 1989 - Apr 1990

      Riverdale, Ga. Installed Acoustical Ceilings

    • United States
    • Paper and Forest Product Manufacturing
    • 700 & Above Employee
    • Flexo Operator
      • Nov 1979 - Jul 1989

      Hudson Bridge Rd. Stockbridge, Ga. I was trained on Flexos and Rotary Die Cutters

Education

  • North Clayton Senior High
    High School, General Studies
    1971 - 1976

Community

You need to have a working account to view this content. Click here to join now