Will Kollet
General Superintendent/ Project Manager at Greenberry Industrial- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Tagalog -
Topline Score
Bio
Experience
-
Greenberry Industrial
-
United States
-
Construction
-
100 - 200 Employee
-
General Superintendent/ Project Manager
-
Sep 2015 - Present
-
-
-
Matrix Service
-
United States
-
Construction
-
300 - 400 Employee
-
Project Manager
-
Aug 2006 - Aug 2015
Currently performing estimating and scheduling as well as, oversight and coordination of sub-contractors, material procurement/ submittals and direct customer relations in the successful completion of numerous projects at oil and gas facilities in the state of California, Production Islands off the coast of California and the state of Hawaii. All piping and appurtenances installed utilizing API 570, 1104 and ASME B31.3 welding codes as quality control criteria. Performed direct oversight of workforce, subcontractors, and systems commissioning in the successful and timely completion of critical outage work due to facilities need to reestablish fuel distribution.Coordinate complex rigging during installation of new vessels, as well as pumps and large bore heavy wall and concrete lined piping.Plan and coordinate all logistical needs for subcontractors, vendors, and material shipments when performing offshore. Perform Civil oversight and critical concrete pour planning.
-
-
-
-
Small Business Owner
-
Jan 2003 - Aug 2006
Performed project estimating, scheduling, material submittals, contract negotiations and project oversight at numerous government projects throughout Hawaii and the country of Japan. All trades of construction were utilized in the successful completion of projects. Major areas of expertise included; critical welding, pipeline construction/ repair, tank repair, and handling of all fuel both from environmental and hot work safety standpoints. Well versed in API 570, 650/653 codes and regulations. Performed oversight, coordination of sub contractors and systems commissioning as needed at all project locations.As needed performed critical Welding and journeyman duties. Welding certifications held in numerous applications. (GTAW/SMAW ASME Section IX and B31.3, B31.1, 1104)
-
-
-
Triton Marine Construction Corp.
-
United States
-
Construction
-
1 - 100 Employee
-
Pipeline Field Supervisor/ Certified Welder
-
Mar 2001 - Dec 2002
Oversight of welding operations and pipeline construction during installation of 5,800 ft of 10” underground JP-8 fuel piping, as well as above ground filtration and pressure relief system. Performed certified welding and fitting duties to complete 100% radiography requirements. (Welding Certifications ASME Section IX and B31.3 GTAW/SMAW)Attended various job site safety training courses. (Forklift operation, open trench safe working practices, confined space etc.) Oversight of welding operations and pipeline construction during installation of 5,800 ft of 10” underground JP-8 fuel piping, as well as above ground filtration and pressure relief system. Performed certified welding and fitting duties to complete 100% radiography requirements. (Welding Certifications ASME Section IX and B31.3 GTAW/SMAW)Attended various job site safety training courses. (Forklift operation, open trench safe working practices, confined space etc.)
-
-
-
Jacobs
-
United States
-
Business Consulting and Services
-
700 & Above Employee
-
Certified Welder
-
2000 - 2001
Performed as certified welder/fitter in the fabrication of numerous petroleum piping systems. Held welding certifications in various materials both domestic and exotic. Certifications included GTAW/SMAW 70-90S carbon, 304,309,316,342 stainless steel,5% and 9% chrome. Complex pre and post heat treatment of weld zones performed in chrome welding applications. Performed as certified welder/fitter in the fabrication of numerous petroleum piping systems. Held welding certifications in various materials both domestic and exotic. Certifications included GTAW/SMAW 70-90S carbon, 304,309,316,342 stainless steel,5% and 9% chrome. Complex pre and post heat treatment of weld zones performed in chrome welding applications.
-
-
-
TIC - The Industrial Company
-
United States
-
Construction
-
700 & Above Employee
-
Rigging
-
2000 - 2000
Worked as heavy rigging lead man in the successful completion of large scrubber project to meet EPA emissions regulations. Due to confined working areas large ducting and appurtenances were maneuvered into position via complex rigging methods. Air tuggers, tight lines, and chain falls were utilized in lieu of cranes. Worked as heavy rigging lead man in the successful completion of large scrubber project to meet EPA emissions regulations. Due to confined working areas large ducting and appurtenances were maneuvered into position via complex rigging methods. Air tuggers, tight lines, and chain falls were utilized in lieu of cranes.
-
-
-
-
Construction Foreman
-
1996 - 2000
Held Foreman’s position during the overhaul of coal, as well as natural gas fired HRSG power boilers and their piping systems. Performed oversight and field work in boiler making and critical high pressure piping and tube welding. Operated 50 Ton hydraulic crane as needed throughout. Held Foreman’s position during the overhaul of coal, as well as natural gas fired HRSG power boilers and their piping systems. Performed oversight and field work in boiler making and critical high pressure piping and tube welding. Operated 50 Ton hydraulic crane as needed throughout.
-
-
Education
-
Stephen F. Austin State University
Agricultural Development -
Sherman High School