Wesam Tabbakha
DUBAI at China state Construction Engineering- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
Arabic -
Topline Score
Bio
Experience
-
CSCEC Malaysia
-
Malaysia
-
Construction
-
1 - 100 Employee
-
DUBAI
-
Nov 2015 - Present
* Project Engineer : * Project : Viceroy Hotels Resorts Residences Palm Jumeirah – Dubai. Coordinate with the sub – contractor external and internal works issues. Monitoring the execution of quality concerning fit-out related tasks. Assigned to facilitate marble or gypsum installation. Ensure regular project status reports . Maintaining schedules and forecasts through ways of effective communication ,meeting and deliberation of ideas. Ensuring zone/tower proper hand over in finite time frame given. On the spot building materials suggestion and implementation in case of interior design skills. Coordination with MEP services. Assure of all fit out All Activities running as per project base line . Conduct thorough site inspection for all architectural works as per approved shop drawing , specifications and method statement . Show less
-
-
-
Italdeco Technical service group of AKI Investment
-
Dubai - Sheikh Zayed Road
-
Dubai
-
Sep 2013 - Aug 2015
* Project Engineer . Binsina Pharmacy in Al Warqa – Dubai fit–out (Decoration and MEP Works). Nar Café in City Walk Dubai fit–out (Decoration and MEB Works). Fournal De Pier Restaurant (Maintenance work for gypsum wall–wall paper and ceramic fixing). * Project Engineer . Binsina Pharmacy in Al Warqa – Dubai fit–out (Decoration and MEP Works). Nar Café in City Walk Dubai fit–out (Decoration and MEB Works). Fournal De Pier Restaurant (Maintenance work for gypsum wall–wall paper and ceramic fixing).
-
-
-
Al Sahab building contracting in RAK from
-
Ras al-Khaimah - free zone
-
Ras Al Khaimah
-
Aug 2012 - Aug 2013
* Projects Engineer . Supervision and implementation of all decoration works Make all of correspondence and reports required for the workflow. Searching and arranging projects of decoration and supervising them * Projects Engineer . Supervision and implementation of all decoration works Make all of correspondence and reports required for the workflow. Searching and arranging projects of decoration and supervising them
-
-
-
-
Sharjah
-
Aug 2010 - Aug 2012
* Projects engineer . Supervision and implementation of all decoration works projects from ceilings and walls, floors and aluminum installation of kitchens, windows and doors. Coordination for the decoration Make all of correspondence and reports required for the workflow. * Projects engineer . Supervision and implementation of all decoration works projects from ceilings and walls, floors and aluminum installation of kitchens, windows and doors. Coordination for the decoration Make all of correspondence and reports required for the workflow.
-
-
-
Dubai Municipality
-
Dubai - Derah
-
Dubai
-
Aug 2006 - Nov 2010
* Inspector in the Planning Department . Selects certain areas (such as Umm Ramool Industrial - Jumeirah first) and make full scan of the area and to detect irregularities found by both residential villas, industrial, and is the work of the required report and adopted Powered images of irregularities that have been taken from the site and plans in situ of the land to determine its place. Go to the sites required a survey of the area and the land adjacent to the land in question and the disclosure of the land required and knowledge based upon (Commercial - Industrial - Villa ..... etc.) and the work of the report adopted Powered pictures that have been taken and drawings in situ of the land and determine its place . * Selects certain areas (such as street Jumeirah - Al Wasl - .... etc.) and is the work of a full scan of the area through which the knowledge of all business activities exploited in this region Show less
-
-
-
- Al Habtoor Engineering Company - (Al Habtoor Interiors)
-
Dubai - Al Quoz Industrial Third
-
Dubai
-
Jul 2005 - Jul 2006
* Site Engineer . Site engineer in Burjuman center, overseeing the implementation and installation of doors - Installation of wall cabinets - and installation of kitchens. Site Engineer in projects Jumeirah Beach Residences (JBR), overseeing the implementation of the decoration works in the tower CO1 + CO2 from the installation of doors - kitchens - cabinets wall. The work of all correspondence and reports required for projects. During the study period of training at university (Foundation Abu shindiy decoration) Jordan profession: - Architect and interior design for the period from 01, Jun .2002 to 01, Jul.2003. - The work of engineering design and interior decoration for several small projects (Shops Mobiles), villas, overseeing its implementation in the carpentry companies and sites. Make all of correspondence and reports required for the workflow. Coordination with all decoration company. Show less
-
-
Education
-
Applied Science University - Jordan
Bachelor's degree, Interior Design -
Applied Science University,
Bachelor’s Degree, Interior Design -
Arabia College
Associate’s Degree, Interior Designer - Diploma -
Applied High School education
High School, Furniture and Building Carpentry