Wayne Larkin

Piping Supervisor at PJD Engineering
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Repair and Maintenance
    • 1 - 100 Employee
    • Piping Supervisor
      • Apr 2016 - Present

      Polmaide waste energy plant Polmaide waste energy plant

    • Field Engineer
      • Jan 2014 - Present

    • General Foreman
      • Oct 2013 - Jan 2014

    • Piping Superindendent
      • May 2011 - Sep 2013

      Working on the Britannia Longterm Compressor Project for Conoco Phillips & Amec. Demonstrate support for the company's Safety & Environmental Management System; investigate potentially serious situations and implement corrective measures. Routinely perform safety and productivity observations; shop, field, and equipment inspections; and are required to attend various components of technical, developmental and company required safety training. Assist the Project Manager in job planning and work scheduling and coordinate the activities of craft supervisors to ensure effective operations and required productivities. Prepare the major construction equipment list for the project and control the assignment of equipment required by each craft to ensure maximum efficiency. Complete required paperwork and maintain records; prepare and record data necessary to maintain logbooks and complete reports. Assist the PM in change management and project cost and schedule forecasting. Ensure all piping system components are installed per engineered drawings and specifications and that coordinates required quality control checks and inspections. Coordinate required quality control checks and inspections, ensuring that proper documentation is prepared. Review and approve field manpower requisitions for the employment of craft labour Provide detailed scheduling of daily construction activities and coordination between direct hires and subcontractors to avoid conflicts.

    • United Kingdom
    • Facilities Services
    • 700 & Above Employee
    • Piping Superintendent & Supervisor
      • Mar 2001 - May 2011

      Worked on various projects around the UK such as: Chilton Rail depot, Wembley, TATA Steel Scunthorpe, TATA Steel Redcar as a Superintendent. In my job role i liaised with clients about the work they required doing, went out with the client and looked at the job, measured all aspects, priced up the work and sent the price to the client for approvals, ordered materials, made up pipework to clients specifications once completed returned to site, completed all risk assessments and method statements for all jobs required. Review and approve field manpower requisitions for the employment of craft labour Provide detailed scheduling of daily construction activities and coordination between direct hires and subcontractors to avoid conflicts. Routinely perform safety and productivity observations; shop, field, and equipment inspections; and are required to attend various components of technical, developmental and company required safety training. Assist the Project Manager in job planning and work scheduling and coordinate the activities of craft supervisors to ensure effective operations and required productivities. Prepare the major construction equipment list for the project and control the assignment of equipment required by each craft to ensure maximum efficiency. Ordered plant for the jobs, signed on permits and completed all tasks asked for.

Education

  • Dyke House school

Community

You need to have a working account to view this content. Click here to join now