wasif ullah

Electrical Inspector at ITCC Information Technology and Communication Complex
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Saudi Arabia, SA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Civil Engineering
    • 100 - 200 Employee
    • Electrical Inspector
      • Jan 2013 - Present

      Project: CECOS UNIVERSITY Building Extension Block C. Designation: Electrical Engineer. Review design documents/Drawings of all electrical systems to ensure compliance with Project Technical specification and all applicable codes and standards. Design review of all types of schematics & drawings. Monitor quality control procedures during design and construction phases of the project. Responsibilities included checking and verifying that project work meets all specified and applicable codes and standards. Monitor sub-Contractor’s implementation of work, safety and security standards for electrical installations. Design review of all Electrical systems. Supervise the construction, activities for their timely completion according to Schedule. Issue instructions and implementation resource enhancement to meet the schedule mile stone dates. Attending the daily and weekly progress meeting for site work. Preparation of look ahead schedule for all electrical systems drawings and materials. Preparation of progress report for the site electrical works. Routine inspection of site with consultant and for the IR creating on daily basis for the site electrical installations. Coordination with all other disciplines to complete the electrical work on time. Coordination with technical department for electrical issues. Show less

    • Electrical site Engineer
      • Nov 2005 - Feb 2008

      National Engineering Services Pakistan (Pvt) Limited (NESPAK) is Pakistan’s premier consultancy organization. NESPAK was established in 1973 as a private limited company by the Government of Pakistan. One of the top engineering consultancy organizations in Asia and Africa ISO 9001 Quality Management System to the latest version of the standard viz. ISO 9001:2000 Projects: Islamabad Stock Exchange Twin Towers (22 Stories Buildings; Scope of Work: D.G Sets, Power Transformers, HT Switchboard, LT Switchboard, LT Distribution boards, HT / LT Cables, Bus-Bar Trunking System, Small Power / Lighting Wiring, MCCS, Earthing, Light Fixtures, Lightning Protection, Structured Cabling, Fire alarm & detection system etc. Responsibilities: Detail site inspection of the Electrical work to ensure strict adherence to the approved construction drawings and technical specifications. To prepare realistic plans for implementation, critically monitor execution and recommend appropriate and timely curative action for achieving of project objectives. Review the documents and test reports of materials regarding quality and specification requirements. Check the quality of the material at site and get all the unapproved/rejected material remove from the site. Review the material quantity, material submittals and site check request and shop drawings. Assist P.M in meetings at project office with Clients and Contractors to scrutinize the progress of work. Assist P.M in Correspondence with the Client, Regional Office and Contractor. Check the essential arrangements before starting of any electrical activity. Supervise the Electrical work and get proper consolidation during electrical activity. Keep complete record of each activity by filling the Performa. Verification of interim payments. Maintaining and updating record of project office. Preparation of monthly project progress report. Preparation of physical & financial status reports on monthly basis Show less

    • Electrical supervisor
      • Jan 2000 - Nov 2000

      Project: Underground Power Lines Transmission and Distribution System Project in DHA,BAHRIA TOWN Islamabad.; In this Project we are exchanging the over head power transmission and distribution system into the under ground system in the whole DHA and BAHRIA TOWN area. Supervise the following activities; Complete Planning of Pad Mounted Transformers and Distribution Boxes in all sectors on the basis of the calculated approximate load required per subscriber. Laying of Underground 3-phase Power Lines Meggar testing of the cables before giving connections Connecting, testing and commissioning of the RMU’S and Pad Mounted Transformers Distribution Boxes and SLCP (Street Light Panels) Preparation of Quotation and B.O.Q’s, Maintain all the project data, coordination with customers Presentation of Project status in front of our customer as per our progress at each stage Coordination with customer and site engineers and supervisors to overcome their problems Visiting site to see the progress and supervise engineers how to work in a better way Also conducting meetings in office how to work as a team and to achieve our goals on time. Projects: Ministry of Environment and Local Government, Islamabad (10 Stories Building) To be fully aware of the project electrical specifications, drawings and BOQ; • Coordinate with the Consultant regarding all the electrical activities; • Prepare daily work plan; • Ensure that all electrical site activities are conducted under controlled conditions as per shop drawings; • Ensure safe work environments; • Get the approval from consultant as per contract documents “inspection request”; • Ensure that all payable items are already measured & approved by the consultant; Show less

Education

  • Cheonggang Academy
    Diploma, Electrical Engineering

Community

You need to have a working account to view this content. Click here to join now