Waqas Ahmed

Distribution Project Engineer at Energy and Security Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Multan, Punjab, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Business Consulting and Services
    • 1 - 100 Employee
    • Distribution Project Engineer
      • Aug 2022 - Present

    • Pakistan
    • Business Consulting and Services
    • 1 - 100 Employee
    • Field Coordinator
      • Jul 2020 - Aug 2021

      Field Coordinator for PESCO (Peshawar Electric Supply Company) under USAID funded Sustainable Energy for Pakistan SEP and with collaboration of Tetra Tech ES Inc., subcontractor to USAID. Working to improve operational performance and reduction in AT&C losses of PESCO and TESCO. For this purpose, designing a composite project to employ Aerial Bundle Cable (ABC), Advanced Meter Infrastructure (AMI) for the selected consumers, Energy Accounting, Consumer Mapping, Asset Performance Management and Protection System and Volt Var Optimization (VVO) in PESCO. Additionally, helped TESCO to establish a state of art planning and engineering centre equipped with modern software such as SynerGEE (for load flow studies) and ArcGIS (for Asset Management). Which in turn has enhanced infrastructure development and augmented planning and design capacity of technical staff. The main responsibilities are: Preparation of detailed field implementation schedule in close consultation with vendor/contractor. Coordination and monitoring of daily field activities. Planning of AMI Project implementation with closely liaison with PESCO Staff in both Peshawar and Khyber Circles of PESCO. Execution of AMR meters installation i.e. CT/PT and WC Meters. Arrange meetings with PESCO Staff for implementation of the Project to overcome the hurdles faced during the Project. Informing the Project Manager and Engineer about the the project implementation and progress. Prepare daily, weekly and monthly detailed activity and progress reports for the task under execution. Coordinate with DISCO's P&E department for the preparation of LT Proposals and issuance of the work orders. Coordinate and plan site visits of PESCO’s M&T Office for AMI Implementation and with Regional Stores for all field activities such as material movement. Assist in compiling technical and completion reports for the respective interventions in DISCOs. Collection and evaluation of data from the DISCO to gauge post-intervention benefits. Show less

    • Pakistan
    • Construction
    • 100 - 200 Employee
    • Technical Assistant
      • Dec 2019 - Jun 2020

      Technical Assistant in Electrical Department with below mentioned responsibilities: Designing, Installation and Execution of all type of Electrical works. Planning For bifurcation of 11 kV, 0.4 kV Feeders for different discos. Undertake development of the electrical model of the subsequent DISCO system. Contacting and coordinating with Executive Engineer (XEN), Sub Division Officer (SDO), Revenue Officer (RO), Regional Stores regarding all field activities such as material movement, power shut downs etc. Coordinating and planning site visits for DISCOs Technical Team members for Equipment verification. Compiling Technical Completion reports and submitting As-Built Drawings. Load Calculation, installation of equipment such as lighting fixtures, transformers, generator sets, SMPB’s, Panels and its accessories. Devising methodologies to reduce the Electrical losses in the Electrical distribution system. Enhancing the Electrical System reliability by using Electrical Analysis tools. Analyze system failures and suggest appropriate resolutions. Monitoring Electrical System performance and recommending improvement solutions. Enforcing Safety Procedures and ensuring its implementation. Preparing daily, weekly, monthly progress reports. Show less

    • Pakistan
    • Oil and Gas
    • 200 - 300 Employee
      • Aug 2019 - Dec 2019

      Trainee Instrument Engineer in Nashpa Oil Field (10th Aug 2019 to 25th Dec 2019)Worked on instruments inspection, procurement and supervision.Observed and made helping hand in operating pneumatic and electrical control systemsWorked on Compressor Unit Control Panel of Cameron Compressors and Engine Control Management of Waukesha Engines.Connecting Diesel Generation as 3rd power source.Trainee Drilling Engineer at Drilling Operation field: RIG N-4, OGDCL (26th Dec.,2018 to 9th Aug.,2019)Repairing and servicing of machinery, equipment’s, systems and infrastructure of drilling.Managing preventive and major repairing work of oil/gas drilling rigs equipment/system which includes draw works, rotary system, SCR (Silicon Control Rectifiers). Show less

      • Dec 2018 - Jul 2019

      Trainee Maintenance Engineer at Drilling Operation field : RIG N-4, OGDCL (26th Dec.,2018 to 9th Aug.,2019)Procurement of replacing and spare parts of overall systems of rig.Operating different mechanical setups installed such as power engines, gen-sets, mud pumps, superchargers, agitators and hydraulic pressure units and pressure gauges.Worked with drilling fluid section in maintenance and repairing of solid waste equipment’s such as shale shakers, degassers, desilters, mud agitators and different valves installed on mud pits.Ensuring the safety of myself and colleagues in safe work environment and handling the equipment’s, systems and infrastructure according to HSEQ Rules and Regulations.On hand experience and learned about overall systems of drilling rig including power, hoisting, auxiliary, circulating and rotary systems. Show less

    • Pakistan
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Engineering Intern
      • Jul 2015 - Aug 2015

      Intern in Engineering and Procurement Section at Peshawar Office with responsibilities: Installation of GSM based Automatic Meter Reading (AMR) Meters for Power Utility Company- PESCO. Installation of single & three phase RF enable meters in PESCO Peshawar. Performance verification activity of AMR Meters GIS Mapping of LT in PESCO. Planning and installation of Aerial Bundle Conductors (ABC) to reduce the non-technical losses. Basic Training to PESCO Field Operation Team on SYNERGEE Electrical Software for distribution Network Optimization. Issuance of work order for execution of rehabilitation of existing meters. Show less

Education

  • US Pakistan Center of Advanced Study in Energy
    Master of Science - MS, Renewable Energy Engineering
  • Air University
    Bachelor of Engineering - BE, Mechatronics, Robotics, and Automation Engineering

Community

You need to have a working account to view this content. Click here to join now