WANG ZHAOKUN

Construction Manager at China Petroleum
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Jinan, Shandong, China, CN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Design Services
    • 100 - 200 Employee
    • Construction Manager
      • May 2010 - Present

      Date: May, 2017 – CurrentClient: PetronasSize: RAPID P30 PROJECT: Butadiene Storage facilities at Unit 5220 consists of four butadiene storage vessels with total capacity of 6668 MT. Ethylene storage facilities consists of one Ethylene tank with capacity of 12,000MT, Ethylene BOG Compression system, ethylene loading and unloading facilities and associated utilities required.Propylene storage facilities consists of four propylene sphere with total capacity of 10,000 MT, propylene cooler, propylene loading and unloading facilities and associated utilities required.Position: Construction Manager Project Experience 2 Date: September, 2016 – May, 2017 Client: Petronas / iU&ISize:RAPID P14 PROJECT: total of 26000 cube meter crude oil storage farm, including 10 storage tanks (the works in the station including civil, tanks, CP, equipment installation, etc. ).Position: Construction Manager Show less

    • Construction Engineer
      • May 2010 - Jul 2015

      Project Experience 1Date: September, 2013 – July, 2015 Client: Brightoil Petroleum (Holdings) Zhoushan branch company LimitedSize:Totally 1.94 million cube meter crude oil storage farm, including 55 storage tanks (the works in the station including civil, tanks, piping, steel structure, CP, equipment installation, etc. ).Position: Construction engineer Project Experience 2 Date: October, 2011 – May, 2013 Client: CNPC South-East Asia Pipeline Company LimitedSize:Totally 6×100000 meter crude oil storage tank, including 6 storage tanks (the works in the station including civil, tanks, piping, steel structure, CP, equipment installation, etc. ).Position: Construction engineerProject Experience 3Date: May, 2010– August, 2011 Client: Shandong Binhai Hong run pipe logistics Corporation LtdSize:Totally 6×100000 meter crude oil storage tank, including 6 storage tanks (the works in the station including tanks steel structure).Position: Construction engineer Show less

Education

  • Southwest Petroleum University
    Master's degree, Oil and gas material and application
    2010 - 2013
  • China University of Petroleum 中国石油大学(华东)
    Bachelor's degree, Material Processing and Control Engineering

Community

You need to have a working account to view this content. Click here to join now