Walter Ampong

Desalination Plant Shift Supervisor at Rabigh Power Company | RPC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Rābigh, Makkah, Saudi Arabia, SA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Saudi Arabia
    • Utilities
    • 1 - 100 Employee
    • Desalination Plant Shift Supervisor
      • Jun 2014 - Present

      Work as Shift Supervisor in Desalination Plant, IWSPP (Independent Water, Steam and Power Project) at Petro Rabigh Refinery Complex. Supervised every plant activity in the entire shift. Authorizing Work permits and perform Lock-out/Tagged out and isolation of the equipment or system. Take over command responsibilities during emergencies. Support locally for preparation and start-up or shut-down of RO trains, and critical equipment change over. Responds any abnormalities of equipment’s in service Work as Shift Supervisor in Desalination Plant, IWSPP (Independent Water, Steam and Power Project) at Petro Rabigh Refinery Complex. Supervised every plant activity in the entire shift. Authorizing Work permits and perform Lock-out/Tagged out and isolation of the equipment or system. Take over command responsibilities during emergencies. Support locally for preparation and start-up or shut-down of RO trains, and critical equipment change over. Responds any abnormalities of equipment’s in service

    • Saudi Arabia
    • Utilities
    • 1 - 100 Employee
    • Desalination Plant Control Room Operator
      • Mar 2012 - Mar 2014

      Effectively handling of the DCS operation as per set procedure and work instruction. Responsible in smoothly handling the plant during normal operation, start-up/shut-down of RO trains, equipment change-over and ensure all processes and process equipment are operated in accordance with site team’s required control limits and set points. Continuously monitoring the plant parameters and trends for any deviation Effectively handling of the DCS operation as per set procedure and work instruction. Responsible in smoothly handling the plant during normal operation, start-up/shut-down of RO trains, equipment change-over and ensure all processes and process equipment are operated in accordance with site team’s required control limits and set points. Continuously monitoring the plant parameters and trends for any deviation

    • Saudi Arabia
    • Utilities
    • 1 - 100 Employee
    • Desalination Plant Operator
      • Dec 2008 - Mar 2012

      Support locally the desalination plant through proper and effective handling, monitoring and operating of necessary equipment. Responsible in all scheduled activities in the shift at local areas. Continuously monitors conditions of running and static equipment during the shift, and identify problems as they arise and seek appropriate assistance. Perform start-up/shut down of RO units, equipment change-over, chemical unloading and response to any emergency in the entire Desalination plant. Support locally the desalination plant through proper and effective handling, monitoring and operating of necessary equipment. Responsible in all scheduled activities in the shift at local areas. Continuously monitors conditions of running and static equipment during the shift, and identify problems as they arise and seek appropriate assistance. Perform start-up/shut down of RO units, equipment change-over, chemical unloading and response to any emergency in the entire Desalination plant.

    • Japan
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • I&C Technical Supervisor
      • May 2007 - Nov 2008

      Work as Technical Supervisor under I & C Pre-Commissioning Testing Department for IWSPP (Independent Water, Steam and Power Project) Power Plant & Desalination Plant construction in Petro Rabigh Refinery Complex, Rabigh KSA. Perform and supervise all I&C activities such as loop check DCS I/O signals from local instruments, valve drive test, switchgears sequence test, control valves and motor valves calibration, motor and pump test of all drives during pre-commissioning period. Work as Technical Supervisor under I & C Pre-Commissioning Testing Department for IWSPP (Independent Water, Steam and Power Project) Power Plant & Desalination Plant construction in Petro Rabigh Refinery Complex, Rabigh KSA. Perform and supervise all I&C activities such as loop check DCS I/O signals from local instruments, valve drive test, switchgears sequence test, control valves and motor valves calibration, motor and pump test of all drives during pre-commissioning period.

    • Japan
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • I&C Technical Supervisor
      • Oct 2005 - Jul 2006

      Work as Technical Supervisor under Instrumentation and Control Pre-Commissioning Testing Department in BLCP 717 x 2 MW Coal Fired Steam Turbine Power Plant Project at Map Ta Phut Industrial Estate, Amphur Maung Rayong Thailand. Responsible in loop checking digital/analog signals from DCS to local; motor valves, shut-off valves, control valves and air and gas dampers, drive testing and tuning; calibration of instruments and sequence testing of different systems and logic modifications. Work as Technical Supervisor under Instrumentation and Control Pre-Commissioning Testing Department in BLCP 717 x 2 MW Coal Fired Steam Turbine Power Plant Project at Map Ta Phut Industrial Estate, Amphur Maung Rayong Thailand. Responsible in loop checking digital/analog signals from DCS to local; motor valves, shut-off valves, control valves and air and gas dampers, drive testing and tuning; calibration of instruments and sequence testing of different systems and logic modifications.

    • Singapore
    • Appliances, Electrical, and Electronics Manufacturing
    • 100 - 200 Employee
    • Electrical Technician
      • Nov 2002 - Sep 2005

      LRT line 2 Railway Construction Project electrical installation, testing and perform preventive & corrective maintenance during testing & commissioning of electrical power and Rectifier substation, and electrical switchgears and equipment. LRT line 2 Railway Construction Project electrical installation, testing and perform preventive & corrective maintenance during testing & commissioning of electrical power and Rectifier substation, and electrical switchgears and equipment.

Education

  • Samar State University
    BS Electrical Engineering, Engineering
    1989 - 1994

Community

You need to have a working account to view this content. Click here to join now