Wajid Soomro

Plant Manager at Lucky Renewables (Private) Limited [Formerly Tricom Wind Power (Private) Limited]
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Karachi Division, Sindh, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Unemployed
      • Apr 2020 - Present
    • Government Administration
    • 1 - 100 Employee
    • Unemployed
      • Apr 2020 - Present
    • Project Manager Warranty (2 year warranty period)
      • Nov 2016 - Present

      50MW Metro Wind power project & 50MW Gul Ahmed wind power project November 2016 to date Responsibilities • Monitoring & follow-up with EPC contractor for remaining works. • Monitoring of punch list closeout, defects & deficiencies works, As-built drawings, OEM manuals and other project documents to be submitted by EPC contractor. • Monitoring of daily O&M (Operation & Maintenance) activities performed by O&M contractor. • Monitoring & follow-up of scheduled/unscheduled maintenance in accordance with OEM recommendation and approved SOPs. • Coordination with power purchaser and other Govt, agencies for invoices and other plant relevant activities. • Review of daily, weekly and monthly reports and plant performance as per contract. Show less

      • Sep 2013 - Present

      Project: 2: 50MW Gul Ahmed Wind Power Project.Project: 1: 50MW Metro Wind Power Project.• Provide expert leadership and management during the engineering, procurement and construction (EPC) phases of capital project.• Develop and maintain the integrated project schedule, Coordinate all activities associated with the project by the facility, equipment suppliers, engineering and contracted services.• Overall management and coordination of all construction activities from the beginning of the project to start-up. All aspects of quality, cost and personnel safety. • Develop and maintain proper project controls, formulation of proper work breakdown structure, cost tracking, schedule compliance, project documentation& records, ensure execution of construction as per approved drawings/method statements• Timely closing of project to include proper verification of process performance, formal transfer of documentation and materials, final financial accounting / close-out, and project demobilization. Show less

      • Sep 2013 - Mar 2020

    • United Kingdom
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Construction Manager E&I
      • Dec 2010 - Aug 2013

      • Monitoring and assigning work to site Engineers as per site requirements. • Construction Monitoring as per Drawing/Specifications • Material tracking and follow-up local procurement • Reviewing change orders • Daily Progress Monitoring, and Reports • Tracking of Subcontractor Manpower on Daily basis • Coordination with Client and Consultant to Resolve Issues • Liaison With QA/QC and HSE to ensure the Compliance as per Requirements • Budget and Cost Control • Monitoring and assigning work to site Engineers as per site requirements. • Construction Monitoring as per Drawing/Specifications • Material tracking and follow-up local procurement • Reviewing change orders • Daily Progress Monitoring, and Reports • Tracking of Subcontractor Manpower on Daily basis • Coordination with Client and Consultant to Resolve Issues • Liaison With QA/QC and HSE to ensure the Compliance as per Requirements • Budget and Cost Control

    • Lead Electrical Engineer
      • May 2009 - May 2010

      • Inspecting the EPC contractor’s site work to assure the compliance with project’s HSE and Quality Plans and approve construction drawings • Performing in the inspection of materials and equipment by assuring they are within tolerances, grade and quality specified, properly stored and handled. And not damaged. • Checking and verifying all the related inspection requests. • Reporting all the contractor’s non compliances and prepare required NCR’s. • Material tracking and follow-up local procurement. • Frequent contacts with Contractor personnel and Operation team. • Handling Drawings, Documents Updating Show less

    • Construction Manager
      • Nov 2008 - Apr 2009

      • Monitoring and assigning work to site Engineers as per site requirements. • Construction Monitoring as per Drawing/Specifications • Material tracking and follow-up local procurement • Reviewing change orders • Daily Progress Monitoring, and Reports • Tracking of Subcontractor Manpower on Daily basis • Coordination with Client and Consultant to Resolve Issues • Liaison With QA/QC and HSE to ensure the Compliance as per Requirements • Budget and Cost Control • Monitoring and assigning work to site Engineers as per site requirements. • Construction Monitoring as per Drawing/Specifications • Material tracking and follow-up local procurement • Reviewing change orders • Daily Progress Monitoring, and Reports • Tracking of Subcontractor Manpower on Daily basis • Coordination with Client and Consultant to Resolve Issues • Liaison With QA/QC and HSE to ensure the Compliance as per Requirements • Budget and Cost Control

    • Lead Electrical Supervisor
      • Mar 2007 - Mar 2008

      • Site Inspections as per drawing, specification and standards • Reviewing change orders • Subcontractor Daily Progress Monitoring, and Reports • Tracking of Subcontractor Manpower on Daily basis • Material tracking and follow-up local procurement. • As Built Marking on Drawings • Handling Drawings, Documents Updating • Site Inspections as per drawing, specification and standards • Reviewing change orders • Subcontractor Daily Progress Monitoring, and Reports • Tracking of Subcontractor Manpower on Daily basis • Material tracking and follow-up local procurement. • As Built Marking on Drawings • Handling Drawings, Documents Updating

    • Senior Project Engineer
      • Apr 2006 - May 2007

      • Assisting Project Manager in all Matters and working as Acting Project Manager during his Absence. • Evaluation and review of Design drawings, Technical submittals and shop drawings prior to submission to Client according to project standards and specifications • Preparation of Method statement / work instructions as per specification and project requirement. • Preparation of scope of work for assigned Substation ( SS9I) • Coordination and follow up with procurement department, including Technical data reviews, through to receipt of materials and equipment at site. • Monitoring and assigning work to site Engineers as per site requirements. • Daily review meeting with client, senior management, and site Engineers to discuss planned vs. actual progress achieved and resolve the site issues. Show less

    • 1 - 100 Employee
    • Project Engineer
      • Mar 2003 - Mar 2006

      Project: 2: Sialkot International Airport Sialkot Pakistan Project: 1: Project: Sawan Gas Field Development Project Khairpur Mir’s, Pakistan • Preparation of EPC Contract Work schedule for Electrical Works. • Preparation of Method statements for Construction work. • Review and Monitoring of shop drawings preparation at site. • Supervision and Monitoring of Construction activities • Budget and cost control. • Attending meetings with different Authorities. • Close Monitoring and Implementation of safety standard and policies • Coordination with other Disciplines for interfaces in Construction activities. Show less

    • Saudi Arabia
    • Construction
    • 300 - 400 Employee
    • Senior Engineer
      • Apr 2002 - Dec 2002

      • Installation of 13.8KV Switchgear, 20MVA Transformers, Cable lying and termination. • Installation of Cable trays and GI Conduits for cable routing. • Installation of Plant lighting and grounding system. • All Electrical Modification works at Existing pelletizers,A,B,C&D • Meetings with Saudi Aramco Team to solve the construction issues. • “As Built” Drawings marking • Installation of 13.8KV Switchgear, 20MVA Transformers, Cable lying and termination. • Installation of Cable trays and GI Conduits for cable routing. • Installation of Plant lighting and grounding system. • All Electrical Modification works at Existing pelletizers,A,B,C&D • Meetings with Saudi Aramco Team to solve the construction issues. • “As Built” Drawings marking

    • Senior Assistant Manager
      • Sep 2001 - Mar 2002

      • Co-ordination with consultants to finalize the electrical and automation design of the plant based upon the mechanical requirements. • Technical evaluation of offers of different manufacturers about MV/LV panels, instruments, cables. • Technical evaluation of Gird station in accordance with consultant’s design and advise. • Scheduling & planning for electrical & instrumentation erection, testing and commissioning works. • Co-ordination with consultants to finalize the electrical and automation design of the plant based upon the mechanical requirements. • Technical evaluation of offers of different manufacturers about MV/LV panels, instruments, cables. • Technical evaluation of Gird station in accordance with consultant’s design and advise. • Scheduling & planning for electrical & instrumentation erection, testing and commissioning works.

    • Senior Engineer
      • May 1992 - Aug 2001

      Project: 5: Brogue Petrochemical Limited Ruwais, Abu Dhabi Project: 4: Asab Gas Development Project Asab, Abu Dhabi Project: 3: Fauji Jordan Fertilizer Bin Qasim Karachi, Pakistan Project: 2: 4000 TPD Lucky Cement Plant Lakky Marwat, Pakistan Project: 1: Engro Chemical Pakistan Limited Daharki, Pakistan • Preparation of Method Statements for site execution. • Review and evaluate technical submittals and shop drawings prior to submission to consultant/client according to project requirements. • Assign and Monitoring work to Site Engineers in accordance with company procedures. • Daily Meeting with Client and Company Management to solve the Construction issues. • Co-ordination with Planning and Procurement Department. • Fully Guidance to Area Engineers by using strategic policies and different tools& Methods to Improve Progress Efficiency. • Responsible for act as liaison with other disciplines and client managing work interfaces • Handling procurement according to scope of work. • Implementation and monitoring of safety standards • Installation of 13.8 KV /415V -80MVA Transformers. • Installation of 13.8KV Switchgears. • Installation of DC Power system • Installation of LV Switchboards, MCCS • Plant and Building Lighting/Grounding system • Cable trays, Cable Laying and Terminations. • 132KV/11KV-150MVA Transformers and their relevant switchgears at gird station • DC Power (battery banks, ups, inverters) for gird control system. • Cable Laying /Testing and Termination. • 11KV/415V -70MVA Transformers and their relevant switchgears at raw mill feed substation. • Installation of LV Switchboards, MCC’S and Distribution Boards. • Cable trays and G.I Conduits for Cable Routing. • Plant Lighting and Grounding system. Show less

    • Electrical Engineer
      • Jun 1988 - Apr 1992

      Project: Ayub Medical Complex Abbot Abad, Pakistan • Installation of 11KV/440V-200KVA Transformer • LV Switchboards and Lighting Distribution Boards. • Installation of Fire Alarm System • Cable Lying and Terminations. Project: KESC Power Complex Bin Qasim Karachi, Pakistan • Installation of Fire Alarm System • Installation of CCTV and Paging System • Cable Lying and Terminations. Project: Ayub Medical Complex Abbot Abad, Pakistan • Installation of 11KV/440V-200KVA Transformer • LV Switchboards and Lighting Distribution Boards. • Installation of Fire Alarm System • Cable Lying and Terminations. Project: KESC Power Complex Bin Qasim Karachi, Pakistan • Installation of Fire Alarm System • Installation of CCTV and Paging System • Cable Lying and Terminations.

Education

  • Mehran University of Engineering and Technology Jamshoro
    Bachelor's degree, Electrical and Electronics Engineering
    1982 - 1988
  • Mehran University of Engineering and Technology
    B.E Electrical Engineering, Electrical Power
    1982 - 1988

Community

You need to have a working account to view this content. Click here to join now