Wahyu Widiyanto. IPM

Chief Civil Engineer at TOA CORPORATION, CI
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
West Java, Indonesia, ID
Languages
  • English Limited working proficiency
  • Indonesian -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Muhammad Dohar

Wahyu is a reliable person, his priority is to accomplish the task in right manner within tighted schedule. He have proved he got all the skill required to accomplish the project technically and managerially.

Bernardus Ferry

Good Worker with highly motivated person, and good responsibility

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Insinyur Profesional Madya (IPM)
    Persatuan Insinyur Indonesia
    Dec, 2022
    - Nov, 2024
  • SKA Ahli Manajemen Proyek - Muda
    Lembaga Pengembangan Jasa Konstuksi ( Construction Services Development Board )
    Sep, 2015
    - Nov, 2024
  • Program Pelatihan Keselamatan dan Kesehatan Kerja
    Persatuan Insinyur Indonesia
    Jul, 2015
    - Nov, 2024
  • Project Management
    Persatuan Insinyur Indonesia
    Jul, 2015
    - Nov, 2024
  • Insinyur Profesional Pratama ( IPP )
    Persatuan Insinyur Indonesia
    Aug, 2014
    - Nov, 2024
  • Kursus Pelatihan Profesi Insinyur
    Persatuan Insinyur Indonesia
    Jan, 2014
    - Nov, 2024

Experience

    • Côte d'Ivoire
    • Construction
    • 1 - 100 Employee
    • Chief Civil Engineer
      • Jan 2023 - Present

      Involved in : Patimban Port Development Project (II), Package 5; Car Terminal Construction Scope Of Work : - Second layer of construction manager - Prepare & review method statement - Prepare & review construction schedule (daily, weekly & monthly) - Prepare on claims and/or financial progress of the works to client - Cost estimation & cost control - Monitoring progress of the works & database production, simulate into schedule - Supervise & manage works carried out by sub‐contractor - Attend meeting with sub‐contractor, client and other stakeholder if required - Ensure construction in accordance with specification, contract & itp's Show less

    • China
    • Construction
    • 700 & Above Employee
    • QA/QC Manager
      • May 2022 - Nov 2022

      Involved in: Cirata 145MW Floating Solar Power Plant Scope of work : - Supervise all company quality standards and ensure that the system runs properly - Documenting company quality standards - Develop, implement and maintain company’s quality management system - Maintain and implement continuous improvement plans to improve score - Act as management representative and to interact with clients, consultant and relevant stakeholders ensuring compliances, approvals and resolutions of project quality plan, inspection and test plan and complaints/deficiencies - Provide leadership and development of team to cultivate high performance, engagement and retention - Lead the QC team and train the site team on structural and architectural trades/ guide QC engineer on their scope of work - Ensure and control the implementation quality of work (quality control) at the project site following the Inspection and Test Plan (ITP) and Project Quality Plan (PQP) Show less

    • South Korea
    • Construction
    • 700 & Above Employee
    • QA/QC Civil & Architect Leader
      • Dec 2018 - May 2022

      Involved in : Jawa Satu Power, Combine Cycle Power Plant ( 1760 MW ) Cilamaya, Karawang Scope of work : - Prepare, document ITP ( Inspection And Test Plan ) pre construction and construction. - Review method statement of work before implementation on site & check activities of the work base on method of work - Review material approval from dept construction before submit to owner to get approval owner. - Responsible for carrying out supervision directly and indirectly to all inspector and engineer, under his responsibility, among others, provide training in order to reach the minimum threshold level of capability required for team and be able to apply discipline to the team in accordance with the regulations of the company. - Responsible for coordinating cooperation in building a solid team between QA/QC team with construction team and to coordinate all the activities in managing all activities both in the field and at the office. - Responsible for achieving a predetermined employment targets base on time schedule which has been mutually agreed upon between the construction team, contractor and owner. - Guiding and directing team members in preparing all required reports. Prepare document Request for Inspection ( RFI ) to owner, for perform inspections with owner. Conduct inspection of work with owner, - Conduct and supervise all testing activities along with analysis of reports from test results, tests carried out include; PDA, PIT, Sand Cone, FDT, Concrete Compression Test, UPV Ultrasonic Pulse Velocity, Rebar Test, Sieve Analysis, CBR, etc. - As the material control and expeditor, do joint visit to fabricator, for checking before delivery to site, base on packing list, material certificate. - Prepare document project for handing over to owner, NCR etc. - Monitoring all activities project from Earthwork, Pile, Excavation, Foundation Concrete, Steel Structure Erection, Finishing Work Show less

    • Indonesia
    • Construction
    • 1 - 100 Employee
    • QA/QC Civil Leader
      • Aug 2016 - Nov 2018

      Involved in: Jawa 2 Combined Cycle Power Plant ( 1 X 800 mw ) Project Tanjung Priok Jakarta Scope of work : - Prepare, document ITP pre construction and construction. - Make method statement of work before implementation - Make a schedule activities or schedule of work for inspection with owner. - Monitor the progress of work performed, engineer and inspector QC - Responsible for carrying out supervision directly and indirectly to all Inspector and engineer, under his responsibility, among others, provide training in order to reach the minimum threshold level of capability required for team and be able to apply discipline to the team in accordance with the regulations of the company. - Responsible for coordinating cooperation in building a solid team. - Responsible for achieving a predetermined employment targets and in accordance with the rules. - To coordinate all the activities team in managing all activities both in the field and at the office. - Responsible for giving works relating to the activities of the team executing the work. - Guiding and directing team members in preparing all required reports. - To check the results of the work that has been carried out. - Meeting with owner Mitsubishi about QC progrees and QC work plan. - Prepare document Request For Inspection for Owner, and perform inspections with owner. - Collect and check the material certificate, do the testing material and concrete - Preparation document for Handling Over building with mechanical and electrical contractor - As the material control and expeditor joint visit to fabricator, for checking before delivery to site, base on packing list, material certificate Show less

    • Netherlands
    • Food and Beverage Manufacturing
    • 700 & Above Employee
    • Project Engineer
      • Apr 2015 - Apr 2016

      Involved in : Bio-diesel Plant Project Scope of work - To be responsible for check and review of steel and concrete civil drawing for construction from contractor to ensure all specifications - Monitoring and reviewing site progress construction activity, that the work of the contractor in accordance with the contract scope and also time schedule and to ensure actual again as per planning - Checking contract agreement contractor about scope of work, - To give suggestion if any work revision, make action request and site instruction if any works failure during construction. - Arrange meeting coordination with contractors, vendor about progress & problems that exist - Make weekly report to management - Check & approve safety permit document before working. - To assist and control safety matter all of manpower Show less

    • Indonesia
    • Mining
    • 1 - 100 Employee
    • Project Engineer & Project Control
      • Jul 2010 - Mar 2015

      Involved in : Keban Agung Coal Fired Power Plant, Captive 2 x 135 MW, Lahat South Sumatera Indonesia Scope of work - To be responsible for check and review of steel & concrete civil drawing for construction from consultants and vendors to ensure all specifications and requirements already meet the owner. - Coordination with document control, about numbering system follow the Standard Engineering Management System (EMS) - Check and review BOQ, & prepare document for bidding - Checking contract agreement contractor about scope of work, time duration work and mode of payment progress. - Maintains and monitoring engineering design civil, and civil work based on master project schedule and make report status on weekly basis for Management. - Attend weekly coordination meeting with all departments, Civil, Mechanical, Electrical, Procurement, Finance, regarding progress, interfacing work and problems that hinder the progress of the project. - Arrange meeting coordination with contractors, vendor about progress fabrication, & problems that exist. - The check and approve Claim Progress Report from contractors and Collecting Monthly Report from contractors for to make report to management and PLN. - Shop inspection to fabrication/vendor, carry on Factory Accepted Test, and monitoring delivery material / equipment from fabrication to the site. Show less

    • Indonesia
    • Construction
    • 1 - 100 Employee
    • Civil Engineer
      • 2009 - Jul 2010

      Involved in : Muara Tawar Gas Fired Power Plant Extension Block V Project, Captive 1 x 175 – 240 MW, Bekasi West Java Scope of work - Control and monitoring works quality subcontractor by day to day, during run of the project activities - Monitoring and reviewing site progress construction activity also time schedule by three month a look schedule and weekly schedule to ensure actual again as per planning - To check and sign documents such as Bar Bending Schedule, Claim Progress Report - Prepare the progress report, daily activities report to the client (MARUBENI,TEPCO & PLN) - To give suggestion if any work revision, make action request and site instruction if any works failure during construction. - Report to Site Manager about non conformance matters during construction work - Coordination with supervision to ensure the project execution following procedure and specification - To assist and control safety matter all of manpower Show less

    • Indonesia
    • Oil and Gas
    • 1 - 100 Employee
    • Project Engineer
      • Mar 2008 - Sep 2009

      Involved in : Project Coal Fired Power Plant Captive ( 2 x 300 - 400 MW) Rembang, Central Java Scope of work - Clear about contract agreement with subcontractor - Control and monitoring works quality subcontractor by day to day, during run of the project activities - Monitoring and reviewing site progress construction activity also time schedule by three month a look schedule and weekly schedule to ensure actual again as per planning - Prepare the progress report, daily activities report to the client Jasa Management Konstruksi ( JMK PLN ) - Report to Construction Manager about non conformance matters during construction work - To assist subcontractor in preparing work planning and work method/ work procedure referring to drawing and specification - To check and sign documents such as Bar Bending Schedule, Claim Progress Report - To prepare work application Notice Of Inspection (NOI) before jobs will be done - To give suggestion if any work revision, make action request and site instruction if any works failure during construction. - Coordination with supervision ZPT and subcontractor to ensure the project execution following procedure and specification - To assist and control safety matter all of manpower Show less

    • Sweden
    • Telecommunications
    • 700 & Above Employee
    • Coordinator SACME
      • Jun 2006 - Feb 2008

      Scope of work : - Assign and manage SITAC & CME supervisor to perform monitoring site - To ensure services delivered by SP's are following to customer standard requirement - As coordinator to Project Manager SITAC/CME and make report progress for project manager and owner ( customer ) - Manage the SITAC & CME team to control the progress of SITAC & CME, fulfill customer’s implementation schedule - Manage the SITAC & CME team to solve the problem in the project - Support SITAC/CME manager to get to the milestone based on schedule - Make target plan RFI (Ready for Installation) and ATP (Acceptance Test Protocol) - Meeting with owner (customer) about progress, quality and schedule of work - Monitoring all site at area Kalimantan (350-500 Site) Kaltim, Kalselteng Show less

  • Isindo Interbuana
    • Jakarta, Kalbar, Lampung, Sumsel, Kaltim
    • Coordinator SITAC/CME
      • Apr 2004 - May 2006

      Scope of work - Do a search to establish the location of the tower BTS, and socialization to residents around the tower BTS - Care of tower construction permit with the local authorities, such as IMB, RKT, Ijin Gangguan (HO) etc - Supervise the implementation of civil works such as, cut and filling, foundation work for tower, foundation work for shelter, fencing work and access road. - Supervise the implementation of mechanical work and electrical work, such as; erection tower, grounding system. - Coordination with team and project manager for optimal results. - Make time scheduling & budgeting for project and make financial expenditure reporting project - Make progress report to Project Manager - Coordination with consultant and owner for evaluating progress in the site - ATP (Acceptance Test Protocol )with owner and consultant and prepare document for BAST(Berita Acara Serah Terima) Show less

    • Indonesia
    • Chemical Manufacturing
    • 100 - 200 Employee
    • Civil Engineer
      • Jan 2003 - Jan 2004

      Involved in : Project Coal Fired Power Plant Captive 2x 10.8 mw Scope of work : - Monitoring and supervising the work of the contractor from the bore pile, excavation, rebar for foundations Turbine Generator (Power House) and BOILER, pouring concrete and Erection Steel Structure for Balance of Plant (BOP). - Supervise the work of subcontractors include quality of work day to day. - To check and sign documents such as Bar Bending Schedule, Claim Progrees Report from Contractor . - Making Weekly Report about site progress and report to head civil departement - Provide a solution to sub contractor if find some trouble in working - Check methods of work to be performed by the contractor so that the work can be done with optimal Show less

    • Civil Engineer/Project Administration
      • Jan 2002 - Jan 2003

      Involved in : Sumatra Region Road Project ( SRRP ) Loan IBRD Scope of work : - Monitor and supervising the work of the contractor include quality & performance work - Make time scheduling & budgeting for project - Make a report to GS regarding inflows and outflows project - Make weekly report about site progress for General Superintendent ( GS ) - Give a solution to sub contractor if find some trouble in working - Make claim progress/Monthly Contract ( MC) with Consultant Show less

Education

  • Institut Sains dan Teknologi Al-Kamal (ISTA)
    Insinyur, Civil engineering
    1994 - 2001

Community

You need to have a working account to view this content. Click here to join now