Vlad Kushevsky
Excavator Operator at Newforce Energy Services Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Newforce Energy Services Ltd.
-
Canada
-
Oil and Gas
-
1 - 100 Employee
-
Excavator Operator
-
Sep 2023 - Present
Assisting Supervisors and field foreman in general pipeline ground excavation such as but not limited to ROW Stripping and Grade, Ditch, backfill, Bore Support, and Open cut tie in, creek, and hotline crossings. Indirectly communicating with client representatives and inspection groups to adhere to the correct construction specifications/requirements as outlined in general safety meetings. Assisting Supervisors and field foreman in general pipeline ground excavation such as but not limited to ROW Stripping and Grade, Ditch, backfill, Bore Support, and Open cut tie in, creek, and hotline crossings. Indirectly communicating with client representatives and inspection groups to adhere to the correct construction specifications/requirements as outlined in general safety meetings.
-
-
-
Midwest Pipelines Inc.
-
Construction
-
1 - 100 Employee
-
Construction Foreman
-
Jul 2022 - Present
TMEP Spread 5B, NPS 36”, Mainline Backfill, and Creek Restorations, continually learning and working in an environment with some of the industries most stringent environmental, regulations, standards and procedures. Whilst continually developing a robust mindset and ability to execute a high level of degree in Safety, Quality and Production.
-
-
Excavator Operator
-
Jan 2017 - Present
• Trans Canada Pipeline - NGTL Mainline and Expansion loop Packages, NPS 48, Trans Mountain Expansion Project, Spread2, Mainline Ditch, Tie Ins, Hotline and Major Watercourse Crossings, Bore Support
-
-
-
Ledcor
-
Canada
-
Construction
-
700 & Above Employee
-
Construction Foreman
-
Apr 2021 - Present
• Mainline Ditch Foreman, Trans Mountain Expansion Project spread 3/4a NPS 42, Road Bore Foreman, Trans Mountain Expension Project spread 4a NPS 42”, Excavating Mainline Ditch, Steep Slope and specialty Crossings, working along side some of the most enthusiastic and driven people in the industry. • Mainline Ditch Foreman, Trans Mountain Expansion Project spread 3/4a NPS 42, Road Bore Foreman, Trans Mountain Expension Project spread 4a NPS 42”, Excavating Mainline Ditch, Steep Slope and specialty Crossings, working along side some of the most enthusiastic and driven people in the industry.
-
-
-
Surerus Murphy Joint Venture
-
Canada
-
Oil and Gas
-
200 - 300 Employee
-
Excavator Operator
-
Feb 2022 - Apr 2022
TC Energy - NGTL Mainline Karr Creek Package NPS 48” - Major Watercourse Crossings and Tie ins. Coastal Gas Link - Spread 2 Mainline NPS 48” Major Watercourse Crossings and Reclamation Working in conjunction with Survey/Machine Control to ensure the correct Depth of Cover/FLGP/Construction Spec is maintained throughout Construction activities. Adhere to all Contractor and Client HSE policies. TC Energy - NGTL Mainline Karr Creek Package NPS 48” - Major Watercourse Crossings and Tie ins. Coastal Gas Link - Spread 2 Mainline NPS 48” Major Watercourse Crossings and Reclamation Working in conjunction with Survey/Machine Control to ensure the correct Depth of Cover/FLGP/Construction Spec is maintained throughout Construction activities. Adhere to all Contractor and Client HSE policies.
-
-
-
STRAIT Group Ltd.
-
Canada
-
Oil and Gas
-
1 - 100 Employee
-
Excavator Operator
-
Apr 2012 - Apr 2013
Stripping/Grade, Ditch/TieIns. NPS 3,6,8” common ditch Stripping/Grade, Ditch/TieIns. NPS 3,6,8” common ditch
-
-
Education
-
Oscar Romero Secondary School